ML20207F282

From kanterella
Jump to navigation Jump to search
Forwards Rev 19 to EPIP ERP-140, Emergency Response Organization (ERO) Call Out. Certain Portions of Procedure Have Been blacked-out to Avoid Disclosing Sensitive Telephone Numbers
ML20207F282
Person / Time
Site: Peach Bottom  
Issue date: 03/05/1999
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20207F286 List:
References
NUDOCS 9903110213
Download: ML20207F282 (1)


Text

w-v, ct; tion Support Department 10CFR50, Appendix E

~.

=r PECO NUCLEAR ecco cee,o, comneev 4

965 Chestertnock Boulevard

. A Unit of PECO Energy Wayne, PA 19087 5691 March 5,1999 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Emergency Response Procedure Revisions

Dear Sir / Madam:

Enclosed is the following procedure revision to the Emergency Response Procedures (ERPs) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. This procedure is required to be submitted within thirty (30) days of its revision in accordance with 10CFR50, Appendix E, and 10CFR 50.4.

ERP-140, Rev.19

  • Emergency Response Organization (ERO) Call Out."

Please note, certain portions of this procedure have been blacked-out to avoid disclosing sensitive telephone numbers.-

Also enclosed, is a copy of a computer generated report index identifying the latest revisions of the ERPs for PBAPS.

If you have any questions or require additional information, please do not hesitate to contact us.

Ve ruly yours,

/

e_

w Garrett D. Edwards Director-Licensing Enclosures -

I/

cc:

H. J. Miller, Administrator, Region I, USNRC (w/ enclosures,2 copies)

A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ enclosures)

/

^"

9903110213 990305 PDR ADOCK 05000277 F

PDR L

u