Text
V
-[
%*g
- UNITED STATES 8
i NUCLEAR REGULATORY COMMisslON WAsHINSToN, D.C. SB00&80H
%q May 20, 1999 Mr. R. P. Necci Vice President-Nuclear Oversight and Regulatory Affairs Northeast Nuclear Energy Company P. O. Box 128 Waterford, CT 06385 l
SUBJECT:
COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 96-01,
" TESTING OF SAFETY-RELATED LOGIC CIRCUlTS," DATED JANUARY.10, 1996; MILLSTONE NUCLEAR POWER STATION, UNIT 2 (TAC NO. M94698) l
Dear Mr. Nocci:
On January 10,1996, the U. S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-01, " Testing of Safety-Related Logic Circuits," to all holders of operating licenses or construction permits. The NRC issued GL 96-01 for three principal reasons:
1.
To notify addressees about problems with testing of safety-related logic circuits; 2.
To request that all addressees implement the actions described within the generic letter, and 3.
To require that all addressees submit to the NRC a written response regarding implementation of the requested actions, in GL 96-01, the NRC staff specifically requested that licensees take the following actions:
1.
Compare electncal schematics and logic diagrams for the reactor protection system, emergency diesel generator load shedding and sequencing, and actuation logic for the engineered safety feature systems against plant surveillance test procedures to ensure that all portsons of the logic circuitry, including the parallel logic, interlocks, bypasses, and inhabit circuits, are adequately covered in the surveillance procedures to fulfill the t
technical specification requirements. This review should also include relay contacts, control switches, and other relevant electrical components within these systems, utilized in the logic circuits performing a safety function; and I
2.
Modify the surveillance procedures as necessary for complete testing to comply with the technical specifications. Additionally, the licensee may request an amendment to
' the technical specifications if relief from certain testing requirements can be justified.
Furthermore, the NRC staff required that addressees prepare and submit the following:
1.
A written response indicating whether or not the licensee would implement the actions requested above or propose an attemative action; 2.
A schedule for completing the requested actions or proposed attemative; and 9905270127 990520 PDR ADOCK 05000336 P
PDR C$)
o "p.
R. Necci May 20, 1999 3.
A response confirming completion of the requested actions, in response to GL 96-01, you provided letters dated April 16 and November 25,1996, September 30,1997, and April 16,1999, for Millstone Nuclear Power Station. These submittals provided both the information requested and the responses required by GL 96-01; therefore, TAC No. M94698 is closed.
Please contact me on (301) 415-3041 if you have any questions.
Sincerely, I
ORIGINAL SIGNED BY:
Ronald B. Eaton, Sr. Project Manager, Section 2 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-336 cc: See next page plSTRIBUTION:
m pgr PDl-2 R/F PUBLIC J. Zwolinski/S. Black J. Clifford T. Clark R. Eaton 4
H. Garg OGC ACRS J. Linville, RI DOCUMENT NAME: G4EATON\\GL96-01.WPD To receive a copypf his document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with ttachment(f,r51 sure "N" = No copy 0FFICE PM:PDK$
lE LA;PDI-2A )
l EElB:NRR lC SC:PS/2 l
l NAME REatonjrdi TClar 7 HGarg
//W JC1Hford DATE 05/l'I99 05/1 3 /99 05// "f /99 05/tD /99 Official Record Copy i
J
? _
[
R. Necci 3.
A response confirming completion of the requested actions.
In response to GL 96-01, you provided letters dated April 16 and November 25,1996, September 30,1997, and April 16,1999, for Millstone Nuclear Power Station. These submittals provided both the information requested and the responses required by GL 96-01; therefore, TAC No. M94698 is closed.
Please contact me on (301) 415-3041 if you have any questions.
Sincerely, f/
Ro aid B. Eaton, Sr. Project Manager, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-336 cc: See next pa9e 1
i k
.b
. i.
Millstone Nuclear Power Station Unit 2 y
cc:
Ms. L. M. Cuoco Emest C. Hadley, Esquire Senior Nuclear Counsel 1040 B Main Street Northeast Utilities Service Company P.O. Box 549 P. O. Box 270 West Wareham, MA 02576 Hartford, CT 06141-0270 Mr. Martin L. Bowling, Jr.
Edward L. Wilds, Jr., Ph.D.
Recovery Officer - Technical Services Director, Division of Radiation Northeast Nuclear Energy Company Department of Environmental Protection c/o Ms. Patricia A. Loftus 79 Elm Street Director-Regulatory Affairs Hartford, CT 06106-5127 P. O. Box 128 Waterford, CT 06385 Regional Administrator, Region i U.S. Nuclear Regulatory Commission Mr. J. T. Carlin 475 Allendale Road Vice President-Human Services King of Prussia, PA 19406 Northeast Utilities Service Company P. O. Box 128 First Selectmen Waterford, CT 06385 Town of Waterford 15 Rope Ferry Road Mr. Allan Johanson, Assistant Director Waterford, CT 06385 Office of Policy and Management Policy Development and Planning Mr. Wayne D. Lanning, Director Division Millstone inspections 450 Capitol Avenue - MS# 52ERN Office of the Regional Administrator P. O. Box 341441 475 Allendale Road Hartford, CT 06134-1441 King of Prussia, PA 19406-1415 Mr. M. H. Brothers Charles Brinkman, Manager Vice President - Millstone Operations Washington Nuclear Operations Northeast Nuclear Energy Company ABB Combustion Engineering P.O. Box 128 12300 Twinbrook Pkwy, Suite 330 Waterford, CT 06385 Rockville, MD 20852 Mr. J. A. Price Senior Resident inspector Director-Unit 2 Operations Millstone Nuclear Power Station Northeast Nuclear Energy Company clo U.S. Nuclear Regulatory Commission P.O. Box 128 P.O. Box 513 Waterford, C T 06385 Niantic, CT 06357 Mr. L. Olivier Mr. F. C. Rothea Senior Vice President and Chief l
Vice Preskient - Nuclear Work Services Nuclear Officer-Millstone l
Northeast Utilities Service Company Northeast Nuclear Energy Company P. O. Box 128 P.O. Box 128 Waterford, CT 06385 Waterford, CT 06385
L.
3
,I g -
Millstone Nuclear Power Station y
- Unit 2
. cc:
Citizens Regulatory Commission Ms. Nancy Burton ATTN: Ms. Susan Perry Luxton 147 Cross Highway 180 Great Neck Road Redding Ridge, CT 00870 Waterford, CT 06385 Deborah Katz, President Citizens Awareness Network P. O. Box 83 Shelbume Falls, MA 03170 Ms. Terry Concannon Co-Chair Nuclear Energy Advisory Council Room 4100 Legislative Office Building Capitol Avenue Hartford, CT 06106 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Little Harbor Consultants, Inc.
Millstone -ITPOP Project Office P. O. Box 0630
' Niantic, CT 06357-0630 Attomey Nicholas J. Scobbo, Jr.
Ferriter, Scobbo, Caruso, Rodophele, PC 1 Beacon Street,11th Floor Boston, MA 02108 Mr. D. B. Amerine Vice President - Engineering Services Northeast Nuclear Energy Company P. O. Box 128 Waterford, CT 06385.
Mr. D. 'A. Smith
. Manager-Regulatory Affairs Northeast Nuclear Energy Company P. O. Box 128 Waterford, CT 06385 k