ML20207F343
| ML20207F343 | |
| Person / Time | |
|---|---|
| Site: | 07001100 |
| Issue date: | 09/22/1986 |
| From: | Brown W NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Lichtenberger ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| References | |
| RTR-NUREG-BR-0007, RTR-NUREG-BR-7 NUDOCS 8701050554 | |
| Download: ML20207F343 (1) | |
Text
lO
- o ano\\o, UNITED STATES
<f
'"f, NUCLEAR REGULATORY COMMISSION 1
g WASHINGTON, D. C. 20555 l
{
tw,,,,,j SEP 2 21986 58"!is' DESIGNATED ORIGINAL C-E Power Systems Combustion Engineering, Inc.
ATTN: Mr. H. V. Lichtenberger Vice President - Nuclear Fuel 1000 Prospect Hill Road Windsor, Connecticut 06095 Gentlemen:
We have reviewed the reporting requirements for licensees subject to 10 CFR Part 75 and have found an error in the " Instructions for Completing Material Balance Report, Physical Inventory Listing and Concise Note Forms,"
NUREG/BR-007, which is referenced by 10 CFR 75.35. The error, found in the footnote on page 19 of the instructions, requires licensees performing an annual physical inventory to submit an additional Material Balance Report based on bcok inventory six months subsequent to the physical inventory. This footnote should be disregarded and Material Balance Reports should only be submitted within thirty (30) days after the start of required physical inventories.
Sincerely, Y
Willard B. Brown, Chief Safeguards Material Licensing and International Activities Branch Division of Safeguards, NMSS grinM ME$j!
C
- ~.
_ _ _