OPERATING DATA REPORT DOCKET NO. 50-341 DATE October 14. 1986 UNIT Fermi 2 COMPLETED BY L. P. Breoni TELEPHONE (313) 586-5313 OPERATING STATUS

1. REPORTING PERIOD Seotember GROSS HOURS IN REPORTING PERIOD 225.9**
2.
  • CURRENTLY AUTH POWER LEVEL (MWt) _ 3292 _ MAX DEPEND CAP (MWeNet)

DESIGN ELECTRICAL RATING (MWe Net) 1093 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net) 218.6

4. REASONS FOR RESTRICTION (IF ANY) Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power. (Ref. J. G. Keppler letter of September 12, 1986)

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER HRS REACTOR WAS CRITICAL 47,2 47.2 47.2
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 8.5 8.5 8.5
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GEN (MWH) 9936.0 9936.0 9936.0
10. GROSS ELECT ENERGY GEN (MWH) 740.0 740.0 740.0 ll. NET ELECTRICAL ENERGY GEN (MWH) 0 0 0
12. REACTOR SERVICE FACTOR N/A N/A N/A
13. REACTOR AVAILABILITY FACTOR N/A N/A N/A
14. UNIT SERVICE FACTOR N/A N/A N/A
15. UNIT AVAILABLILITY FALTOR N/A N/A N/A i
16. UNIT CAP FACTOR (Using MDC) N/A N/A N/A
17. UNIT CAP FACT (Using Design MWe) N/A N/A N/A
18. UNIT FORCED OUTAGE RATE N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None

20. IF SHUT DOWN AT END OF REPORT PERIOD, EST DATE OF STARTUP 10/03/86
21. UNITS IN TEST STATUS FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87
  • To be determined ** Initial Electricity at 1406 hours0.0163 days <br />0.391 hours <br />0.00232 weeks <br />5.34983e-4 months <br /> on 09/21/86 g 10gggy ggg g _Qg R

, . . . _ . ._ __ - - ~ __

O AVERAGE DAILY UNIT PONER LEVEL DOCKET NO. 50-341 UNIT FERMI 2 DATE October 14, 1986 COMPLETED BY L. P. Br ea ni TELEPHONE (313) 586-5313 MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne t) 1 0 17 0 2 0 le 0 3 0 19 0 4 0 20 0 5 0 21 30.8 6 0 22 0

7. 0 23 0 8 0 24 0 9 0 25 0

. 10 -

-0 26 0 l

11 0 27 0 12 0 28 0 l

i 13 0 29 0 l

14 0 30 0

( 15 0 31 N/A 16 0 l

l

o UNIT SEUTDGGEi AID PGIER RIEE3'IGEi DOCKETF NO. 50-341 IATE October 14. 1986 UNIT NAME Fermi 2 CCMPIETED BY L. P. Breani TELEPHONE f 313) 586-5313 REIORT MON'IH September i I I I I I I I I I I I I I MemCD & SnUrrING l l l NO. I DATE I F: FORCED I DURATION l REASON I DOWN 'IHE REACIVR I CDRRBCTIVE ACPIONS/CCMMENTS l l l 1 S: SCHEDULED i (HOURS) l (1) I OR REDUCING POWER l l l I I I I I POWER (2) l l l I I I I I I I I I I I I I I I l l 860903 l F l 81.5 i A l 1 l Shut down required by Tech Spe:s l l l l l l l l to repair an isolation valve. l l l l 1 l l l Reported in IER 86-027 dated I l l l l l l l October 2,1986 l l l 1 l I I l I I I I I l l l 1 1 86-0l* I 860923 I F l 217.4 l A l 2 i Simt down to repair condenser tube l l l l l l l l leaks to maintain proper reactor l l l l l l l 1 coolant chemistry. I I I I I I l I I

  • First shutdown to occur after achieving initial electricity.

(1) REASONS A. B2UIPMENP FAILURE (EXPLAIN) E. CPERA'IOR TRAINING AtO LICENSE EXAMINATION B. MAINTENANCE OR TEST F. AININIf7fRATION C. REFUELING G. OPERATIONAL ERROR (EXPIAIN)

D. REGUIATORY RESTRICTION H. OIHER (EXPIAIN)

(2) MEWCD

1. MANUAL 3. AUTCHATIC SCRAM
2. MANUAL SCRAM 4. O'mER (EXPIAIN)

l

', }~

Ra0!do*.",*"

s'Eh* yin oix,e n gn,.y N MM r M , MM NY son airFsetussan48'66 NP 86054 8 gregr_

U. S. Nuclear Regulatory Commission Attention: Director, Office of Resource Management Washington, D.C. 20555 Gentlemen:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for September, 1986 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for September, 1986. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identificd in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact us.

Sincerely, R. S. Lenart Plant Manager Enclosure cc: M. D. Lynch W. G. Rogers G. C. Wright J. G. Keppler D. R. Hahn J. R. Eckert USNRC Document Control Desk Washington, D.C. 20555