ML20206P319

From kanterella
Jump to navigation Jump to search
Informs That Util Will Require Addl Time to Submit Rev 4 to Fsar.Rev in Final Stages of Review & Concurrence & Will Be Submitted No Later than 870427
ML20206P319
Person / Time
Site: Sequoyah  
Issue date: 04/16/1987
From: Domer J
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8704210149
Download: ML20206P319 (2)


Text

r_

9 4

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 SN 105B Lookout Place April 16, 1987 10 CFR 50.71 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Centlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT - UPDATED FINAL SAFETY ANALYSIS REPORT (FSAR),

AMENDMENT 4 This is to document the fact that TVA will require some additional time for submittal of the Sequoyah Nuclear Plant FSAR Revision 4.

This submittal was due April 15, 1987, in accordance with submittals made in previous years.

This revision is in the final stages of review and concurrence and will be submitted no later than April 27, 1987.

This was discussed by telephone between M. R. Harding of TVA and J. R. Zwolinski of NRC on April 15, 1987.

Very truly yours, TENNESSEE VALLEY AUTHORITY f

J. A. Domer, Assistant Director Nuclear Safety and Licensing ec: see page 2 k, o@

B704210149 870416 PDR ADOCK 05000327 p

PDR An Equal Opportunity Employer

o o-U.S. Nuclear Regulatory Commission cc (Enclosures):

Mr. G. G. Zech,-Assistant Director Regional Inspection Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Soquoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy. Tennessee 37379 1