ML20207A838

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EPIP 2.2, Unusual Event-Plant & Company Personnel Notification & Rev 3 to EPIP 3.2, Alert-Plant & Company Personnel..
ML20207A838
Person / Time
Site: Point Beach  
Issue date: 06/27/1986
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML20207A843 List:
References
NUDOCS 8607170291
Download: ML20207A838 (1)


Text

o l

Wisconsin Elecinc eaara coupsur 231 W. MICHIGAN, P.O. B0X 2046 MILWAUKEE WI 53201 June 27, 1986 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U.

S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555 Attention:

Mr. G. Lear, Project Director PWR Project Directorate No. 1 Gentlemen:

DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 & 2 Enclosed are three copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures.

These revisions concist of page changes which should be filed in your copies of the subject document in accordance with the attached instructions.

Please note that procedures and forms that contain names and telephone numbers are stamped "NRC ONLY, Not For Public Disclosure."

Copies of affected forms and procedures, with names and numbers deleted, are provided to assure confidentiality and facilitate your distribution to the public documents room.

Please return the receipt forms for these copies to:

Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 Very truly.yo rs,

/b' p sl C. W.

Fa Vice President - Nuclear Power Enclosure copies to NRC Resident Inspector d

Incident Response Center, Region III l

t I

CaG7G3Gi,i BoGo2 r 4-66LCA --^^^"

  • 0607170291 860627

+

PDR ADOCK 05000266

- - - - - - - - - - - - - -