ML20207A789

From kanterella
Jump to navigation Jump to search

Notification of 990602 Meeting for Docket 7201028 with Gesellschaft Fur Nuklear-Behalter Mbh (Gnb) in Rockville,Md to Discuss Castor X/32 Design
ML20207A789
Person / Time
Site: 072*****, 07201028
Issue date: 05/24/1999
From: James Shea
NRC
To:
NRC
References
07201028, 7201028, TAC-L22895, NUDOCS 9905270280
Download: ML20207A789 (2)


Text

y

^ - * *

.f May 24,' 1999 MEETING NOTICE Organization: Gesellschaft for Nuklear-Behalter mbH (GNB)

Date and Time: June 2,1999 9:00 am - 12:30 pm Location:- U.S. Nuclear Regulatory Commission One White Flint North Building, Rm. O 68-11 11555 Rockville Pike Rockville, Maryland 20852

Purpose:

To discuss the CASTOR X/32 Design.

Participants:

NflQ N G_NR W. Hodges H. Spilker R. Chappell G. Jobson J.Shea H.Kuhl C. Mcdonald NOTE: Meetings between the NRC staff and potential licensees are open for interested members of the public to attend as observers pursuant to the "Open Meeting Statement of NRC Staff Policy," 59 Federal Reaister 48340, 09/20/94. Portions of this meeting may discuss proprietary material as noted in the agenda and may be closed to the public.

Contact:

Joe Shea (301) 415-1428 ,

Attendance at this meeting by other than those listed above should be made known via phone to the above contact.

cc: Participants (fax copy) ..

g Docket: 72-1028 -h O  :

1 l

Distribution: (TAC NO. L22895. Control NO. 0205)

Docket PUBLIC NRC File Center NMSS R/F l SFPO R/F SGagner, OPA PMNS (e-mail) EWBrach k PEng,SFPO SShankman LKokajko EEaston, SFPO l

FRLyon, NRR VTharpe (2 copies) ELeeds SFLS/SFTR Staff (e-mail)

MWHodges ANorris, PMDA

  • see previous,conpurren,ce ,

OFC SN/h C SFPO* O i NAME JShea RChappell I

DATE 05W/99 05/>/99 )

C=CO E = COVER & ENCLOSURE N = NO COPY i ECORD COPY G:\GNB\MAY99MTG.WPD fFIC l

't 9905270290 990524 PDR ADOCK 072*****

C PDR

v 7

l.
  • 1 . -

l *

l. l AGENDA l 9:00 Opening Remarks / Introductions All 9:10 Presentation on CASTOR X/32 Design - GNB Regarding

- Quality Assurance

- Heat Transfer Performancel  ;

- Structural / Materials 1

- Criticality I

- Shielding

-Impact Limiter

- Welding Standards

- Schedule 12:30 (Approx) Closing Remarks / Adjourn I

i I

!