ML20206N891

From kanterella
Jump to navigation Jump to search
Revised Viewgraphs to 870410 Transcript on Commission Briefing Re Status of Facility
ML20206N891
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/14/1987
From:
NRC COMMISSION (OCM)
To:
References
REF-10CFR9.7 NUDOCS 8704210049
Download: ML20206N891 (6)


Text

1 Md$$N6$9(WG dWdddW9VthGhdWd'6ff%gy;VgypVgV&g(g(g(gygyggggggggigrgi Ms in f TRAt!SMITTAL TO: M Document Control Desk, 016 Phillips i ADVANCED COPY TO: The Public Document Room f

[ DATE: 4//4/99 I 1 i  : I SECY Correspondence & Records Branch

[ FROM:

i Attached are copies of a Commission meeting transcript and related meeting i document (s). They are being forwarded for entry on the Daily Accession List and j placement in the Public Document Room. No other distribution is requested or M

required.

;:2 l I

! Meeting

Title:

hieJi .o S bkwt oE 7ed ~ikde

1 i

j Meeting Date: S l i olt '7 Open X Closed ,

Item Description *: Copies E )

! Advanced DCS 5 's l to PDR Copy f  !

I l l

! 1. TRANSCRIPT 1 1 E j h i d l (l t o i 3%' Cads '

E /

E E

/

2.Ordu ;A wa 11%) [47 l 3.

- 4.

k R

s.

l 6.

  • PDR is advanced one copy of each document, two of each SECY paper.  ;

C&R Branch files the original transcript, with attachments, withcut SECY papers. ,

8704210049 870414 i PDR 10CFR

- PT9.7 PDR h h $l Ybl Yi fifbk ihkih

- J

BRIEFING ON STATUS OF PEACH BOTTOM COMMISSION MEETING 3

J APRIL 10, 1987

.g-t PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM CHAIRMAN OF THE BOARD AND CEO J. L. Everett I

PRESIDENT AND CHIEF OPERATING OFFICER (C00)

J. H. Austin, Jr.

SENIOR VICE PRESIDENT ENGINEERING & PRODUCTION J. S. Kemper 1

ELECTRIC PRODUCTION VP NUCLEAR OPERATIONS VP. ENGINEERING & RESEARCH VP A. J. Weigand J. W.-Gallagher S. J. Kowalski E

l 5 l QA DIVISION NUCLEAR GENERATION NUCLEAR SUPPORT SUPERINTENDENT DEPARTMENT DEPARTMENT R. H. Moore G. M. Leitch M. J. Cooney I

PEACH BOTTOM MANAGER I , ,

SUPERINTENDENT ADMINISTRATION SUPERINTENDENT OPERATIONS ENGINEER SERVICES i I

OPERATIONS )

ENGINEER I

Se1E1 SePeeim-1, l

l

f PEACH BOTTOM HISTORY SINCE 1986 SALP

  • JUNE 6, 1986 NRC ISSUES SALP REPORT AND NOTES PLANT MANAGO S T WEAKNESSES JUNE 18-JULY 3, 1986 REGION-I DIAGNOSTIC TEAM INSPECTION.

REPORT ISSUED SEPTEFBER 2, 1986 JULY 12, 1986 SALP MANAGEENT MEETING AUGUST 1, 1986 ED0/PECO SENIOR MANAGBENT E ETING AUGUST 12,1986 PEC0 RESPONSE TO SALP REPORT

  • OCTOBER 20,1986 PEC0 RESPONSE TO DIAGNOSTIC TEAM INSPECTION DECEFEER 19,1986 PEACH BOTTOM BWEEENT PROGRAM -

INITIAL EETING AT SITE FEBRUARY 20, 1987 ENHANCB E T PROGRAM STATUS E ETING  ;

AT SITE MARCH 31, 1987 ORDER SUSPENDING POWER OPERATIONS 1

l l

)

l l

l ll ll l

's E E C C I I F F F F O 0

' i l I g _

4 4 -

l K

s sJ f

A

^

S C

C E

r M o O r s O o i l R

t v fa t r L

er fe L O

c ie i p A R h h u C lC0 SS I T R N S

L O O T C

O C

a E_ I E N L M A E O P S T l

L T E O B

l N

A P H C

A E

P S

C C

t8D E _

' p*dg i

5@ N 4m

=

bia. i I

I 1 ,

t n

e d

n E e H C t _

C M I n _

N O F i U O F tr -

L R 0 i f [p _

huf A SS s

g

,: r

l

(

ENFORCEKNT HISTORY-PEACH BOTTOM ATOMIC POWER STATION

1. MARCH 1983 CIVIL PENALTY, ON RADIATION PROTECTION AND PLANT OPERATIONS INSPECTION FINDINGS DURING OCTOBER AND MAY TO SEPTEMBER 1982 ($140,000).
2. JUNE 1983 CIVIL PENALTY, 00NTAINENT INTEGRITY VIOLATION ($40,000).
3. JUNE 1984 CIVIL PENALTY (PLANT OPERATIONS ERRORS) UNPLA!WED PRESSURI-ZATION, EXCESSIVE HEATUP RATES, EXCESSIVE ROD SCRAM TIES.

(30,000).

4. JUNE 1984 ORDER REGARDING ABOVE ACTION,
5. JUNE 1985 CIVIL PENALTY, VIOLATIONS OF RADIATION PROTECTION PRACTICES DURING THE UNIT 2 PIPE REPLACEMEKf OIITAGE ($25,000).
6. JUNE 1986 civil PENALTY, OUT OF SEQUENCE CONTROL ROD WITHDRAWAL DURING A UNIT 3 STARTUP ($200,000).
7. FEBRUARY 1987 civil PENALTY, DISMISSAL OF EFPLOYEE EN3 AGED IN PROTECTED ACTIVITIES ($50,000)
8. MARCH 1%7 AN ORDER WAS ISSUED ON MARCH 31,1987 SUSP84 DING POWER OPERATIONS

~

l I

l