Remits Payment of Civil Penalties for 860317-18 Event Involving Withdrawal of Control Rod During Reactor Startup in Sequence Different from That Specified in Control Rod Program,Per 861212 Order
ML20207E557
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/24/1986
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
EA-86-059, EA-86-59, NUDOCS 8701020206
Download: ML20207E557 (1)


Text

g DCS PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 12158841 4000 December 24, 1986 Mr. James M. Taylor, Director

~

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission

)

E Washington, D.C.

20555

SUBJECT:

Peach Bottom Atomic Power Station Unit 3 Order of December 12, 1986 - EA 86-59 7

Dear Mr. Taylor:

I Your letter dated December 12, 1986 forwarded an Order which imposed on Philadelphia Electric Company civil penalties in

..L-the amount of Two Hundred Thousand Dollars ($200,000).

The civil penalties stem from an event that occurred at Peach Bottom Unit 3 on March 17-18, 1986 involving the withdrawal of a control rod during reactor startup in a sequence different from that specified in the control rod program.

Please find enclosed a check payable to the Treasurer of the United States in the amount of Two Hundred Thousand Dollars

&g in payment of the aforementioned civil penalties in compliance M

with the Order.

Should you have any questions or require additional information, please do not hesitate to contact us.

g b

k Very truly yours, fog j

J. S. Kemper i

Senior Vice President Engineering and Production I

cc:

Dr.

T. E. Murley, Administrator, Region I, USNRC k