Ltr Contract:Mod 2 to Task Order 1 Under Contract NRC-04-97-040
ML20206Q479
Person / Time
Issue date: 05/10/1999
From: Mace M
NRC OFFICE OF ADMINISTRATION (ADM)
To: Mullinix T
AFFILIATION NOT ASSIGNED
References
CON-NRC-04-97-040, CON-NRC-4-97-40 NUDOCS 9905190138
Download: ML20206Q479 (4)


Text

'

'E .U _

04

'o kh

! g 4 UNITED STATES g

~ "a j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20665-0001 MAY I O 1893-Energy Research, Inc.

Attn: Ms. Tracey Mullinix

(

P.O. Box 2034 i Rockville, MD 20847

)

Dear Ms. Mullinix:

SUBJECT:

MODIFICATION NO. 2 TO TASK ORDER NO.1 l

UNDER CONTRACT NRC-04-97-040 The purpose of this modificatia.lis to include the enclosed modified Statement of Work, to incorporate by reference the contractor's technical proposal dated April 20,1999 and to hereby make them a part of the subject task order.

In addition, the period of performance for Task Order No.1 shall be through December 31, 1999. The revised total estimated ceiling for this modified task order is $21,753.14, a reduction of $2.96 from the original estimate ceiling.

All other terms and conditions of the subject task order remain unchanged.

A summary of obligations for this task order, taken from funds obligated under the basic j contract, is given below: '

Total FY98 Obligation Amount: $ 21,756.10 Total FY99 De-Cs' ligation Amount: $ (2.96) I l

Cumulative Total of NRC Obligations: $ 21,753.14 i

s l l This modification obligates FY99 funds in the amount of $-0 .

% l l

9905190138 990510

.sh 3

PDR CONTR NRC-04-97-040 PDR

! - e7 )i Contract No. NRC-04-97-040 Task Order No.1 l

. .. Modification No. 2 l i

i Please indicate your acceptance of this modification to the subject task order by having an i official, authorized to bind your organization, execute three copies of this document in the space j provided and return two copies to the U.S. Nuclear Rege.atory Commission, ATTN: Ms. Amy Siller, Division of Contracts and Property Management, Contract Management Branch 1, M/S T-  !

7-1-2, Washington, D.C. 20555. You should retain the third copy for your records.

i Should you have any questions concerning this modification, please contact Ms. Siller on (301)  !

415-6747. i Sincerely, I

I i

Mary i . Ma , Contracting fficer  !

Contract >nagement Branch 1 I Division of Contracts & Property Mgmt.  ;

Office of Administration

Enclosure:

I As stated 4

l lll ACCEPTED:

~

i N E Mohsen Khatib-Rahbar 0 Prnsidnnt TITLE .

l May 10, 1999 DATE l

l I

l l

i

7 )~ -

1

. 4 MODIFICATION TO TASK 1: Assessment of Integrated Fuel Coolant interaction (lFCl) Code

' ~

ftem 1: Background "- '

Remains iJnchanged.

Item 2: Objective -

Change to:

The objective of this task is to perform limited assessment of the IFCI code against a t suite of FCI experiments. The results of the effort are to be documented in an assessment report.

Item 3: Work Requirements Change subtask 1 to read as follows:

The contractor shall assess the IFCI code against the eight experiments shown in the assessment matrix (Attachment 1). Also, perform assessment against two other FCI experirnents that will be identified by the NRC project manager. ,

l Change subtask 2 to read as follows:

The contractor shall prepare an assessment report documenting the results of subtask

1. The assessment report will contain the actual IFCI input decks with an explanation of ,

each decks nodalization (preferably referencing a diagram), and how the relevant '

. parameters were chosen. The report should also draw conclusions with respect to code adequacy and describe how close was the code to predicting actual experimental measurements.

Delete subtask 3.

Item 4: Period of Performance -

Change to:

From March 23,1998, to December 31,1999.

Item 5: Technical Skills required Change

"...(1) familiarity and knowledge of the FCI codes, IFCI and PM-ALPHA /ESPROSE..."

to

" (1) familiarity and knowledge of the FCl code, IFCI..."

A f:

... 5, i i

! l Item 6: Estimated level of effort:

  • ~ ~

Rsmains Unchanged Item 7: Government Furnished Materials Changs to:

IFCI code and associated documentation, item 8: TRAVEL Remains unchanged.

Also change Attachment 1: delete the first two experiments, "MAGICO-2000" and " SIGMA".

1 i

.:.