Ms. Barb:ra A. M zurowski, Director U.S. Department of Energy West Valley Area Office P.O.. Box 19,1 West Valley, NY 14171-0191
Dear Ms. Mazurowski:
We have reviewed your out-year plans, sent by letter dated November 4,1999, for U.S.
Nuclear Regulatory Commi.ssion (NRC) involvement in the West Valley Demonstration Project.
This document is useful for our future planning. Below are our general comments on the plan.
)
- 1. The staff-hour estimates for NRC activities appear to be about twice NRC's anticipated effort under our current budget.
- 2. Our current budget for fiscal year (FY)99, FY00, and FYO1 are 2.0 full-time equivalents (FTEs) per year for NRC Division of Waste Management (DWM) staff and 0.3 FTE per year for NRC Region I staff. Activities involving spent fuel cask certifications and spent fuel transportation would be performed by the NRC's Spent Fuel Project Office (SFPO). SFPO staff is currently developing a budget for anticipated U.S. Department of Energy activities. The out-year plan will be useful to them for this budgeting activity. Also, NRC assumes 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br /> of non-overhead work per FTE per year. We assume your staff-hour estimates include both administrative and overhead time in its basis.
- 3. Some of ycur entries list performance of tasks projected for FY98. It does not jaar that these tasks were ucmpleted in FY98 and will need to be included as FY99 items.
- 4. For clarity and future reference, it would be helpful to list activities by the responsible office (DWM, Region I, or SFPO) and to number each activity.
If you have any questions, please contact Jack Parrott of my staff, at 301-415-6700.
Sincerely,
[ Original signed by:)
John W. N. Hickey, Chief Low-Level Waste and Decommissioning Projects Branch 9903040093 99022S Division of Waste Management PDR ORO NOMA Office of Nuclear Material Safety
% I g ' jI PDR and Safeguards Project No. M-32 i
cc: P. Piciuto, NYSERDA i
TICKET: LLDP-9039 ~
LLDP r/f NMSS r/f RJohnson LBell l
DISTRIBUTION:. Central File
.PUBLIC -
TJackson, RI EHeumann,SFPO DOCUMENT NAME:S:\\DWM\\LLDPTJDP\\WVLET3.WPD
- SEE PREVIOUS CONCURRENCE OFC LLDP*
LLDP _
LLPM N
Jhckey NAME JParrott/cv/cm TCJoh n
DATE 2/23/99 2 /h/99 2/M/99 OFFICIAL RECORD COPY b
+ ! \\ t 2 y_
LSS:
YES NO B C G J m R C' 7 - P i PCBT ACNW:
YES NO' IM J u i*- ~ d " l'JU b IG:
YES NO Delete file after distribution YES. _
NO
February 25, 1999 r
Ms. Barb:ra A. Mazurow:ki, Director
- r..
I U.S. Department of Energy West Valley Atea Office P.O.. Box 191 West Valley, NY 14171-0191
Dear Ms. Mazurowski:
We have reviewed your out-year plans, sent by letter datc:f November 4,1999, for'U.S.
Nuclear Regulatory Commission (NRC) involvement in the West Valley Demonstration Project.
This document is useful for our future planning. Below are our general comments on the plar
- 1. The staff-hour estimates for NRC activities appear to be about twice NRC's anticipated effort under our current budget.
- 2. Our current budget for fiscal year (FY)99, FYOO, and FYO1 are 2.0 full-time equivalents (FTEs) per year for NRC Division of Waste Management (DWM) staff and 0.3 FTE per yearsfor i
NRC Region I staff. Activities invciving spent fuel cask certifications and spent fuel i
transportation would be performed by the NRC's Spent Fuel Project Office (SFPO). SFPO staff is currently developing a budget for anticipated U.S. Department of Energy activities. The out-year plan will be useful to them for this budgeting activity. Also, NRC assumes 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br /> of non-overhead work per FTE per year. We assume your staff-hour estimates include both administrative and overhead time in its basis.
4
- 3. Some of your entries list performance of tasks projected for FY98. It does not appear that these tasks were completed in FY98 and will need to be included as FY99 items.
- 4. For clarity and future reference, it would be helpful to list activities by the responsible office (DWM, Region I, or SFPO) and to number each activity.
r If you have any questions, please contact Jack Parrott of my staff, at 301-415-6700.
1 Sincerely,
[ Original rigned by:]
I John W. N. Hickey, Chief Low Level Waste and Decommissioning Projects Branch 4
Division of Waste Management Office of Nuclear Material Safety and Safeguards Project No. M-32 cc: P. Piclulo, NYSERDA TICKET: LLDP-9039 DISTRIBUTION: Central File LLDP r/f NMSS r/f RJohnson LBell PUBLIC TJackson, RI EHeumann,SFPO DOCUMENT NAME:S:\\DWM\\LLDPVDP\\WVLET3.WPD
- SEE PREVIOUS CONCURRENCE OFC LLDP*
LLDP_
LLp)Pr N
Jh[ key NAME JParrott/cv/cm
_TCJoh n
DATE 2/23/99 2 /d/99 2/M/99 OCFICIAL RECORD ' COPY LSS:
YES NO ACNW:
YES NO IG:
YES NO Delete file after distribution YES NO
9 LLDP TICKET ITEM TRACKING yII@% 3
- eI
_[I. 12/31/98
['
h h
{ (f.
hI hh$$,
- - 1regoe
- f m.?wnwm '4 y
j s
LLDP-9039 e
a
.TccasTyt_
r-g 1/29/99 Y
'SWl?Y5%$
Zum-udmm OUT-YEAR PLAN OF NRC INVOLVEMENT AT ]!
