JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS September, 1986 During the month of September, there was one significant power reduction which occurred on September 18, 1986. Power was reduced to isolate the AA condenser waterbox as part of a circulating water ingress study. However, the waterbox could not be isolated completely due to a problem with the intermediate gear in the actuator assembly of a waterbox isolation valve. Replacement parts have been ordered for the valve.

The following major safety-related maintenance was performed in the month of September:

1.

Miscellaneous corrective and preventive maintenance was performed on diesel generators.

8701060377 960930 PDR ADOCK 05000364 R

PDR F-6.2

,[ $ Y d;

DOCKET NO.

50-364 UNIT 2

DATE October 2, 1986 J. D. Woodard COSIPLETED BY (205) 899-5156 TELEPHONE 310NTil september 4

DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (SIWE Net)

(5tWe-Net) 819 817 g,

g7 818 808 y

gg

~~

~

- -~ ~ g7 0 --

- _ _.. _.. --- [ 9 - -

564 3

4' 817 689

.g 816 818 3

21 6

818 22 820 822 821 7

g 821 820 g

24 9

820 25-819' 818 818 10 j

o gg 818 27 818 817 819 g2 3

824 817 g3 822 818 14 30 15 817 33 l

16 818 i

I i

I INSTRUCTIONS On this form:t. list the aversge daily unit power !cvelin htWe-Net for esch d y in the reporting month. Compute o

, the neare:t whole megswatt.

(9/77)

O

~

L.

OPERATING DATA REPORT DOCKET NO.

50-364 DATE 10/2/86 4

COMPLETED BY J.D. Woodard TELEPHONE (205)399-5156 s

OPERATING STATUS Notes

1. Unit Name:

Jnwnh M.

Farlev - Unit 2 September, 1986

1) Cunfulative data since
2. Reporting Period:

7-30-81, date of commercial 2652

3. LicensedThermalPower(MWt):

Operation 860

4. Nameplate Rating (Gross MWe):

0#

5. Design Electncal Rating (Net MWe):

872.2

6. Maximum Dependable Capacity (Gross MWe):

829.2

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restncted,If Ag(pet MWe):
10. Reasons For Restrictions,If Any:

This Month Yr.-to-Date Cudmlative 720 6,551 45,336

11. Hours In Reporting Period 720.0 5,340.6 44,147.2
12. Number Of Hours Reactor Was Critical 0.0 0.0 138.0 l
13. Reactor Reserve Shutdown Hours 720.0 5,249.4 38,641.8
14. Hours Generator On.Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 1,871,967 13,241,529 97,476,079
16. Gross Thermal Energy Generated (MWH) 609,480 4,360,600 32,083,488
17. Gross Electrical Energy Generated (MWil) 580,066 4,124,146 30,413,386
18. Net Electrical Energy Generated (MWH) 100.0 e0.1 83.2
19. Unit Service Factor 100.0 80.1 85.2
20. Unit Availability Factor 97.2 75.9 82.5
21. Unit Capacity Factor (Using MDC Net) 97.2 75.9 80,9
22. Unit Capacity Factor (Usins; DER Net)

O.0 3.4 4.6

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration-of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

-26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY Os/06/81 05/08/81 INITIAL ELECTRICITY 05/24/01 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 (4/77)

O O

O S'0-364 UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME J.M. Farley - Unit.2-l DATE october 2, 1986 I

COMPl.ETED gy J.D. Woodard REPORT MONTil sentember TEL.EPilONE (205)899-5156 "s

a re 5 sa :

8

, h

.E _e g

.g E *j Licensec Ev, g%

Cause & Cosreceive No.

Date g;

g

,, g oc Event u9 sr

  • Aciionto i

$E cE jisg Repost #

[O 55 0 Pacvent Hecunence i

6 j

009 860918 S

N/A B

N/A N/A SG TBG Power was reduced to isolate the AA condenser waterbox to check for a condenser tube leak. However, the waterbox could not be completely isolated due to a problem with the intermediate gear in the actuator assembly of the waterbox isolation valve. Replacement parts for the valve have been ordered.

5.

I. ' b

[

6 I

e I

2 3

4 F: Foned Reason:

Method:

Exhibit G lastructions S: Sthedided A-Equi nnens Failure (Explain) 1 -Manual for Pacparailun of Data i

ti Maintenance of Tess 2 Manual Scram.

Enity shecis for I.icensee C Reincling 3 Automatic Scram.

Eveni Repius (1.ER) File (NUREG-D Regulainsy Resiniction 4-Othes (Emplain) 0161)

+

E-Opesator Training & IJcense Examinati'on F-Administrasive 5

j G Opesational tissor (Explain)

Exhibit 4 Same Source 1

(9/77) 11 Othes (Explain) 5

1 As

  • ,7 r

a e

t O

30 007

/

f k

~

~

0

\\

'R*.

s$

\\

tqu., 77ao t

j l

l O

r,.

.j..

+

Mailing Address '-

. Allbama Power Company 600 North 18th Street

. Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower te scwv a ee:7: s n'e:D October 9, 1986 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Josepii M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the September 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

.Yours ver t uly, b'V R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) l l

[.

i i

t s

i l

- -.