ML20207E349

From kanterella
Jump to navigation Jump to search
Notifies That Deposition Scheduled for 861218 Postponed,Per 861216 Discussions Between Author & Jp Hickey Concerning Availability of Documents to Gischel Re Enforcement Action EA-84-137.Related Correspondence
ML20207E349
Person / Time
Site: Crane 
Issue date: 12/16/1986
From: Johnson G
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To: Buchanan D, Jim Hickey
SHAW, PITTMAN, POTTS & TROWBRIDGE
References
CON-#187-2052 CIV-PEN, EA-84-137, NUDOCS 8701020151
Download: ML20207E349 (1)


Text

c 2_O 6 L

,EtATED COR8t SPONUh NS

/

g UNITED STATES f

NUCLEAR REGULATORY COMMISSION a

f I

WASHINGTON, D. C. 20066

g(q q.

9, uiNhc

'86 DEC 19 P2 :42 CFFlu a se.

00CKE Tito A. : P etrt BRAN &

December 16, 1986 Mr. David R. Buchanan c/o J. Patrick Hickey, Esquire Shaw, Pittman, Potts a Trowbridge 2300 N Street, NW Washington, DC 20037 In the Matter of GPU NUCLEAR CORPORATION (Three Mile Island Nuclear Generating Station, Unit No. 2)

Docket No. 50-320 - d. t d T E rJ

_EA 84-137

Dear Mr. Buchanan:

As a result of discussions this morning between Mr. Hickey and myself concerning the availability of documents relating to Mr. Gischel in this

matter, we have postponed your deposition previously scheduled for December 18, 1986.

I regret any inconvenience.

Sincerely, 2

tl <, lisAS i

'l e

jf(C ege J nson Counsel r

RC Staff cc:

Service List 8701020151 861216 s 56 s

PDR ADOCK 05000320 G

PDR

>