Text
(
USEC A Global Energy Company May 26,1999 GDP 99-0096 L
Dr. Carl J. Paperiello k
Director, Office of Nuclear Material Safety and Safeguards Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Paducah Gaseous Diffusion Plant (PGDP)
Portsmouth Gaseous Diffusion Plant (PORTS)
Docket No. 71-0832 l
Request for NRC Review of Proposed Changes to the Radioactive Material Packaging and l
Transportation Quality Assurance Program (PTQAP) l
Dear Dr. Paperiello:
l l
The United States Enrichment Corporation (USEC) hereby submits proposed changes to l
UEO-1041, " Radioactive Material Packaging and Transportation Quality Assurance Program,"
l
. for NRC review and approval. This program is referred to in the NRC Quality Assurance Program Approval for Radioactive Material Packages No. 0832.
l The proposed changes to the PTQAP are to reflect a change in the title of the procedure organization manager to Administrative Support Manager for both sites.
! provides a description of the proposed changes and the bases for the changes.
l contains the proposed revision to the PTQAP. Upon receipt of NRC approval of the enclosed changes, the PTQAP will be revised and issued to the NRC using the next sequential revision number.
In order to allow for development ofimplementing procedures, USEC requests that the effective date for this proposed revision be 7 days following NRC approval.
t I
KrO3 h s
9906070109 990526 PDR ADOCK 07100832 G
C PDR 6903 Rockledge Drive, Bethesda, MD 20817-1818 Telephone 301564-3200 Fax 301564-3201 http://www.usec. corn Ollices in Livermore, CA Paducah, KY Portsmouth, OH Washington, DC L
L.
Dr. Carl J. Paperiello
. May 26,1999 GDP 99-0096, Page 2
- Should you have any questions or require additional information, please contact Mark Lombard at (301) 564-3248. As required by 10 CFR 170, Enclosure 3 to this submittal is a check for
$620.00 for review of this document. There are no new commitments contained in this submittal.
Sincerely, bk Steven A. Toelle Nuclear Regulatory Assurance and Policy Manager
Enclosures:
1.
Proposed Changes to Radioactive Material Packaging and Transportrion Quality Assurance Program, USEC Document UEO-1041, May 26,1999, Description of Change (1 page) 2.
Proposed Revision, Radioactive Material Packaging and Transportation Quality Assurance Program, USEC Document UEO-1041, May 26,1999, Removal / Insertion Instructions (3 pages) 3.
USEC Check for $620.00
. cc:
Ms. Patricia Eng, NRC HQ Mr. Robert C. Pierson, NRC HQ NRC Region III Office
'NRC Resident Inspector - PGDP NRC Resident Inspector - PORTS 1
n J
r t-1 GDP 99-0096 Page1of1 Proposed Changes to Radioactive Material Packaging and Transportation Quality Assurance Program USEC Document UEO-1941 May 26,1999 Description of Changes UEO-1041, " Radioactive Material Packaging and Transportation Quality Assurance Program,"
(PTQAP) is proposed to be changed to reflect a change in the title of the procedure organization manager. This title will be changed to Administrative Support Manager. The second paragraph of Section 2.5.2 will be revised to read as follows:
4 The Administrative Support Manager is responsible for the system of preparation, review, approval, and use of procedures and instructions in accordance with the requirements of this PTQAP.
The change is required since USEC is separating the responsibility for training and procedures into two management positions at PORTS. PGDP has completed a similar change under a previous approval.
I l
i L
1 GDP 99-0096 5 Pages Total Proposed ' evision'.
R T
l Radioactive Material Packaging'and Transportation Quality Assurance Program I
USEC Document UE0-1041:
,l %
May 26,1999;
, :~n,
Removal / Insertion Instructionsi Remove Pages Insert Pages i
j lx/x and 7/8 ix/x and 7/8 l
l 1
1 i
l i
l l
i l
l
,V UE0-1041..
PROPOSED May 26,1999 RAC 99X0033(RO)
Revision Summary Page Revision Revision Summarv 4a Revision 4a includes changes to pages 4 and 5. These changes are identified by revision bars.
These changes were approved for inclusion in Revision 4 but were inadvertently omitted.
Revision 4a also adds this Revision Summary Page.
5 Revision 5 revised section 2.5.2 to change the responsibility at PGDP for the system of preparation, review, approval and use of procedures and instmetions from the Training and Procedures Manager to the Procedures Manager. Additionally, section 2.16.2 was revised to transfer the responsibility for development, maintenance and implementation of the corTective action control system from the Administrative Support Manager to the Commitment Management Manager.
6 Revision 6 revises section 2.1.1 to remove reference indicating that USEC is a wholly owned corporation of the United States. It also removes reference to the lease agreement between USEC and the Department of Energy (DOE) for operation of the gaseous diffusion plants (GDPs) and reference to USEC's use of an operating contractor which is redundant to infonnation contained in the Safety Analysis Report (SAR).
7 Revises Section 2.5.2 to reflect that Administrative Support is responsible for the procedures program at PGDP. Revises Sections 2.8.2, 2.13.2, and 2.15.2 to change Materials Management to Work Control. Revises the description of responsibilities in Section 2.5.2 to provide language consistent with Section 2.5.2 of the GDP's Quality Assurance Program Description.
