ML20206U232
| ML20206U232 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 04/01/1987 |
| From: | Conner T CONNER & WETTERHAHN, PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| CON-#287-3197 2.206, DD-86-14, NUDOCS 8704230342 | |
| Download: ML20206U232 (3) | |
Text
_ _ _ - - - _ _ - _ _ _ _ _ _ _ - _ _
st97
- l. AW OFFICEN CONNER & WETTERII A!!N, P.C.
%h)f I F 4 7 l'E N N M YINA *d l A AV E N U E. N. W.
)
WAMlllNOTON. D. C. uOOOO 37 WR 21 2058 mAna J. wettenMAMM mossa? M. manas f
N3te MlC MOLS Ann o. n=cunoarsa April 1, 1987 kChg t., s.u M'5 M*T.**"
sw.. +
C ABLE ADD EERS ATOML AW I
l Samuel J. Chilk, Secretary United States Nuclear Regulatory l
Commission l
Washington, D.C.
20555 l
In the Matter of Philadelphia Electric Company (Limerick Generating Station, Unit 1)
Docket No. 50-352 (2,Z06) (DD-G~l'0
Dear Mr. Chilk:
l As a follow-up on my earlier correspondence, I am l
enclosing a copy of DRBC Resolution No. 87-2 (March 25, 1987), relating to temporary approvals for 1987.
Sincerely, QroyB. Conner,Jr.p.
.R M.
T l
sdd Enclosure i
1 l
0704230342 870401 POR ADOCK 05000352 0
PDR 0) i
Nk,,
C NO. 87-2 A RESOLUTION to entend the following Commission Dockets relating to the 4
operation of the Limerick Electric Generating Station by the Philadelphia 1
Electric Company:
Docket No. D-69-210 CF (FINAL)(Revision No. 5)
Docket No. D-69-210 CF (FINAL)(Revision No. 6).
WHEREAS, use of the surf ace waters of the Delaware Basin for operation of the Limerick Generating Station (LCS) was approved pursuant to Section 3.8 of the Compact on November 5, 1975 and WHEREAS, the Commission's original approval permitted the use of water transferred from the Delaware River whenever restrictione prevented the use of the Schuylkill River for consueptive use; and WHEREAS, court proceedings have delayed the construction of facilities needed to transfer Delaware River water to Limerick and such f acilities will not be operational during 1987; and WHERIAS, the shutdown of Limerick Unit 1 is estimated to increase costs to customers by $420,000 per day in replacement fuel costs; and WHEREAS, Philadelphia Electric Compacy (PECO) submitted a request dated December 8,19% to extend, through December 31, 1987, temporary approvals to substitute dissolved oxygen limitations in place of the temperature restriction and to transf er existing authortred consumptive use at operating generating units, Cromby Unit 2 and Titus Units I, 2 and 3, to the Limerick Unit I f acility as previously described and approved in DR8C Docket No.
D-69-210 CP (FINAL)(Revision No. 5) and
s O
WHEREAS, PECO also, submitted a request dated December 8,1986 to extend, through December 31, 1987, te8Porary authorization for consuspetve use at Limerick regardless of the constraints in the original Docket No.
D-69-210 CP (FINAL).whenever the consumptive use has been replaced in equal volume by water released from Still Creek and/or Owl Creek Reservoirs as previously described in DRBC Docket No. D-61-210 CP (FINAL)(Revision No. 6);
and WHEREAS, the taplementation of these temporary revisions known as No. 5 and No. 6 during 1986 allowed the operation of Limerick Unit 1 at times when l
it would otherwise have been shutdown; and WHEREAS, the operation of Limerick Unit I in accordance with the temporary conditional approvals granted by Reviolon Nos. $ and 6 for 1986 did not result in any violation of DRBC standseds or policiest and WHERIAS, a public hearing on the request tot chose estm Stons was held on February 25, 1987; and l
WHEREAS, docket decisions D-69-210 CP (FINAL)(Peviolen No. 5) and D-69-210 CP (FINAL)(Revision No. 6) both provide fut possitie exten. tion by the Commission; now therefore BE IT RESOLVED by the Delaware River Basin Commissient Nos. D-69-210 CP (FINAL)(Revision No. 5) and D-69-210 CP Docket (FINAL)(Revision No. 6) are tereby extended until December 31, 1987. All other aspects of the decisions remain in full force 4nd effect.
/s/ R. Wayne Ashbee R. Wayne Ashbee, Chairman pro tem
/s/ Susan H. Weisman Susan M. Weisman, Secretary ADOPTED: March 25, 1987
-