ML20207A646

From kanterella
Jump to navigation Jump to search
Forwards Page 3 of USEC Ltr GDP 99-0039,dtd 990514.Page Inadvertently Omitted
ML20207A646
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 05/21/1999
From: Toelle S
UNITED STATES ENRICHMENT CORP. (USEC)
To: Paperiello C
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
GDP-99-0092, GDP-99-92, NUDOCS 9905270122
Download: ML20207A646 (2)


Text

n 1

- g USEC A GMal Energy Compan r May 21,1999 GDP 99-0092 Dr. Carl J. Paperiello Director, Office ofNuclear Material Safety and Safeguards Attention: Document Control Desk

' U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Portsmouth Gaseous Diffusion Plant May 21,1999(PORTS)

Docket No. 70-7002 Page 3 of USEC's Letter (GDP 99-0039), Dated May 14,1999 l

Dear Dr. Paperiello:

i USEC's transmittal ofletter GDP 99-0039, dated May 14,1999, inadvertently omitted Page

3. Page 3 ofGDP 99-0039 is enclosed.

We apologize for any inconvenience. Any questions related to this subject should be directed to Mark Smith at (301) 564-3244.

Siacerely, q

l s. A.

I4 Steven A. Toelle Nuclear Regulatory Assurance and Policy Manager

Enclosure:

As Stated cc: Robert C. Pierson (NRC)

. NRC Region III Office NRC Resident Inspector-PGDP NRC Resident Inspector-PORTS l

Randall M. DeVault (DOE)

(

(w(.,

k I

9905270122 990521 PDR ADOCK 07007002 N

k 6903 Rockledge Drive, Bethesda, MD 20817-1818 l

Telephone 301-564-3200 Fax 301-564-3201 http://www.usec.com Offices in Livermore, CA Paducah, KY Portsmouth, OH Washington, DC l

N r

e REFERENCES

~

1.

Letter from' Steven A. Toelle (USEC) to Robert C. Pierson (NRC), " Current Status of Compliance Plan Issues Closure Review," USEC Letter GDP 98-0214 dated October 9,1998

- 2.

Letter from E. William Brach (NRC) to Steven A. Toelle (USEC), "Portsmouth and Paducah Gaseous Diffusion Plants - Criteria for identifying Deficient Closure of and Reopening of Compliance Plan Issues (TAC No. L32104)," NRC Letter dated November 25,1998

3. - Letter from Elizabeth Q. Ten Eyck (NRC) to James H. Miller (USEC), "Portsmouth and Paducah Gaseous Diffusion Plants - Criteria for Identifying Deficient Closure of and Reopening

- of Compliance Plan issues (TAC No. L32104)," NRC Letter dated November 25,1998

4. _ Letter from Steven A. Toelle (USEC) to Robert C. Pierson (NRC), " Proposed Criteria for i

Reopening Compliance Plan Issues (Revised)," USEC Letter GDP 98-0264 dated December 9,1998

5. ' Letter from Steven A. Toelle (USEC) to Robert C. Pierson (NRC). " Reopening of Compliance Plan Issues," USEC Letter GDP 99-0002 dated Jamary 19,1999 6.

Letter from Steven A. Toelle (USEC) to Carl J. Paperiello (NRC), " Compliance Plan Status Report," USEC Letter GDP 99-0004 dated January 21,1999 7.

Letter from Randall M. DeVault to Steven A. Toelle, "Portsmouth Gaseous Diffusion Plant -

Docket No. 70-7002 - Department of Energy Approval of the Reopening of Compliance Plan Issues 8,9, and 23," dated April 14,1999

'8.' ' Letter from J. Morris Brown to Cynthia D. Pederson, " Submittal of Revision 5 of the PORTS Nuclear Criticality Safety (NCS) Corrective Action Plan (CAP) and NCS Program Quarterly Status Report," GDP 99-2020 dated April 30,1999.

9.

Letter from Randall M. DeVault to Steven A. Toelle, "Portsmouth Gaseous Diffusion Plant -

Docket No. 70-7002 - Department of Energy Approval of the Revised [ sic]ofCompliance Plan Issues 23R," dated May 10,1999.

10. Letter from Randall M. DeVault to Steven A. Toelle, "Portsmouth Gaseous Diffusion Plant -

Docket No. 70-7002 - Department of Energy Approval of A Change to Compliance Plan Issue 23R," dated May 12,1999

.