8 The first paragraph of Section 2.7.2 is revised to provide another element to be evaluated as a basis for placing a supplier on the approved suppliers list. The third paragraph of Section 2.7.2 is revised to delete the Engineering Manager responsibility for approval of the supplien list. A general revision is made to provide clarification of requirements and to establish consistency with the QAP Description that is contained in Volume 3 of USEC's 10 CFR 76 Application documents for PGDP and PORTS. Sections revised are as follows: 2.2.5,2.4.2, 2.4.3,2.7.2,2.15.2, and 2.18.3.3. The third paragraph of Section 2.2.5 is revised to reflect a change in the title of the Executive Vice President, Operations. This title is changed to Executive Vice President RAC 99X0033(RO)
The second paragraph of Section 2.5.2 is revised to reflect a change in the title of l Training and Procedures Manager to Administrative Support Manager.
I I
[ Note: The Request for Application Change (RAC) numbers identified above and on the following pages will I
be replaced by the next sequential revision number upon approval and issuance.]
I ix
F~-
l 1
i UEO-1041 October 28,1997 Rev.4a.
'l l
Blank Page i
I X
1 J
n UE0-1041 May 7,1999
.Rev.8.
2.4 PROCUREMENT DOCUMENT CONTROL 2.4.1 General l
The procurement document control system applies to radioactive material packaging and transponation
- SSC items, as described below. This system ensures that applicable regulatory requirements, technical requirements, and PTQAP requimments are included or referenced in procurement documents for the procurement of items and services. This system also establishes provisions for the preparation, review, approval, and control of procurement documents, including changes thereto, 1
l 2.4.2 Responsibilities The Safety, Safeguards, and Quality Manager is responsible for review of specifications that include technical and quality requirements for procurement, developed by engineering, prior to use. The Safety, I
Safeguards, and Quality Manager is also responsible for preparing and maintaining the approved suppliers list.
The Engineering Manager is responsible for the preparation and maintenance of design specifications for identifying the technical and quality requirements necessary to ensure item acceptability. The Engineering Manager is also responsible for development of procedures that define these activities, including the criteria for developing the necessary technical and quality requirements for procurement.
The Central Procurement Director is responsible for purchasing activities and ensuring that items and I
services are procured from approved suppliers on the approved suppliers list when required.
I 2.4.3 - Requirements Written procedures are established for the review of radioactive material packaging and transponation SSC procurement documents including changes. These measures ensure the following:
1.
Documented review and approval by personnel with access to peninent information and who have an adequate understanding of the procurement documents to assure appropriate provisions are transmitted to suppliers to ensure items or services will meet specified requirements.
2.
Procurement documents specify the applicable criteria of 10 CFR 71 Subpan H and Regulatory Guide 7.10, Revision 1, Section 1.4.2 to be complied with by suppliers and described in their quality assurance programs, with appropriate quality assurance provisions specified for subtier suppliers.
3.
Procurement documents specify that the provisions of 10 CFR 21 apply where applicable.
4..
Procurement documents specify that manufacturers of packaging supply appropriate certifications and any other peninent document (e.g., cenificate of compliance, as-built drawings, photographs, sketches, use and maintenance manuals).
5.
Suppliers of non-commercial grade items and services are required by procurement documents to I
evaluate their lower-tier suppliers that supply Q items or services within the scope of the IrfQAP.
I 7
m-
. UE0-104i PROPOSED May 26,1999 RAC 99X-0033 (RO) 2.5 INSTRUCTIONS, PROCEDURES, AND DRAWINGS 2.5.1 General The system established for instmetions, procedures, and drawings applies to radioactive material packaging and transponation SSC items, as described below. Measures are in place to ensure that activities affecting quality are prescribed by documented procedures, drawings, and instmetion, as appropriate, and are accomplished in accordance with these documents.
2.5.2 Responsibilities The Safety, Safeguards, and Quality Manager is responsible for review of selected procedures for inclusion of quality requirements.
The Administmtive Support Manager is tesponsible for the system of preparation, review, approval, and I
use of procedures and instructions in accordance with the requirements of this PTQAP.
The Engineedng Manager is iesponsible for the system of preparation, reviews, and approval of drawings for SSCs within the scope of the l'TQAP.
Organization managers are responsible for developing and approving procedures which control functions or activities within their area of responsibility, as defined in the PTQAP.
- All personnel are required to use and adhere to the requirements of applicable procedures, instmetion, and drawings for activities within the scope of the FTQAP.
2.5.3 Requirements Instmetions, procedures, drawings and other documents pertinent to radioactive material packaging and transponation SSCs provide measures to ensure activities affecting quality are prescribed, including appropriate quantitative or qualitative acceptance criteria for determining that impoitant activities have been satisfactorily accomplished.
Procedures ensure the following:
1.
The requirements for meeting 10 CFR 71.87 are established.
2.
Packaging maintenance and repair are pirscribed with inspection and hold points incorporated as necessary.
3.
Controls for packaging loading and unloading are specified.
8
GDP 99-0033 USEC Check for $620.00
- _ _ - -