ML20207E375
| ML20207E375 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 08/10/1988 |
| From: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| FVY-88-60, VYV-88-155, NUDOCS 8808180025 | |
| Download: ML20207E375 (2) | |
Text
- - -.. - - -,
y e
VERMONT YANKEE NUCLEAR 130WER CORPOR ATION P. O BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 August 10, 1989 WV 88-155 FVY 88-60 U. S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk
References:
a) License No. OPR-28 (Docket No. 50-271) b) Letter, WNPC to USNRC, FW 88-37, dated 06-06-88 c) Letter, WNPC to USNRC, Proposed Change No. I to W Physical Security Plan, FVY 88-02, dated 01-05-88
Subject:
Retraction of Page 3-6 from Revision 15 to the Vermont Yankee Physical Security Plan
Dear Sir:
The purpose of this letter is to formally retract Page 3-6 of Revision No.
15 to the Physical Security Plan which vias submitted to you as Reference (b).
This retraction is being made as a result of a telecon between James Lake of VY and Jane Gibson of your staff. Ms. Gibson requested that we retract the change to avoid confusion with changes made to thLs same page as part of W Pro-posed Change No. I to the Physical Security Plan Reference (c)J. This Proposed Cnange is currently under review by the WC. Once the Proposed Change is approved, we will resubmit the revision to Page 3-6 in accordance with 10 CFR 50.54(p).
DOCUW_NT TRANSMITTED KREWITH WFEN SEPA",IED FROM ENCLOSURES, CONTAINS SAFEGUARDS INFORMAT!ON.
HAtOLE THIS DOCUW.NT AS DECONTROLLED.
2T53 5
11 Dobk$$$$
g
Letter to USNRC August 10, 1988 Page 2 The retracted version of Page 3-6 is provided as Attachment A.
Alto attached is a revised Page vii, Index of Revisions by Page.
Attachment A is considered Safeguards Information and shall be withheld from public disclosure in accordance with 10 CFR 2.790.
We regret any confusion that may have resulted from the timing of our sub-mittal.
Should you have any questions, please contact Mr. James Sinclair, Plant Services Supervisor, at our plant site.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPCFATION w
?
Warren P Murphy Vice President a Manager of Operations Enclosure
- 1) Attachment A, Pages vil and 3-6 to the VY Physical Security Plan
\\
DOCUENT TRANSMITTED EREWITH WHEN SEPARATED FROM ENCLOSURES, CONTAINS SAFEGUARDS INFORMATION.
HAG.E THIS DOCUENT AS DECONTROLLEO.