y T

1

. OPERATING DATA REPORT DOCKET NO.

50 244 DATE October 7, 1986 COMPLETED BY 8 MFN Andrew E. McNama'ra TELEPHONE 315-524-4446 Ext. 301 OPERATING STATUS Ginna Station

1. Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Notes

2. Reportin8 Period.-

Septenber, 1986

'Ihe unit ran at 100% reactor 1520

3. Licensed Thermal Power (MW:):

power level for the entire 490

4. Nameplate Rating (Gross MWe):

period, with one minor excep-470 tion, detailed on page 4.

5. Design Electrical Rating (Net MWe):

490

6. Maxiraum Dependable Capacity (Gross MWe):

47

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 ThrouRh 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr..t o-Da te Cumulative 720 6 551.00 147,671.00

11. Ilours In Reporting Period
12. Number of Ilours Reactor Was Critical 720 5.528.66 113.815.33 0

0 1,687.55*

13. Reactor Reserve Shutdown llours 720 5.479.50 111.504.13
14. Ilours Generator On.Line 0

0 8.5*

15. Unit Reserve Shutdown Ifours 1,093,752 8,090,376 155,813,001
16. Gross Thermal Energy Generated (MWil) 363,424 2,708,674 51,001,530
17. Gross Electrical Energy Generated (MWil)
18. Net Electrical Energy Generated (MWil) 345,916 2.575.600 48.378.917 100%

83.64%

75.51%

19. Unit Service Factor 100%

83.64%

75.51%

20. Unit Availability Factor 102.2%

83.65%

71.26%

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 102.2%

83.65%

71.26%

0%

0.94%

7.04%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Fbbruary 7,1987 - Annual Refmlina and Maintenance

25. If Shur Down At End Of Report Period, Estimated Date of Startup:
26. tinits in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Ctmnulative '1btal Cormnncing January 1,1975

,y, 8701070132 860930 ND YI PDR ADOCK 05000244 PDR

]

s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE October 7.

1986 COMPLETED BY W E h41 m Andrew E. 'McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH SeDtember. 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

477 17.

478 2.

476 18.

478 3.

475 19.

480 4.

479 20.

481 5.

479 21.

484 6.

479 22.

487 7.

479 23.

484 8.

479 24.

481 9.

478 25.

482 10.

479 26.

486 11.

478 27.

485 12.

478 28.

486 13.

480 29.

485 14.

479 30.

485 15.

479 31.

16.

478 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

IMX:KliT NO.

50-344 UNIT NAME R.E. GNNA NUCLEAR POWER PLANT #

UNIT SHUTDOWN AND POWER REDUCTIONS DATE o t h 7, 1986 COMPLETED 15Y M I*%MW Andrew E. M:Namara REPORT MONTH SEP'IDEER TELEPilONE 315-524-4446 Ext. 301 Ginna Station f

i n

=E

'l*

e

  • =g Licensee Couse & Corrective
  • 7 e

.=

Event

{

}$g No.

Date g

g;=

$j 2,

Action to 4

5 R* Port 8 Au F

dE 4

u Prevent Reevrrence e

2 g

u a

i i

No shutdowns or major power reductions to report. One i

j minor power reduction for a j

short period of time is detai1M on page 4.

i l

i i

5, t

1 2

3 4

1 F: Forced Reason:

Method:

Exhibit G - Instructions j

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee 2

C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination

]

F-Administrative G-Operational Error (Explain) 5 atv. ses em Il-Other (Explain)

Exhibit 1 - Same Source.

i

)

t

i NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE October 7, 1986 COMPLETED BY

// h 9.?M h Andrew E. 'McNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH Seotember, 1986 The unit operated at 100% reactor power level for the entire report period, with one minor exception:

On 9/18/86 the power level was reduced to - 98% for a short period to perform a Periodic Test, Standby Auxiliary Feedwater System Flow Check.

II']N

., \\ s i

e*

GINNA STATION MAINTENANCE REPORT

SUMMARY

SEPTEMBER, 1986 During the month of September, routine maintenance and inspections were completed.

Major safety related work included:

1.

M-40 Snubber Inspection (monthly) 2.

MOV-4733 - replace packing gland studs and repack 3.

V-287 - replace hand wheel 4.

R-11/12 - Rad. Monitor - replace filters 5.

Repair coupling welds on "A" RHR Heat Exchanger 6.

1C Aux. Bldg. Exh. Fan - motor overhaul 7.

lA Service Water Pump - minor P.M. Inspection 8.

1B Charging Pump - replace plunger assemblies (repack) l l

l r

l l

y 7.-

L<

D R.

voe g i_.

ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 ROGER W. KOHER ELEC C

E AM WODUCTrON anta(ocE

$ 46-2 700 GINNA STATION October 7, 1986 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555

Subject:

Monthly Report for September, 1986 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1986.

Vr truly yours, Ro r W.

Kober SMS/eeg Attachments cc:

Dr. Thomas E.

Murley NRC (1) 4,

h