ML20207B873
| ML20207B873 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 07/27/1988 |
| From: | Kingsley O SYSTEM ENERGY RESOURCES, INC. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8808040306 | |
| Download: ML20207B873 (3) | |
Text
-
6 EVETEM ENEINEY RESENJRCEE, INC.
Ca.in D Vrum p L
EU$7$$7a+cn July 27.1988 U. S. Nuclear Regulatory Comission Mail Station P1-137 Washington, D. C.
20555 Attention:
Document Control Desk Gentlemen:
SUBJECT:
Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 Construction Permit No. CPPR 119 Transmittal of Environmental Protectiori Program Report for Six Months Ending June 30, 1988 AECM-88/2-0003 Attached is a report entitled "Sumary of Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Station (GGNS) Unit 2 for Six Months Ending June 30, 1988". This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1 of Applicant's Construction Permit No. CPPR-119.
Please contact my office if you have any questions concerning this matter.
Your
- uly, I
c ODK:bms
/
Attachment cc: Mr. T. H. Cloninger (w/a)
Mr. H. L. Thomas (w/o) l Mr. R. B. McGehee (w/a)
Mr. R. C. Butcher (w/a) 3gg Mr. N. S. Reynolds (w/a)
N o o.
I
$8 Dr. J. Nelson Grace, Regional Administrator be/a) mo U. S. Nuclear Regulatory Comission Region 11
$6 101 Marietta St., N. W., Suite 29')0 mo Atlanta, Georgia 30323 30 Mr. L. L. Kintner, Project Manager (w/a) oE Office of Nuclear Reactor Regulation
$$d U. S. Nuclear Regulatory Comission Cg/
l Mail Stop 14B20 Washington, D.C.
20555 Il e o io ;rc l mt. w m wes v, l, m:2r
"C"""
J16AECM88072701 - 1
Attachment to-AECM-88/2-0003
SUMMARY
OF ENVIRONMENTAL PROTECTION PROGRAM RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 FOR SIX MONTHS ENDING JUNE 30, 1988 Construction Highlights L
o Unit 2 construction was suspended in September 1985 with approximately 35% of field construction completed based on the estimated manhours needed to complete the Unit. Minimal Unit 2 activities were for the purpose of long term equipment and structural maintenance.
Vehicular Movement o
No "off limit" violations were observed during the reporting period.
Dust Control o
No dust control violations were observed during the reporting period.
Smoke Control o
No smoke violations occurred during the six-month reporting period.
Erosion Control o
Rainfall was recorded on 38 occasions during the reporting period, with an accumulated total of 17.29 inches.
Chemical & Solid Waste Control No violations or improprieties of Mississippi waste disposal o
regulations occurred.
Noise Control No excessive noise levels were detected during the reporting period.
o Sediment Basins A & B o
There were no construction-associated problems with Sediment Basins A or B during the reporting period, J16AECM88072701 - 3
'< -*' * ~
LAtt'chmentbb3 a
AECM-88/2-O Page 2-4 Regional Groundwater Dewatering Wells
- o The'12 regional groundwater wells were read 13 times during the
-reporting period with no problems encountered.
Vegetation Survey o.-
No vegetational abnormalities were observed during the reporting period.
Transmission Lines o
No erosion problems associated with the GGNS transmission lines were identified durin 'he reporting period.