ML20207E885
| ML20207E885 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 03/04/1999 |
| From: | Diprofio W NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | Collins S NRC (Affiliation Not Assigned) |
| References | |
| NYN-99032, NUDOCS 9903110100 | |
| Download: ML20207E885 (3) | |
Text
-.
North Atlantic Energy Senice Corporation g~ North in sa Seabrook, nil 03874 All3I111C (603) 474-9521 The Northeast Utilities System March 4,1999 Docket No. 50-443 NYN-99032 AR#98021734 i
United States Nuclear Regulatory Commission Attention: Mr. Samuel J. Collins Director, Office of Nuclear Reactor Regulation Washington, D.C. 20555 Correction to Letter NYN-99021 Certification for the Seabrook Station Trainine Simulator In a letter dated February 25,1999 (NYN-99021), North Atlantic Energy Service Corporation (North Atlantic) submitted the Certification for the Seabrook Station Training Simulator along with NRC Form 474, Simulator Facility Certification. A subsequent North Atlantic review of i
the letter identified an administrative error on NRC Form 474. The signature for the authorized representative at the end of NRC Form 474 had not been completed. A completed NRC Form 474 is attached.
Should you require further information regarding this matter, please contact Mr. James M.
Peschel, Manager of Regulatory Compliance at (603) 773-7194.
Very truly yours, NORTil ATLANTIC ENERGY SERVICE CORP.
MALc W. A. DiPro'G[
Station Director cc:
- 11. J. Miller, NRC Regional Administrator J. T. Ilarrison, NRC Project Manager, Project Dhectorate 1-2 R. K. Lorson, NRC Senior Resident Inspector 9903110100 990304 9 l
PDR ADOCK 05000443 1 P
pon
e 9=
[
ENCLO'SURE TO NYN-99032 l
l l
(
I
_ - - ~
a 4
/
NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMR NO 31504138 EXPIRES: 08I31/2001 b#
Estmated buroen pw response to comply with this mandatory information collection request 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> The mformation is used to cerufy a simulation facmty Forward comnants regaramp buroen osumsw to the Records Mann ni Brancti(T 6 F33), V $
st 3",;a'fe,2g,,,,3y ygy,gg,rwg a
R"t"'o"r 'M*e"cP8,.5"o,s".c#.o"n.oe;s"noidet,,a, a curroney vaw C SIMULATION FACILITY CERTIFICATION e
2=3 n aninlo,me the NRC may not conduct or sponsor, and a pesson es not reqwed to respond to, the inwmamm mnecton INSTAUCTIONS: Tbs term in to be fined for mitial cerafmabon, rocertification (if required), and for any change to a simulaban facdity performance tesang plan made after mitial submittal of such a plan PeDwide the followeno mhWmshnn and Check the an v,,;e tmW to mdicate reason fnr submdfal DOCKET NUMBER F/4,lLfTY Seabrook Station so-443 DATE UCENSEE North Atlantic Energy Service Corp., Facility. Operating License NPF-86 2/26/99 j
l The is to certfy that
- 1. The soove named facility lsensee is usms a simulabon facdity consstmg solely of a pianusterenced simulator that meets the requirements of 10 CFR 55 45.
2 Documentation is avadable for NRC renew m acconlunce wem 10 CFR 55 45{b).
- 3. The semuistion 'medity meets the guidance contamed in ANSI /ANS 3 51985 or ANSt/ANS 3 51993,as endorsed tpy NRC Regulatory Guide 1.149 F there era eny EXCEPTIONS to the carbficehon of the stern CHECK HERE [ ] and describe fiAly on addabonal pages as necessary NAME (or other mentricebon) AND LOCATION OF SIMULATION FActLTTY, North Atlantic Energy Service Corporation Seabrook Station PO Box 300 Seabrook, NH 03874-0300 i
SIMULATION F ACILfTY PERFORMANCE TEST ABSTRACTS ATTACHED. (Forpwformance aests conduedad m me panod endmg wIth me dose dmes certi ricefron J d
DESCRIP1;ON OF PERFORMANCE TESTING COMPLETED. ensch addsbanal pages es necessay and sdenWy me Asm descripaan bemp con 6nued.)
N/A X
SIMULATON F ACtLITY PERFORMANCE TEST!NG SCHEDULE ATTACHED. (Fir me cond. set dappronneauty 25 percent dperibrmance feats per year for me burvoer period commencong wrm me dele d the certifwetron )
DESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED. Snach add 46cnolpeges as necessary and eenW me seem desenpban bemg contmuod)
See attached g
PERFORMANCE TESTtNG PLAN CHANGE. (for any modthcebon 80 e performance hostmg plan submrtned on a prowous certification)
DESCRIPTCN OF PERFORMANCE TEST lNG PLAN CHANGE @nech addthonelpages es necessery and dentify me item descrrphon bemp conDnued.)
i I
See attached i
i RECERTIFICAT10N lDescrrbe comecem ectrons taken, enesh results d cornpiened partbrmance Besung m ecoordents w# 10 CFR SS dS(b)(3)(v)
@nech eddthonal pages as necessary and dentify me riam descripnan temp contmund)
Any fame statement or omission en mm document, mctudmg attachments, may be subpoet to own and snmmel sanct.ons I cernfy unoe* penalty of perjury that the mformenon in the document and l
stimenments is true end correct j
$!ONAnlRE-AUTHORIZED REPRESENTATIVE TITLE DATE Station Director n
1 be(h}s
'Y$
, J' in actwisce%e 10 dFh 5sA CTimmunscehons, the form shall be submitted 90 the NRC as loupws' BY MAIL ADDRESSEDp DIRECTOR. OFFICE OF NUCLEAR REACTOR REOULATION BY DELIVERY IN PERSON ONE WHITE FLINT NORTH U.S. NUCLEAR REGULATORY COMMISSION TO THE NRC OFFICE AT.
11SSS ROCKVILLE PIKE WASHINGTON DC 20686 4 001 Rocirvitt.E. MD NRC FORM 474 (619686)
PRINTED ON RECYCLED PAPER l