ML20206Q114
| ML20206Q114 | |
| Person / Time | |
|---|---|
| Site: | 05000356 |
| Issue date: | 04/14/1987 |
| From: | Micklich B, Pohlod C, Williams J ILLINOIS, UNIV. OF, URBANA, IL |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20206Q121 | List: |
| References | |
| NUDOCS 8704210343 | |
| Download: ML20206Q114 (2) | |
Text
m EUniversit'y of Illinois tw^ re.e coiiese of Engine-ins g #.. :
Nuclear Engineerlag at Urbana-Champaign 214 Nuclear Engineering ~
217 333-2295 Laboratory 103 South Goodwin Avenue
. Urbana, IL 61801-2984 i
Director 4/14/87 Office of Nuclear-Reactor Regulation U.S. Nuclear Regulatory Commission Washington D.C. 20666
' A t t e n t'i on : Document Control Desk
Dear:
Si r s The enclosed information is submitted with'this letter for the purpose of requesting changes to the Technical Specifications for the University of Illinois LOPRA Reactor, ticense No. R-117, Docket No 50-356. These changes are requested due to a change of status of Nuclear Engineering from Program to Department and changes in staffing of the Nuclear Reactor Laboratory, These changes are to Section Six. Administrative Controls, and are briefly described as follows:
Section 6.1.c.
is changed to reflect that the Department of Nuclear Engineering provides support for the Reactor Health Physicist.
I Chart I is changed to reflect that Nuclear' Engineering has been up-graded to Department status and has added to the Staff a Director of the Reactor Laboratory.
t Section 6.2.c.
is changed to define the membership of the Reactor Commiitee.
Section 6.2.e.
is changed to reflect the change in 6.2.c.
Section 6.2.f is changed to allow for. difficulties smaetimes encountered during the summer months in scheduling meetings due to Reactor Committee members being gone from the University because of research activities.
Section 6.7, is changed to reflect USNRC administrative changes.which-i impact on our reporting requirements.
I 8704210343 870'494 PDit ADOCK 05000356.
/
0 P
,< q L
?
The copies of Section 6 of the Technical Specification enclosed reflect the above changes.
Yours truly, M1 Patek Crsig S.* Pohlod Reactor Supprvisor fk U J(hn G. Williams, Director Nuclear Reactor Laboratory
. & A & J l L U,1 Bradley J.' kicklich, Chairman 1
Reactor Committee
,!Y A8 J/ >
WW Barclay G.-Jo s.Actj{figHead Department o Nucleaf Engineering Signed before me this 1 day of 1g87
\\
. O h,.2n &
Notary Public a
I e
-