___
Wisconsin Electnc powen couraur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 VPNPD-86-305 NRC-86-67 July 11, 1986 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U.
S. NUCLEAR REGULATORY COMMISSION Washington, D'.
C.
20555 Attention:
Mr. George Lear, Director PWR Project Directorate 1 Gentlemen:
DOCKETS 50-266 AND 50-301 LICENSEE'S IMPLEMENTATION OF GENERIC REQUIREMENTS POINT BEACH NUCLEAR PLANT My letter to you dated May 30, 1986, provided Wisconsin Electric's response to your letter dated April 30, 1986 regarding a plant-specific listing of generic multi-plant issues.
The attachment to my letter included the completion dates or projected completion dates we had identified for these multi-plant issues.
For a number of issues we had indicated that we either could not identify the subject or had insufficient information to project a completion date.
We have subsequently been contacted by Mr. Colburn of your staff, who requested that we provide a best estimate projected completion date for those items we were able to identify, but for which we had not included a completion date.
The enclosure to this letter includes this information for those twelve items.
In most cases we had been unwilling to project a completion date because the NRC review of the item is still pending and, therefore, requirements regarding the issue are subject to change.
Based on Mr. Colburn's instructions, we have now provided a projected completion date, assuming that the licensing issues, as we understand them at this time, will not be changed
! 0 0
8607100070 860711 iig I PDR ADOCH 05000266 P
Mr. H. R. Denton July 11, 1986 Page 2 during the completion of the NRC review.
In several cases we have now listed completion dates for the issue as we have, based on our interpretation of the issue, finished our action on that specific issue.
I trust you will contact us if you have any questions concerning our actions in this regard.
Very truly yours,
/
/
C. W. F Vice President Nuclear Power Enclosure Copy to Resident Inspector r -,-
e. -,
vw--,
-n-e - -
.-------~~>v---r---,-
.r,-
o PROJECTED LICENSEE COMPLETION DATES TAC NO.
MPA NO.
TITLE STATUS M59128 A-20 10CFR50.62 ATWS Equipment Projected 4/88 M59972 A-21 10CFR50.61 PTS Projected 9/86 d
M52868 B-77 Item 2.1 Equipment Classification Complete 2/85 M53087 B-80 Item 4.1 Reactor Trip Reliability Projected 12/86 M53620 B-85 Salem ATWS 1.2 Data Capability Projected 11/86 M53703 B-86 Salem ATWS 2.2 S-R Components Complete 4/84 M53786 B-87 Salem ATWS 3.2.1 and 3.2.2 S-R Com.
Complete 11/85 M53927 B-89 Salem ATWS 4.2.3 and 4.2.4 Life Com.
Projected 12/86 M55368 B-90 Salem ATWS 4.3 W and B&W TS Complete 8/85 M54013 B-93 Salem ATWS 4.5.2 and 4.5.3 Test Alt.
Projected 1/87 i
M06828 D-05 Plant UPI Model Projected 1/88 M46187 F-66 Nuclear Data Link Projected 12/87 9
I 7/11/86
_.