ML20207D606

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1986
ML20207D606
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/31/1986
From: Dugstad D, Musolf D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8612310111
Download: ML20207D606 (8)


Text

Tc

. s,_

.4

's'

, a:

k e

NeRRAIIVE_SuddeRY_DE_DEEReIING_EXEERIENCE.

DOCKET NO. 50-282 UNIT PRAIRIE-ISLAND.NO.1-DATE SEPTEMBER 3,-1986 COMPLETED BY DALE DUGSTAD

~

. TELEPHONE 612-388-1121 MONIBl__eUGUSI____1286__

THE UNIT.WAS BASE; LOADED THIS MONTH. N0 SHUTDOWNS.

e e

P 8612310111 860831 PDR ADOCK 05000282 gki R

PDR lI l

g

'r t

-eVEReGE_DeILY_UNII_EDWER_ LEVEL DOCKET NO.'50-232 UNIT PRAIRIE ISLAND NO.i' DATE SEPTEMBER 3, 1986 COMPLETED:BY. DALE DUGSTAD-TELEPHONE 612-388-ii21 MONIH1_..eUGUSI_.._1286_._

DAY eVEEeGEiDeILX_EDWEE_LEYEL 1BWE:NEIl 1

505 2

509' 3

421 4

509 5

509 6

500 7

510 0

500 9

506 is 510 it

~508 12 510 13.

510

~i4 511

-15 507 16 506 17 507 18 506 19 500 20 510 21 512 22 514 23 512 24

'515 25 510 26 514 27 515 28 517 29 511 30 522 31 508 AVERAGE LOADS ABOVE 'iO3 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER

n-e

.+

m DEEReIING_DeIelBEE0BI:

~DOCKETJNO. 50-282 UNIT PRAIRIE ISLAND NO i DATE SEPTEMBER 3,'1986 COMPLETED BY. DALE DUGSTAD:

TELEPHONE 612-380-1121-OEEReIING.SIeIUS

~

ti. UNIT NAME:

EBeIRIE_ISLeND_NO i

2. REPORTING PERIOD:_..eUGUSI____1286___

l NOTES:

l-

3. LICENSED. THERMAL-POWER (MWT)-

1650 l

.l

~ 4.-NAMEPLATE RATING (GROSS MWE):

593 l

l 5.' DESIGN ELECTRICAL RATING (NET'MWE):

530 l

l 16._ MAXIMUM DEPENDAPLE CAPACITY (GROSS MWE): 534 l

l 7.-'HAXIMUM DEPENDABLE: CAPACITY (NET MWE):

503 1____________________i 8.

IF CHANGES 0CCUR IN-CAPACITY RATINGS (ITEMS NUMBER 3.THROUGH 7)

SINCE.LAST REPORT GIVE REASON: NONE_______________________________

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): _NDHE___ __________
10. REASONS FOR RESTRICTIONS, IF ANY:__NONE_______________________________

IBIS _MONIU Y8:IO:DGIE CUdULeIIVE

. 11. HOURS IN REPORTING PERIOD 744 5831 111407 12.. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4983.4 92340.9 L13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.' O 5571.1

14. HOURS GENERATOR ON-LINE 744.0 4960.5 90962.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1218848 7483263 142851876
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 401660 2461780 46663050
18. NET ELECTRICAL ENERGY GENERATED (MWH) 377456 2307587 43735421
19. UNIT SERVICE FACTOR 100.0 85.1 81.6
20. UNIT. AVAILABILITY FACTOR 100.0 85.1 81.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.9 78.7 78.0
22. UNIT CAPACITY FACTOR (USING DER NET) 95.7 74.7 74.1
23. UNIT FORCED OUTAGE RATE 0.0 0.1 7.2
24. FORCED OUTAGE HOURS O '. 0 6.1 7094.1
25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH)-

__.._________________________..NZe________.._______________..___________.

26. - IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE : ________Hle___.'__

m y

UNII_SHUIDOWHS._eHD_EDWEE_EEDUCIION

' DOCKET'NO 50-282 UNIT NAME EEeIEIE_ISLeND_NO.i.

DATE SEEIEMBEE_3 _1226_

COMPLETED BY DELE _DUGSIeD' TELLEPHONE 612_388 1121

-MONIBl_eUGUSI____1206______

DGIE

.IYEE HOURS BEeSON MEIBOD LEB_HudBEB SYSIEd COMEONENI YY/MM/DD 000.0

_86/08/03 S

0.0 B

5 N/A N/A=

N/A-

' TURBINE VALVES TEST.

86/08/25 S

0.0 B

5 N/A N/A N/A AXIAL OFFSET CALIBRATION TEST..

.TYEE REeSON MEIBOD SYSIEd_ CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT TEEE STD S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P805-D5)

C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING &

5-REDUCED LOAD C0dEONENI_ CODE LICENSE EXAMINATION 9-0THER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATOR ERROR H-0THER J

E

"*9

.NeBEeIIVE_SuddeEY_QE_QEEBeIING_EXEERIENCE DOCKET'NO.'50-306 tuNIT PRAIRIE ISLAND NO.2 DATE SEPTEMBER 3, 1986.

