CORWROnwealth Esfisen One First National Plaza, Checapo, Illinois

/ Address Reply to: Poet Omco Sox 767

    • ~

/ Chicago, Illinois 60600 0767 November 26, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC. 20555

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Human Factors Review NRC Docket Nos. 50-454/455 and 50-456/457 Reference (a): November 15, 1983 letter from C. Reed to H.R. Denton

Dear Mr. Denton:

Reference (a) contained Commonwealth Edison's commitment to perform a detailed control room design review (DCRDR) for Byrcn and Braidwood Stations Units 1 and 2.

Enclosed for your review is the DCRDR Final Summary Report.

Volutae 1 of the report summarizes how each phase of the review was performed, the personnel involved in the review and their respective qualifications. Volume 2 of the report contains all human engineering discrepancy (HED) findings, responses and proposed schedules for completing individual corrective actions.

Submittal of this report satisfies condition 1 of Attachment 2 of Facility Operating License NPF-37 for Byron Unit 1, condition C(6) of Facility Operating License NPF-59 for Braidwood Unit 1 and condition C(5) of Facility Operating License NPF-60 for Byron Unit 2.

The overall schedule for completion of the corrective actions is outlined in Section 8 of Volume 1.

The corrective actions will bo implemented before the end of the first or second refueling outage of each unit, after NRC t

approval of the proposed disposition of the HED's.

The proposed schedule for completing corrective actions is contingent upon NRC approval of Commonwealth Edison's disposition of the HED's contained in Volume 2 of the report. The schedule is also subject to the availability cf equipment, outage time for l

[: e each unit, and engineering design lead time.

Some problems affecting more l

'.c d than one emergency response activity may require an evaluation to assure that

$0-integrated corrective action is taken. These activities could also affect the go proposed schedule.

ID O P1 ase direc any questions regarding this matter to this offico.

g 00

-- - n h A

i fjost

,1'

%&,t>hedu A

Yo dea (7]f S J

(.

s.

2-One signed orisinal and fifteen copies of this letter are provided for NRC review. Two bound copies of the DCRDR Final Summary Report are provided.

If additional copies are needed, please contact this office. Also enclosed is a set of photo mosaics of the Byron and Braidwood main control room panels and photographs of HED's identified during the review.

Very truly yours, K.A. Ainger Nuclear Licensing Administrator

/k1j encl.