Amend 251 to License DPR-59,revising TS Section 6 of App a to Relocate Safety Review Committee Reviews,Audits & Records from TS to Quality Assurance Program Section of FSAR
ML20206U476
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/08/1999
From: Bajwa S
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20206U482 List:
References
NUDOCS 9902160040
Download: ML20206U476 (6)


Text

.

CEh p

1 UNITED STATES NUCLEAR REGULATORY COMMISSION E

I

~

WASHINGTON, D.C. enana annt

\\...../

POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT l

AMENDMENT TO FACILITY OPERATING LICENSE l

Amendment No. 251 License No. DPR-59 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Power Authority of the State of New York (the licensee) dated June 16,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the spplication, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) l that such activities will be conducted in compliance with the Commission's

(

regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

This license is amended to approve the relocation of certain Technical Specification requirements to licensee-controlled documents, as described in the licensee's application dated June 16,1998, and reviewed in the staff's Safety Evaluation Report dated February 8,1999. This license is also hereby amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:

9902160040 990208

~

PDR ADOCK 05000333 i

P PDR

1 2-(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 251

, and the Environmental Protection Plan contained in Appendix B are incorporated into Facility License No. DPR-59. PASNY shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

2.

This license amendment is effective as of the date of its issuance, to be implemented l

within 30 days ofissuance. Implementation shallinclude relocation of Safety Review l

Committee Reviews, Audits and Records from the Technical Specifications to the Quality Assurance Program Section of the Final Safety Analysis Report.

l FOR THE NUCLEAR REGULATORY COMMISSION

=

3 S. Singh Bajwa, Direc or Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications i

Date of Issuance: Fetruary 8,1999

ATTACHMENT TO LICENSE AMENDMENT NO. m FACILITY OPERATING LICENSE NO. DPR-59 l

l DOCKET NO. 50-333 Revise Appendix A as follows:

Remove Paaes Insert Paaes 252 252 252a 252a 252b 252b l

l l

l l

I l

1 u

JAFNPP QUORUM 6.5.2.7 A quorum shall consist of at least a majority of the appointed individuals (or their alternates) and the Chairman (or the designated alternate). No more than two alternates may participate as SRC voting members at any one time. No more than a minority of the quorum shall have direct line responsibility for the operation of the plant.

REVIEW 6.5.2.8 The SRC shall review facility activities in accordance with the Quality Assurance Program, as described in Chapter 17 of the JAF FSAR.

1 I

AUDIT 6.5.2.9 Audits of facility activities shall be performed under the ognizance of the SRC l

and in accordance with the Quality Assurance Program, as described in Chapter 17 of the JAF FSAR.

i l

1 i

Amendment No. 50, 00, 05,100, 110, 220, 240, 251 252

AUTHORITY 6.5.2.10 The SRC shall advise the Chief Nuclear Officer on those areas of responsibility specified in Section 6.5.2.8 and 6.5.2.9.

t l

l i

l I

Amendment No. 50, 00, 05, 70, 00, 04, 220, 222, 220,251 252a

~

JAFNPP RECORDS 6.5.2.11 Records will be maintained in accordance with ANSI 18.7-1972. The following shall be prepared and distributed as indicated below:

a.

Minutes of each SRC meeting shall be prepared and forwarded to the Chief Nuclear Officer within 30 days after the date of ths meeting.

b.

Reports of reviews encompassed by Section 6.5.2.8 above shall be processed in accordance with the Quality Assurance Program, as described in Chapter 17 of the JAF FSAR.

c.

Audit reports encompassed by Section 6.5.2.9 above, shall be processed in accordance with the Quality Assurance Program, as described in Chapter 17 of the JAF FSAR.

Amendment No. 00, 202, 220, 220, 251 252b i

1