ML20207D947

From kanterella
Jump to navigation Jump to search
Offers No Objection to SECY-99-099 Re Transmittal of NRC Staff Evaluation of DOE Topical Rept on Tritium Production Core
ML20207D947
Person / Time
Issue date: 04/26/1999
From: Shirley Ann Jackson, The Chairman
NRC COMMISSION (OCM)
To: Travers W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
990426, SECY-99-099-C, SECY-99-99-C, NUDOCS 9906040116
Download: ML20207D947 (1)


Text

'

{,~

\\

\\

RELEASED TOTHE PDR pa "%'o, No objection.

date~

initials ~

/Q,Qq j

. s neoeeseseeeeeeeeee*

ShirleyAfJacksonf Date l

POLICY ISSUE l

(NEGATIVE CONSENT)

March 31, 1999 SECY-99-099 j

.FOR:

The Commissioners FROM:

Wiiliam D. Travers Executive Director for Operations i

SUBJECT:

TRANSMITTAL OF THE STAFF'S SAFETY EVALUATION OF DOE'S TOPICAL REPORT ON THE TRITIUM PRODUCTION CORE PURPOSE:

This paper transmits to the Commission the NRC staffs evaluation of the Department of Energy's (DOE's) topical report on the tritium production core (TPC).

BACKGROUND:

The staff has been providing review and consultation services to assist DOE under the provisions d the memorandum of understanding between the NRC and DOE dated May 22, 1996.

DOE has developed an attemative design for bumable absorber rods using lithium-6 in place of I

boron-10 to control ree.ctivity in the core and to also produce tritium.. DOE expects that approximately 3300 tritium-producing bumable absorber rods (TPBARs) would be included in l

each core reload of a TPC.

DOE has prepared a topical report addressing how the inclusion of a full-core load of TPBARs in a reactor core affects nuclear plant systems, safety and components analyses, and performance l

of a representative commercial light-water reactor (CLWR). DOE intended that its topical report O

CONTACT:

J. H. Wilson, NRR (301) 415-1108 T,jggh

,, f, s n 3 1

.T D.{ j - 5 7 r c 1, ox 9906040116 'C0426 PDR COMMS NRCC CDRRESPONDENCE PDR fSSSSSSSSSSSSSSSSA