Forwards Test Abstracts for Model B-100 Trash Compactor, Nupac Svcs Demineralizer Sys & Nupac Dewatering Sys,In Response to NRC Request for Addl Info Re Alternate Radwaste Bldg Preoperational Tests
ML20207C435
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/23/1986
From: Bailey J
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
GN-1264, NUDOCS 8612300146
Download: ML20207C435 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

., -e Post Offee Box 2625 Birmingham, Alabama 35202 i Telephone 205 8746011 A

Vogtle Project December 23, 1986 Director of Nuclear Reactor Regulation File: X7BC35 i Attention: Mr. B. J. Youngblood Log: GN-1264 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION:

ALTERNATE RADWASTE BUILDING PREOPERATIONAL TESTS

Dear Mr. Denton:

In recent discussions, your Staff requested information in the form of test abstracts for the alternate radwaste facility. Attached are the test abstracts for the:

o Container Products Corporation, Model B-100 Trash Compactor o NUPAC Services Demineralizer System o NUPAC Dewatering System If your staff requires any additional information, please do not hesitate to contact me.

Sincerely, J. A. Bailey Project Licensing Manager JAB /caa Attachment xc: R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig B. W. Churchill, Esquire R. W. McManus M. A. Miller (2) L. T. Cucwa B. Jones, Esquire Vogtle Project File 05 G. Bockhold, Jr. $O 0952V

\ \

{

B61223 A h 05000424 PDR

=

. *. j l

l l

l

(~~g CONTAlfER PRODUCTS CORP MODEi. B-100 TRASH COMPACTOR O

OBJECTIVES

1. To install Model B-100 Trash Compactor consistent with CPC installation / Operating Instructions VM-1171.
2. To ensure that equipment operates as designed.

PREREQUISITES

1. Required component testing and safety checks are complete.

TEST METHOD

1. Components will be connected and powered to test responses of ram, ejector, door limit switches, and control pannel.
2. Pressures on ram and ejector will be checked.

ACCEPTANCE CRITERIA

1. Compactor operates as described in CPC Installation / Operating Instructions VM-1171.
2. Ram pressure is between 2000 lbs. and 2100 lbs.

Ejector pressure is between 700 lbs. and 800 lbs.

6 O

I

l l

l NUPAC SERVICES DEMINERALIZER SYSTEM -

() OBJECTIVES

1. To install components of demineralizer system consistent with NUPAC installation procedure IP-3016-1,
2. To check calibration of associated instruments.
3. To secure domineralizer system for future operation.

1 PREREQUISITES

1. Each component vessel has been hydrostatically tested.

2.

Each instrument has been calibrated.

3. Demineralizer vessels are filled with appropriate bead resin.

TEST METHOD

1. Equipment will be assembled in accordance with NUPAC .

procedure #IP-3016-1.

2. Instrumentation will be recalibrated.

O 3. Equipment will be procedure #IP-3016-1.

tested in accordance with NUPAC ACCEPTANCE CRITERIA

1. Pressure instruments calibrated to + or - 5 psig.
2. Temperature instruments calibrated to + or - 5 degrees Fahrenheit.
3. Demineralizers and all interconnecting hoses and fittings exhibit no leakage when pressurized to 200 psig for 30 minutes.

O

NUPAC DEWATERING SYSTEM -

OBJECTIVE

1. To install NUPAC resin dewatering system consistent with Topical Report No. TP-02-P-A, Revision 1, 6/85.
2. To test operability of. all components and check instrument calibrations for temperature and pressure devices.
3. To secure system for future operation.

PREREQUISITES

~

Required component testing and instrument calibrations are complete.

TEST METHOD

1. Components will be connected and powered to test responses for pump,' blower, cooler and control panel.
2. Instrument calibrations will be checked. '

ACCEPTANCE CRITERIA Dewatering system operates as described in the NRC approved Topical Report No. TP-02-P-A, revision 1, 6/85.

l l