Forwards Semi-Annual Long Term Program Rept. Rept Includes Schedule,Commitment Descriptions,Progress Since Last Update & Summary of Changes
ML20207F913
Person / Time
Site: Pilgrim
Issue date: 03/01/1999
From: Ted Sullivan
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20207F918 List:
References
BECO-2.99.020, NUDOCS 9903110355
Download: ML20207F913 (3)


Text

F 4,

l l

Boston Edison l

A BEC ENERGY COMPANY T.A. Sullivan Vice President Nuclear-and Station Director March 1, 1999 BECo Ltr. 2.99.020 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 LONG TERM PROGRAM: SEMI-ANNUAL REPORT This le' sr provides the semi-annual Long Term Program (LTP) L pdate. The update includes a schedule, commitment descriptions, progress since the last update, and a summary of changes. Changes in status since the last submittal are marked by revision bars in the right margins. Also, since the last update, the date of our next refueling outage (#12) has been changed. The new dates are May 8 through June 12,1999.

This submittal contains a new Attachment 4," Summary of Changed Commitments." The attachment is intended to meet the reporting requirement of SECY 95-300, " Nuclear Energy Institutes' Guidance Cccument, Guideline for Managing NRC Commitments," dated December 20,1995.

Schedule revisions include:

. Salt Service Water Severe Accident Management Program Technical Specification Conversion Paject

/

Items completed include:

BWR Thermal Hydraulic Instabilities if you have any questions on the contents of this report, please direct them to Marie T.

Lenhart, Regulatory Affairs Department at (508) 830-7937.

9903110355 990301 PDR ADOCK 05000293

.A. Sullivan R

PDR HVO/MTUcis/LTP/Itp-cvr :

Long-Term Program (LTP) Schedule :

LTP Schedule B ltems :

LTP Schedule C ltems :

Summary of Changed Commitments Pilgrim Nuclear Power Station, Rocky Hill Road, Plymouth, Massachusetts 02360

i U.S. Nucle r Regulitory Commirion Page 2 cc: Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWFN 14820 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockvi:le Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident inspector Pilgrim Nuclear Power Station i

l l

l l

D N

O S

A 00 J

02 J

M A

M F

J D

N O

S e

A lu 9

d 9

J 9

e J, !E!

i t

1Il I

1 hc M

ne S

m A

)

d P

n M

1T em TL F

N(

A 1

f E

J e

o Mm s

Ha D

n 1

Cr e

e Ag N

ic g

To L

a P

Tr O

fo AP R

l S

F.

a m

S v

r A

o r

e 8

C p

9 J

R p

e T-9 1

J N

a t

d e

g g

C lo lp n

M n

R h

m o

i N

n o

L A

ita e

t g

o c

w e

n t

g M

A lp it c

n e

it m

ia j

F o

w o

s r

e J

C A

P T

6

)

9 f

(

e 4

c 2

5 n

2 3

0 2

0 4

0 1

e 4

1 1

0 0

5 0

5 R

r 7

9 9

4 9

6 8

e 8

8 8

9 e

L L

L L

l 9

F 9

f lu3 L

C L

0 R

G G

G G

B0 G

G 1

n o

lic n

it n

r o

i a

u s

n n

a e

is o

m ss r

i r

9 o

r d

ia e

as n

r t

o e

e d

y f

i 9

it n

t t

s 9

a a

n n

H r

v dl i

d n

c t

n a o t

1 i

W a

e la S

o r o s

a n

y f

dt Be a

r e

nc c e ge in ms p C gP e

e i

V l

s R

e lem M

e i

it n c

r e m c De a

0 c

d m ia e

Til Am ei u

e u

B 0

t v

sa ui 2

cm it r

el e

hl P

p x

eg Ti Sc leF n

0 1

t t

2 mr S

e r

b S

e e

f g

sg Vv e a Ra C

hj an is a

h m O

ier lt r

o r

v n t

r e co F

a Ou e a Ws C

er op e

e co SC R

SP S

MS SM Bin E

TP BS D

Y