THE WEST VALLEY DEMONSTRATION PLAN. !
L if l
I
(
gwemmen-; -
g ANggy:ppqEM @i? C ~~
T.4
[
j
- 'f -
l i
l huysse 'nCKETlY
/$#%
Department c' f Energy dct ) D E MN
[
Ohio Field Office o
o c.
West Valley Demonstration Project 4
. P.O. Box 191 West Valley, NY 14171 b
k i
64M 3
November 4, 1998 l
i l
Mr. Jack D. Parrott, Project Manager U.S. Nuclear Regulatory Commission i
MS T8F37 Washington, DC 20555
SUBJECT:
Out-Year Plan of U.S. Nuclear Regulatory Commission (NRC) Involvement at the j
West Valley Demonstration Project (WVDP) i
Dear Mr. Parrott:
i l
Based on conversations between you, T. Jackson, NRC Region I, and C. Eckert of my staff, we j
have enclosed a list of activities that forecasts areas where the WVDP will need support from the
[
NRC. These activities are consistent with the requirements identified in the WVDP Act and agreements made in the NRC/ DOE Memorandum of Understanding.
i The intent of this letter is to provide our best forward-looking estimate to the NRC to enable you j
to provide budget and full time equivalents (FTEs) and coordinate and implement technical reviews in support of the West Valley mission. The enclosed table provides estimates of j
necessary support over the next three years to ensure successful completion of the WVDP Act.
l The estimates include projected time frame, a rough estimate oflevel of support, and ancillary i
NRC support that may be necessary.
1 The enclosed table contains activities where we would expect support to come from both 'NRC 4
Headquarters and Regional staff. A draft of the table was previously provided to you and Mr. Jackson for review and comment.
I appreciate your working closely with the WVDP to refine and update this plan as necessary to ensure a stable and continuing level of NRC support of the activitics at the WVDP.
I i
1j i
i i
4,
i Mr, Jack D. Parrott ~hovember4,1998 If you should have any questions, please contact Christopher Eckert of my staff, at (716) 942-4783.
Sincerely,
[d Barbara A. Mazurowski, Director -
West Valley Demonstration Project
Enclosure:
Activities Table M. E. Rawlings, DOE-HQ, EM-32,1188/CLOV, w/ene.
cc:
G. Leah Dever, OH/OOM, OSE, Room 419, w/ene.
W. F. Hamel, OH/WVDP, WV-37, w/ene.
T. J. Jackson, Of f/WVDP, WV-37, w/ene.
E. A. Lowes, OH/WVDP, WV-37, w/ enc.
J. J. May, OH/WVDP, WV-37, w/ enc.
H. R. Moore, OH/WVDP, WV-37, w/ enc.
P. L. Picuilo, NYSERDA, WV-17, w/ene.
T. Jackson, NRC Region I, w/cnc.
J. R. Gerber, WVNS, AOC-16, w/ enc.
CJE:0124 - 60830 - 425.I CJE/bma 1
a
)
A t
I u
PROJECTED NRC INVOLVEMENT AT WVDP
- ~
Task Description NRC Action Type of Projected Time Estimated Man-hours "
NRC*
Frame Fiscal Support Year
~
Required
- s Environmental monitoring program (data Support Technical Annual Reviews -
200 hrs /yr(1 audit /yr,3 people,5'
,J pucessing) - labs, analytical procedures and Region
'99,'00,'O1 days / audit,24 hrs / report / audit) iN radioactive material handling 3 Quarterly Field Reviews Region Technical
'99,'00,'01 32.0 hrs /yr ( 1 person every 3 months for I week), oversight increases during spent fuel shipout in 2001 d Annual Assessments -
Region Technical Annual
'99,'01, 200 hrs /yr ( l assessment / report / quarter,
'01 4 people,3 days / assessment,24 i
hrs / report)
Radiological contamination in the environment (e.g.,
Follow Technical As required 48 hrs /yr (1 person,2 days / topic,3 North Plateau)
Region & HQ (99,00,01) topics /yr) g NRC approve revised CoC of TN-REG Cask for CoC Technical 4* quarter 1998 -
500 hrs 4
climination of poison and filler rods Revision 3"' quarter 1999 NRC approve revised CoC of TN-REG and TN-CoC Technical 2"d quarter 1999 -
500 hrs
,'g BRP Casks for use of top and bottom "end caps" for Revision 2"d quarter 2000 canning ofdamaged SNF NRC approve revised CoC of NuPac (TN) 125B CoC Technical /
2"dquarter 1999-1000 hrs f Cask for modifications which permit wet Revision Regulatory 2"d quarter 2000 landing /daying of NuPac 125B (Serial No. 3)
NRC recertify TN-BRP cask Cask Regulatory 3"' - 4* quarter 1000 hrs recertification 1999 1
NRC recertify TN-REG cask Cask Regulatory 3"' - 4* quarter 500 hrs recertification 2000 i
NRC review of WVNS-SAR-003, Safety Analysis HQ Review /
Technical
'99 1000 hrs revision to include oxalic acid work Issue SER s
n n
n,w..
