ML20207E368

From kanterella
Jump to navigation Jump to search
Requests Final Radiation Survey of Rockwell Intl Facility Prior to License Termination,To Verify That Residual Radioactivities Meet Requirements of Reg Guide 1.86,Table I
ML20207E368
Person / Time
Site: 05000375
Issue date: 07/16/1986
From: Berkow H
Office of Nuclear Reactor Regulation
To: Wenslawski F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
RTR-REGGD-01.086, RTR-REGGD-1.086 NUDOCS 8607220309
Download: ML20207E368 (2)


Text

4 July 16, 1986 MEMORANDUM FOR: Frank A. Wenslawski, Chief Emergency Preparedness and Radiological Protection Branch, Region V FROM:

Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-8, NRR

SUBJECT:

FINAL SURVEY OF ROCKWELL INTERNATIONAL L-85 REACTOR FACILITY R-118, DOCKET NO. 50-375, PRIOR TO LICENSE TERMINATION Please provide a final radiation survey of the licensed Rockwell International Facility to verify that residual radioactivities meet the requirements of Regulatory Guide 1.86, Table I and the dose limit of S pR/hr at one meter.

i original signed by Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B, NRR DISTRIBUTION:

": Central;F11ejj NRC PDR Local PDR SSPD Reading PNoonan HBernard Diondi

-HBerkow SS D

/D BIS 5PD E

tb:SSPD DP[g SSPD a

44 enarr MDTondi HBerco

/ /86 7 L '/86 0 07//6 /86 07//4/86 8607220309 860716 PDR ADOCK 05000373 P

PDR

~*

,o uay[C UNITED STATES g

[

g NUCLEAR REGULATORY COMMISSION L

'; j WASHINGTON, D. C. 20555 8

%,..... f July 16, 1986 MEMORANDUM FOR: Frank A. Wenslawski, Chief Emergency Preparedness and Radiological Protection Branch, Region V FROM:

Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-8, NRR

SUBJECT:

FINAL SURVEY OF ROCKWELL INTERNAT")NAL L-85 REACTOR FACILITY R-118, DOCKET N0. 50-375, PRIOR TO LICENSE TERMINATION Please provide a final radiation survey of the licensed Rockwell International Facility to verify that residual radioactivitics meet the l

' requirements of Regulatory Guide 1.86, Table I and the dose limit of 5 pR/hr at one meter.

l

/

t

/&

ert N. Berkow, Director l

Standardization and Special l

Projects Directorate l

Division of PWR Licensing-B, NRR l

1 l