4 JOSEPR M. FARLEY NUCLEAR PLANT-UNIT 2 NARRATIVE SIDNARY OF OPERATIONS August, 1986 During the month of August, there was one unit shutdown which
- occurred on August 4, 1986.' A reactor trip occurred due to simultaneous-
" General Warnings" on both trains of the Solid State Protection System
. during testing. The A train General Warning was due to the. testing in progress. The B train General Warning was due to a faulty secondary disconnecting contact (SDC) on the B train reactor trip bypass breaker.
The SDC's have been replaced.as needed.
The following major safety-related maintenance was performed in the month of August:
'l.
Miscellaneous corrective and preventive maintenance was.
performed on diesel generators.
2.
A bearing oil leak was repaired in the 2A motor driven auxiliary feedwater pump.
ep }Q kV I
8612310136 860831 PDR ADOCK 05000364 R
ppg
/
~
DOCKET NO.
s0-164 UNIT Two DATE September 2, 1986 COMPLETED BY J.D. Woodard TELEPHONE (205)899-5156 SIONT!!
August DAY AVERAGE DAILY POWER' LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 816 17 816 2
819 13 816
~~~ -~686
-- - -- - --- -- --- g 9.
820 y
820 4'
415 a
3 21 -
817 173 819 811 22 6
7 815 23 808 l
s 817
- 4 808 815 807 25-9 817 804 26 10 3;
812 27 818 12 817 23 817 l3 819 29 828 830 14 817 30
($
R17 31 827 16 815 (MSTRUCTIONS On this form:r. list the versge dsily unit power !cvet in MWe-Net for each d:y in the reporting month.Campute to
, the neare:t whole meg 2 watt.
1 (997)
OPERATING DATA REPORT DOCKET NO.
50-364 DATE 09/03/86 COMPLETED BY J.D.Woodard TELEPHONE (2051899-5156 s
OPERATING STATUS Notes Jnanh M. h rtev-Unit 2
- 1. Unit Name:
Aucust. 1986
- 1) Cumulative data
- 2. Reportug Penod:
since 7-30-81, date
? r,s2
- 3. I W Thermal Power (MWt):
of cot:nnercial opera-860 tion.
- 4. Namepiste Rating (Gross MWs):
829 l
- 5. Design Electrical Rating (Net MWe):
872.2-
- 6. Maximum DependaWe Capacity (Gross MWe):
829.2 l
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Itema Number 3 Through 7) Since 1.ast Report. Give Reasons:
[
N/A l
- 9. Power Level To Which Restncted,if Any (Net MWe):
N/A N/A
- 10. Ransons For Restrictions,If Any:
This Month Yr. to.Dete Cumulative l
744 5,831 44,616
- 11. Hours in Reportug Period
- 12. Number Of Hours Resctor Was Critical 728.4 4.620.6 43.427.2
- 13. F.eae:or Pese.tve SI utdown Hours 0.0 0.0 138.0
- 14. Mours Generscor On.Line 724.5 4.529.4 37.921.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
- 16. Gross Thermal Energy Generated (MWH) 1.865,663 11,369,562 95,604,112 609,406 3,751,320 31,474,008
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 570.198 3.544.080 29.A33.320 97.4 77.7 85.0 I
- 19. Unit Service Factor 97.4 77.7 85.0
- 20. Unit Availability Factor 93.9 73.3 82.3 l
- 21. Unit Capacity Factor (Using MDC Net) 93.9 73.3 80.7
- 22. Unit Capacity Factor (Using DER Net) 2.6 3.9 4.7
- 23. Unit Forced Outage Rate l
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Esch1:
N/A N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status t Prior to Commercial Operation):
Forecast Achieved l
05/06/81 05/08/81 INITIAL CRITICALITY INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 p-,
i UNIT:illU1 DOWNS AND POWER REDUCI10NS DOCKET NO.
50-364~
UNIT NAME J.M. Farley - Unit 2 DATE September 3, 1986 REPORT MONTil August COMPLETEu lly J.D. Woodard TELEPHONE (205) 899-5156' U
.'d sa %
C c
re 53 b5'8"5##
5'#.,
he, Cause & Correceive t
No.
Date E.
S _$
?gx
~
Ewns g7 p
gy,;o,,,
O a
g Cl :j t'
i 533 5 N#P"'I #
g" Prcvent Recurrence "3 '
J 6
1 i
I 008 860804 F
19.5 A
3 86-010-00 AA BKR Reactor trip due to simultaneous
" General Warnings" on both trains of j
the Solid State Protection System during testing. The A train General Warning was due to the testing :in i
progress. The B train General Warning was due to a faulty secondary discon-necting contact (SDC) on the B train reactor trip bypass breaker. The SDC' i
have been replaced as needed.
1 i
I
.?
3 4
F: l'orced Reason:
Method:
Exhibit G - lastructions S: Stheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data Il Maintenance or Test 2 Manual Scram.
Entry Sheets for 1.icensee C. Refueling 3 Automatic Scram.
Event Report (i.ER) File INUREG-l D Regulatoiy Restriction 4-Other (Explain) 01611 I
F-Opesaior Training & Ucense Examination j
F Adtninistrative 5
G Oresational E:ror (lixplain)
Exinbit 1 - Same Source
]
19/77) 11 Othes (E xplain) i
.. p
1 i
s "t
e I
=
g
's L
I P
4
'q L
\\
s P
l 1
4
\\
t E
, - (
k' i
s189101yy
,/ y D,
t n
I C'U" u
m
.M
%J g$
\\
g
^
x m.,g-
\\
s
c_
h' Malling Address Al;bama Power Comp:ny
' ~*
'*~
- 600 North 18th Str;et Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building Alabama Power
~e sa"vn em:: c sts:+m September 9, 1986 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the August 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, requ' red by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours ry t ply, A
M' y
R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy)