ML20207B211

From kanterella
Jump to navigation Jump to search
Forwards Vols I & II of Fifteenth Yr Physical Surveillance of ANO - Unit 1 Primary Reactor Containment Bldg. No Abnormal Degradation Evident in Bldg Post Tensioning Sys
ML20207B211
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/20/1988
From: Howard D
ARKANSAS POWER & LIGHT CO.
To: Calvo J
Office of Nuclear Reactor Regulation
Shared Package
ML20207B217 List:
References
NUDOCS 8808020268
Download: ML20207B211 (1)


Text

-

e r

ARKANSAS POWER & LIGHT COMPANY FOST OGICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (5011371-4000 July 20, 1988 1CAh078810 Document Control Desk Mail Station P1-137 Washington, DC 20555 t

ATTN: Mr. Jose A. Calvo, Director Project Director, Region IV Division of Reactor Projects III, IV, V and Special Projects

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Fif teenth Year Tendon Surveillance Report

Dear Mr. Calvo:

In accordance with Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specifications 4.4.2.2 and 6.12.4, the Arkansas Power and Light Company (AP&L) is submitting the report of activities conducted pursuant to the fif teenth (15th) year surveillance inspection of the ANO-1 reactor building post-tensioning system.

The results of the surveillance indicate that no abncrnal degradation is evident in the ANO-1 reactor building post-tensioning system, four (4) copies of the final report are enclosed.

Very truly yours.

- n Dan R. Howard Mar.tger Licensing CRH:MT:de

' p\ 1

\ \

h 8308020268 850700 7 nn n~w f

- - - - -