ML20207D680
| ML20207D680 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/23/1986 |
| From: | Williams N STONE & WEBSTER ENGINEERING CORP. |
| To: | Ellis J CASE CONSULTING LABORATORIES, INC. |
| Shared Package | |
| ML20207D684 | List: |
| References | |
| NUDOCS 8612310166 | |
| Download: ML20207D680 (1) | |
Text
m-Ovf pgg pr77an s
2121 N. Cahtornia Blvd. Suite 390. Walnut Creck, CA 94596 415/934-5733 December 23,1986 84042.049 7
b Mrs. Juanita Ellis President, C ASE 1426 S. Polk Dallas, TX 75224
Subject:
Calculations Received from SWEC Independent Assessment Program Comanche Peak Steam Electric Station Texas Utilities Generating Company Job. Nos. 84042/84056
Dear Mrs. Ellis:
Enclosed please find copies of calculations and reports which were provided by SWEC at the December 15th and 16th meeting. These documents include:
1.
" Richmond Insert / Structural Tube Steel Connection, Design Interaction Equation for Bolt / Threaded Rods", RLCA/P142/01-86/008, Rev. O, dated 9/10/86.
2.
SWEC Calculation 15456-NZ(C)-GENX-073," Evaluation of NPSI Rear Brackets Dimensions for Design Calculation", Rev. O, dated 6/3/86.
3.
SWEC Calculation 15454-NZ(S)-G 1,
" General Calculation for Richmond Insert / Tube Steel Connections Design Modification", Rev. 2, dated 7/25/86.
If you have any questions, please call at your convenience.
Very truly yours, YLdb%
.L i
N.H. Williams Project Manager cc Mr. V. Noonan (US NRC) w/ enc!.
Mr. S. Treby (US NRC) w/ encl.
" Ms. A. Vietti-Cook (US NRC) w/ encl. /
Mr. 3. Redding (TUGCO) w/ encl.
Mr. L Nace (TUGCO) w/o encl.
Mr. D. Pigott (Orrick, Herrington & Sutcliffe) w/o encl.
San Francisco Boston Chicago 8612310166 861223 PDR ADOCK 05000445 l l[
A PDR