ML20207B859
| ML20207B859 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/22/1999 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| Shared Package | |
| ML20136J028 | List: |
| References | |
| NEL-99-0053, NEL-99-53, NUDOCS 9903080269 | |
| Download: ML20207B859 (2) | |
Text
_ _
~
- ~ - - -
- l I
0:ve Morey Southern Nucle:r Vice Pruident Operating Company Farley Project P.O. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 4
SOUTHERN February 22, 1999 COMN Energy to Serve YourWorld
Docket Nos.:
50-348 NEL-99-0053 50-364
)
U. S. Nuclear Regulatory Commission A'ITN: REIRS Project Manager Office of Nuclear Regulatory Research Washington, D. C. 20555 - 0001 Joseph M. Farley Nuclear Plant 1998 Form NRC 5 Annual Report Ladies and Gentlemen:
In accordance with 10 CFR 20.2206(b), the attached report of the results ofindividual monitoring carried out at the Joseph M. Farley Nuclear Plant (FNP) for 1998 is herewith submitted. The report includes a record for each individual for whom monitoring was either required by 10 CFR 20.1502 or for individuals for whom monitoring was provided but not required. 'Ibe enclosed electronic media contains all the information required by Form NRC 5. A printout of the contents i
of the electronic media is provided for your convenience.
In addition, the following information is provided pursuant to the instructions contained in
' Appendix A of Regulatory Guide 8.7.
File name: "nrc5_98. rep" e'
Date created. January 12,1999 Operatmg system and version used to format the disk: MS-DOS, Version 6.22 Other instructions: If an individual experienced multiple expose periods at FNP during 1998, the doses from the exposure periods have been summed, the monitoring start date provided is the monitoring start date of the individuals first exposme period, and the monitoring end date provided is the monitoring end date of the individuals last e sposure period.
There are no new commitments in this submittal. If you have any questions, please advise.
Respe,tfully submitted, fW
\\
Dave Morey
[>
'l O l
RHM/ahl subfm5. doe
Enclosure:
1998 Form NRC 5 Annual Report 9903080269 990222 7 DR ADOCK 050003 8 i
O
.g q g
^
g g u n.fou o
MD A C-t o
i I
i Page 2
- U. S. Nuclear Regula*my Commission ec:
Southern Nuclear Operatma Comoany i
Mr. L. M. Stinson, General Manager - Farley 1
U. S. Nnetaar Reenlatmv Comniinian Wa=hin-tmi D. C.
I Mr. J. I. Zimmerman, Licensing Project Manager - Farley Dw=aat Control Desk
)
U. S. Nedaar Reenla*my Cammiaair= Reaina II
. Mr. L. A. Reyes, Regional Ad=ia3*ater
{
Mr. T. P. Johnson, Senior Resident Inspector - Farley t
I 1
i 1
I L
I t
I i
I I
l l
I J
l t
P O
p I
h t
a i
l 1
I.
I-I I
f s
4 4