ML20207A926

From kanterella
Jump to navigation Jump to search
Ack Receipt of Reporting Results of Insp on 860630-0702 as Noted in Insp Rept 70-1113/86-13.Agrees W/Nrc Intention Not to Place Insp Rept in Pdr,Per 10CFR2.790
ML20207A926
Person / Time
Site: 07001113
Issue date: 07/28/1986
From: Winslow T
GENERAL ELECTRIC CO.
To: Barr K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20207A900 List:
References
FOIA-86-704 NUDOCS 8611110401
Download: ML20207A926 (1)


Text

_

GENERALh ELECTRIC NUCLEAR FUEL & COMPONENTS MANUFACTURING GENERAL ELECTRC COMPANY

  • P O. BOX 780
  • WILMINGTON. NORTH CAROUNA 28402 July 28, 1986 c3 cn r3 s.. n h C.'

7.

Mr. Kenneth P.

Barr, Chief 35 cE

'" I Nuclear Materials Safety & Safeguards Branch U. S. Nuclear Regulatory Commission, RII A.

d P. G. Box 2203

^

Atlanta, Georgia 30301

Dear Mr. Barr:

References:

(1) NRC License SNM-1097, Docket 70-1113 (2) NRC Inspection Report 70-1113/86-13 dated 7/16/86, received 7/21/86 Thank you for your letter reporting the results of the inspection conducted on June 30 through July 2, 1986, at our licensed fuel fabrication plant by Mr. G.

F. Gibson of your office.

As stated in your letter, General Electric Company agrees with your intention not to place the subject inspection report (with the exception of the cover page) in the Public Document Room pursuant to 10 CFR 2.790(d).

Very truly yours, GENERAL ELECTRIC COMPANY W,=

=$3 T.

Preston Winslow, Manager Licensing & Nuclear Materials Management M/C J88 TPW:bsd SGD-I 8611110401 861028 PDR FOIA RATNER 86-704 PDR

USm

/

-p at 4' UNIT E3 sTC.T E s

/

'c, NUCLEAR REGULATORY COMMIS$10N

?'

REGeoh lt j.

I

/

10l M ARit TT A sTRt tT.h w

.o t

ATL ANT A,Gf ORGt A 30373 SEP 10 GSS J

General Electric Company ATTN:

Mr. Eugene A. Lees, General Manager Nuclear Fuel and Component Manufacturing P. O. Box 780

.Wilmington, NC 28402 Gentlemen:

SUBJECT:

REPORT NO. 70-1113/86-15 Thank you for your response of August 29, 1986, to our Notice of Violation issued on August 1,1986, concerning activities conducted at your Wilmington facility under NRC License No. SNM-1097. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperatior in this matter.

Sincerely, yt Edward McAlpine, Acting Chief Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards cc:

T. Preston Winslow, Manager Licensing and Nuclear Materials Management e

p6vfq3y.

@h

r

/

SEP 19 GM General Electric Corpany ATTN: Mr. Eugene A. Lees, General Manager Nuclear Fuel and Component Manufacturing P. O. Box 780 Wilmington, NC 28402 Gentlemen:

SUBJECT:

REPORT NO. 70-1113/86-16 Thank you for your preliminary response of August 28, 1986, to our Notice of Violation issued on Au<, st 6, 1986, concerning activities conducted at your Wilmington facility under NRC License No. SNM-1097. In that letter you requested an extension of tirre to respond to the Notice of Violation.

Since cause for such an extension of time was shown, the date of your response is hereby extended to October 3, 1986.

Should you have any questions concerning this matter, please contact us.

Sincerely, J. Philip Stohr, Director Division of Radiation Safety and Safeguards cc:

T. Preston Winslow, Manager Licensing and Nuclear Materials Management bcc: Document Control Desk Safeguards and Materials Program Branch, EWS-305 Safeguards Material Licensing and International Activities Branch, 881-55 State of North Carolina License-Fee Management Branch o

RII RII RII RI ICV Cd '.t.

DWJdnes:lb JBfahle

@Jj Bates

%\\

EJ 1 pine 09/A /86 09/ C/56 09//c/86 09/15/86 x

y(069O W 3 f~\\

<p -

-