W TENNESSEE VALLEY AUTHORITY SN 157B Lookout Place 4UG 011988 U.S. Nuclear Regulatory Commission

-ATTN:- Document Control Desk Washington, D.C.-

20555

-Gentlemen:

3 In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority-

)

50-328 SEQUOYAH. NUCLEAR PLANT (SQN) - PERFORMANCE TESTING OF REACT 6R RELIEF AND SAFETY VALVES

Reference:

TVA letter from J. A. Domer to E. Adensam, NRC, dated March 18, 1985 Enclosed is an update to the referenced letter for SQN unit 1.

If you have any questions, please telephone Kathy S.-Whitaker at (615) 870-7748.

f Very truly yours.

TENNESSEE LLEY AUTHORITY JL R. Gridley, ector Nuclear Licensing and Regulatory Affairs Enclosure cc (Enclosure):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission e

One White Flint, North

"""'T.

11555 Rockville Pike Rockville, Maryland 20852 Ny Mr. F. R. McCoy, Assistant Director o o g, for Inspection ?rograms TVA Projects Division M rs U.S. Nuclear Regulatory Commission "O

Region II Q

101 Marietta. Street, NW, Suite 2900 (jg Atlanta, Georgia 30323 e a:

f

'Sequoyah Resident inspector o 0:

Sequoyah Nuclear Plant

( O'30

$ $ a..

2600 Igou Ferry Road f)

Soddy Daisy Tennessee 37379 0 g k

An Equal Opportunity Employer

m

- J1 ENCLOSURE PERFORMANCE TESTING OF REACTOR RELIEF AND SAFETY VALVES SQN UNIT 1

.The-original design for SQN included water-filled loop seals on both the power-operated' relief valves (PORVs) and the safety / relief valves (S/RVs).

- Reanalysis of the discharging piping loads after completion of the Electric

~

~ Power Research Institute (EPRI) relief. valve test-program indicated that loads caused by the discharge of the loop seal slug were excessive.

TVA decided to eliminate the PORV loop seals (by rerouting of the piping), to drain the S/RV loop seals, and to install steam trim in the S/RVs. These modifications were implemented on unit i during the refueling outage after fuel cycle 2.

Subsequent to this modification on unit 1, high S/RV tail pipe temperatures were observed that were interpreted to indicate valve leakage past the seat.

To eliminate the leakage, TVA reestav ished the S/RV loop seals.

After evaluating the options available to resolve the issue, TVA implemented the. changes (removing the PORV loop seals, draining the S/RV loop seals, and

- installing the steam trim in the S/RVs) on unit 2 during the refueling outage after fuel cycle 2.

Modifications and additions were made to the supports on the discharge piping to reduce the S/RV flange loads in order to reduce the likelihood of valve seat leakage. As a contingency, modifications were installed to allow operation with a heated loop seal to reduce the magnitude of the slug discharge piping loads; heat tracing and insulation were installed on-the loop seals to maintain elevated fluid temperatures; and supports on the discharge piping were added or modified to accommodate the slug discharge loads.

The piping was qualified to loads predicted with the RELAP5/ MOD 1 and REPIPE computer codes. Seat leakage during startup necessitated the refilling of the loop seals.

In August 1985, SQN units 1 and 2 entered extended shutdowns.

Unit I was nearing completion of the refueling outage at the end of fuel cycle 3, and unit 2 was in fuel cycle 3.

During the extended shutdown, water trim was installed in the unit-1 and unit 2 S/RVs in keeping with the heated loop seal operation. During heatup of unit 2 after the extended outage, S/RV seat leakage and problems with the loop seal temperature control occurred. TVA then decided to reevaluate the options.

TVA now plans to operate units 1 and 2 with drained loop seals and steam trim in the S/RVs. The piping was designed for a heated loop seal discharge and is more than adequate for the steam discharge. The piping has also been

- rigcrously qualified to loads generated with RELAP5/ MOD 1 and REPIPE for discharge of steam from the S/RVs (without PORV actuation) and for steam i

i discharge from the PORVs.

A To eliminate the problems with valve seat leakage, supports have been modified to reduce the S/RV flange loads to within those specified by Crosby Valve and I

(

Gauge Company (the valve manufacturer).

The valves have also been serviced l

and tested by Wyle Laboratories before installation -

.