+
Task Description NRC Action Type of Projected Time Estimated Man-hours **
NRC*
Frame Fiscal Support Year Required NRC review of WVNS-SAR-002, Safety Analysis HQ review /
Technical
'98 1000 hrs revision addressing HEC work Issue SER
- k. Interface with NRC on shipout of glass Support HQ Technical
'98,'99,'00 200 hrs /yr
^g Fuel Shipment Safety Analysis Report Review and Review Technical October 1999 1000 hrs 4
Safety Evaluation Report HQ Review conceptual approach for establishing site Technical Technical /
1" - 2"d quarter 2000 hrs D&D criteria and preparing commission report discussion Legal 1999 and support; attend meetings Review / endorse performance assessment approach Review Technical 1 " - 2"d quarter 900 hrs proposed 1999 strategy /
endorse Review & endorse technical & economic feasibility Review /
Technical
'99 120 hrs methodology to be used in determining the HLW endorse tanks to be incidental low level waste Review / comment on Preferred Alternative Review Technical 2"' quarter 1999 480 hrs proposed strategy /
endorse Support weekly conference calls and quarterly Support Techm :al/
'99,'00,'01 300 hrs /yr meetings discussions Legal
~
on tasks Reshw supplemental NEPA document, endorse Review /
Technical /
1" quarter 2000 1000 hrs D&D criteria
- comment, Legal provide guidance
[,
S
- i Task Description NRC Action Type of Projected Time '
Estimated Man-hours **
NRC*
Frame Fiscal s
Support Year 5
Required Review FEIS for approval / publish ROD for D&D Review /
Technical /
3'd - 4* quarter 2000 hrs eriteria approve Legal 2000 Review Characterization Plan /D&D Plan (s)
Review /
Technical 2001 2000 hrs endorse /
approve D&D Safety Analysis Reports - Decommissioning HQ Review Technical 2001 1000 hrs based on EIS SAR-i 1
Decommissioning plans - Preliminary & Proposed Region & HQ Technical 2001 1000 hrs based on EIS l
Review 1000 hrs based on EIS Design and safety analysis related to proposed Region & HQ Technical 2000 1000 hrs l
Remote Handled Waste Facility Review
~
l
_t
'?
- NRC will decide whether they need contractor or consultant support t
- Esim=*ed man-hours taken from the 1996 table and revised. Some of the activities may require updating once new direction is established. Also, the estimated man-hours may be a combination of federal NRC staff and technical contractor support.
l 4
l 1
WVDP ESTIMATE OF iL NRC FTE SUPPORT +
i-1999 2000 2001 l
3.7 2.7+++ -
2.5 Regional l
Support 0.5 0.5 1.0++
?
-t
- + Number of FTE's is based upon one FTE equaling 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> FTE estimate does not include task marked as "TBD" or Post ROD
++ Increase due to planned spent fuel shipments. Also expect increase necessary during implementation of ROD & D&D criteria
{
l
+++ Increase due to review of design and safety analysis of remote handled waste facility NRC SUPPORT FTE ESTIMATE
- 1998 1999 2000 2001 HQ-2.0 HQ-2.0 IIQ - 2.0 llQ - 2.0 -
Region - 0.5 Region - 0.3 Region - 0.3 Region - 0.3
i t
I' r
4 a
9 A
t.
j P/96 Fy44 P/00' FYvl Q)
Rtw oa 200 Zoo 200 12tsl(s 3?o 32o Tzo O
T2Eist m
- too 2.o0 -
2.00 O
TZEG(A NB 96 49 fS)
SFPO S00 SFPO 150 tst l
(1)
SF90 Sto S00 SW)G
/o00 (g)
SFPd 600 stil DwM i000 DWM 1000 5FDD 200 200 200 13 SFP0
/000 l
t Trum 2000 Q9 TMA 900 i
fyw 12 0
]
pWm tIBO j
DWM 300 3@
300 DWM
/000 7.
Othi 2.000 1
DVUM 74:0 3
2.
T)WM i000.
DWW
./000 1
i 2
DWwt i000.
nu R@lls 7&BCM3
~76 E G b ~7(o b C p. h GfTD 3YSo4A /vso ru')
DWW1 000 ev) _ 3sto M sxo 24 e
,eWiW.surr-6
[Wj
++s p,
- + - + - >
..--se:.
a r=
r e--mm
-e w