Informs of Rev to post-restart Scope & Schedule for Design Control Sys & Provides Summary Statements of Commitments
ML20207B266
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/22/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808020288
Download: ML20207B266 (3)


Text

-

e TENNESSEE VALLEY AUTHORITY CH ATTANOOG A, TENNES$EE 37401 SN 157B Lookout Place

'JUL 221988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - REVISION TO POSTRESTART SCOPE AND SCHEDULE FOR DESIGN CONTROL SYSTEM

Reference:

TVA letter to NRC dated May 4, 1988 In the referenced letter TVA revised the completion schedule for the design criteria of the safety-related systems.

TVA anticipated completing this work by May 31, 1988, except for the radiation monitoring system design criteria, which was to be completed by June 30, 1988.

This comitment included a total of eight systems.

The design criteria has been issued for four of the systems. Design criteria for the other four systems has not been issued.

The previous completion schedule was based on interface review and resolution of coments. However, the interface reviews required more time than originally anticipated.

This was because of the overall emphasis on unit 2 restart issues and the corresponding lower priority for the postrestart tasks. Also, the Interface and in-department review comnents were nore numerous and difficult to resolve than anticipated.

Summary statements of commitments contained in this submittal are provided in the enclosure.

Please direct questions concerning this issue to M. J. Burrynski at (615) 870-6172.

Very truly yours, TENNESSEE VALLEY AUTHORITY he $.

hbk

$$$!0 $!00b$27 Gridley, Olrector P

PDC Nuclear Licensing and Regulatory Affairs

$0Y 1

Enclosure I

l l

cc: See page 2 l

An Equal opportunity Employer

U.S. Nuclear Regulatory Commission tg g cc (Enclosure):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Comission One Hhtte Fitnt, North 11555 Rockville Pike Rockville, Haryland. 20852 Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Comission Region II 101 Harletta Street, NW, Suite 2900 Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

~

ENCLOSURE-REVISION TO POSTRESTART SCOPE AND SCHEDULE FOR DESIGN CONTROL SYSTEMS LIST OF COMMITHENTS The design criteria will be issued for the following systems by July 29, 1988.

1.

Radiation Monitoring System 2.

Reactor Coolant Syttem 3.

Spent Fuel Pit Cooling System 4.

Fuel Handling and Storage l