Rev 1 to Special Rept 86-002:during 860310-0701,Control Bldg Room Cb 36-06 Renovated to Accommodate New Alarm Station. Renovation Will Include Erection of Five Rated Walls & Installation of HVAC & Halon 131 Sys
ML20206T085
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/11/1986
From: Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
86-002, 86-2, NUDOCS 8607070487
Download: ML20206T085 (2)


Text

- _

< 1 ?E$??

Colurrb

" * ~' **"'

29218 Nc"Nre"lEe%"

Nuclear Operations SCE&G

~ ~

June 11, 1986 w

y-Ei a

Dr. J. Nelson Grace --

Regional Administrator eo U. S. Nuclear Regulatory Commission C Region II, Suite 2900 101 Marietta Street, N.W.

Atlanta, Georgia 30323

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 86-002, Revision 1) <

Dear Dr. Grace:

Attached is Special Report 86-002, Revision 1 for the Virgil C. Summer Nuclear Station. This report is submitted pursuant to the requirements of Section 6 of the Technical Specifications.

4 Should there be any questions, please call us at your convenience.

V truly y urs, h

D. . a m'a RJB: DAN / led

! Attachment pc: 0. W. Dixon, Jr./T. C. Nichols, Jr. 'K.'E. Nodland E. H. Crews, Jr. R. A. Stough E. C. Roberts G. O. Percival J. G. Connelly, Jr. R. L. Prevatte W. A. Williams, Jr. J. B. Knotts, Jr.

Group Managers S. D. Hogge

0. S. Bradham I&E Washington D. R. Moore Document Management C. A. Price Branch W. T. Frady INP0 Records Center C. L. Ligon (NSRC) ANI Library R. M. Campbell NPCF File 8607070487 860611  !

PDR ADOCK 05000395 S PDR u

, g36 -

e . s Dr. J. Nelson Grace SPR 86-002, Revision 1 Page Two June 11, 1986

. ENCLOSURE 1 i

EVENT DESCRIPTION

During the period of March 10, 1986 to approximately July 1, 1986, Control Building Room CB 36-06 will be renovated to accommodate a new alarm station and associated computer equipment.

This extension to the original completion date is due to design changes and delays encountered in the installation of support systems.

Renovation includes:

A. Erection of new two hour fire-rated walls for Room CB 36-06 A, B, C.

Installation of new HVAC system and modification of existing B. i ductwork.

I C. Modification of the three inch fire header.

D. Modification of the sprinkler system.

E. Installation of a Halon 1301 system.

Because of the length and extent of renovation, fire barrier material /

penetrations will exceed the Technical Specification limit.