COMPLETED.BYEDALE DUGSTAD

. TELEPHONE 612-388-1121-

. dDNIU1__eUGUSI____1286---

.THE UNIT WAS BASE LOADED THIS MONTH. NEAR'THE END OF THE MONTH THE UNIT WENT INTO COASTDOWN OPERATION FOR THE UPCOMING REFUELING OUTAGE'IN OCTOBER. THERE WERE NO SHUTDOWNS.

k e

s eYEEeGE_DeILY_UNII_EQWEE_ LEVEL DOCKET NO. 50-306 UNIT PRAIRIE ISLAND HQ.2 DATE SEPTEMBER 3, 1986 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 MONIU;..eUGUSI_ __17.84__

DeY eVEBeGE. DAILY _EQWEE_ LEVEL _idWE:NEIl 1

507 2

511 3

508 4

508 5

510 6

510 7

511 0

511 9

500 10 513 11 51i 12 512 13 513 14 514 15 512 16 508 17 512 18 508 19 510 20 515 21 512 22 516 23 515 24 515 25 514 26 512 27 513 20 510 29 499 30 507 31 493 AVERAGE LOADS ABOVE 500 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER

t DEEReIING_DeIe_REEORI DOCKET NO. 50-306' UNIT PRAIRIE' ISLAND NO 2 s

DATE TEPTEMBER 3, 1986 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 02EReIING_SIeIUS

.i. UNIT NAME:

EBeIBIE. ISLAND _NO..2

2. REPORTING PERIOD:__eUGUSI___.1286....._

l NOTES:

1

3. LICENSED ~ THERMAL POWER (MWT)-

1650 l

1

4. NAMEPLATE RATING (GROSS MWE):

593 l

l

5. DESIGN ELECTRICAL RATING (NET MWE):

530 l

l

6. MAXIMUM DEPENDABl.E CAPACITY (GROSS MWE): 531 1

1 7.-MAXIMUM DEPENDABLE CAPACITY (NET MWE):

500 1____________________1-8.'IF-CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT GIVE REASON:....NQUE ___

9. EUUER LEU 5L i5~UUi6s RESikEUTEDI'5F" Ui~IUEi~ UE)I.~.'2505E_22_~_~I_~_~I2_~2_~.I

~

~

~

10. REASONS FOR RESTRICTIONS, IF ANY:__NONE___________.___________________

INII_MONIN YR:IO:DeIE CUNULeIIME

11. HOURS IN REPORTING PERIOD 744-5831 102525
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5797.1 89300.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
14. HOURS GENERATOR ON-LINE 744.0 5787.5 08290.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

-1<6.

GROSS THERMAL ENERGY GENERATED (MWH) 1216152 9451849 139124240

17. GROSS ELECTRICAL ENERGY GENERATED (HWH) 402400 3134620 44860700
18. NET ELECTRICAL ENERGY GENERATED (MWH) 379641 2966345 42455632
19. UNIT SERVICE FACTOR 100.0 99.3 86.1
20. UNIT AVAILADILITY FACTOR 100.0 99.3 86.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 102.1 101.7 82.8
22. UNIT CAPACITY FACTOR (USING DER NET) 96.3 96.0 78.1
23. UNIT FORCED OUTAGE RATE 0.0 0.7 3.6
24. FORCED OUTAGE HOURS 0.0 43.5 3253.1
25. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE & DURATION OF EACH)

BEEUELING_QN..DCIOBER_.23IV....

26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE.:.

.N/.e t

~~

U N II_SUUID OWNE_ o HD_ED WEB _BE DU CIl0 V DOCKET NO 50:304 UNIT NAME EBolBIE_ISLhND_HO 2 i

DATE SEEIEMDER_3 _1286_

COMPLETED BY DELE..DUGSI6D TELLEPHONE 612 300 1121

[

MONIU1_6UGUSI_..-_1286-_____

DoIE IYEE UQURS REoSOU UEIUDD LER.NUdDEB SYSIEM COME0HENI YY/MM/DD 000.0 NONE.

4 I

l l

7 IYEE BEeSON

' bEIUDD SYSIEd_ CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD i

S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP

'805-1984(P805-D5)

C-REFUELING 3-AUTO TRIP

~D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING &

5-REDUCED LOAD COMEONENI_ CODE '

LICENSE EXAMINATION 9-0THER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATOR ERROR H-0THER t

m

Northern States Power Company 414 Nicollet Mall Minneapohs, Minresota 55401 Telephone (612) 330-5500 September 8, 1986 Director, Office of Resource Management U S Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Monthly Operating Report August, 1986 Attached are twelve copies of the Monthly Operating Report for August, 1986 for the Prairie Island Nuclear Generating Plant.

Jh w.

David Musolf Manager of Nuclear Suppo Services DMM/ EFE/jlk cc: Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment cuz4

{