ML20206N891
| ML20206N891 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/14/1987 |
| From: | NRC COMMISSION (OCM) |
| To: | |
| References | |
| REF-10CFR9.7 NUDOCS 8704210049 | |
| Download: ML20206N891 (6) | |
Text
1 Md$$N6$9(WG dWdddW9VthGhdWd'6ff%gy;VgypVgV&g(g(g(gygyggggggggigrgi Ms in M
Document Control Desk, 016 Phillips f
TRAt!SMITTAL TO:
f ADVANCED COPY TO:
The Public Document Room i
[
DATE:
4//4/99 1
I i
[
FROM:
SECY Correspondence & Records Branch
!i Attached are copies of a Commission meeting transcript and related meeting i
document (s). They are being forwarded for entry on the Daily Accession List and j
placement in the Public Document Room. No other distribution is requested or M
required.
- 2 l
I Meeting
Title:
hieJi S bkwt oE 7ed ~ikde
.o 1
- i j
Meeting Date:
S l i olt '7 Open X
Closed E
)
Item Description *:
Copies Advanced DCS 5
's to PDR Copy f
I
- 1. TRANSCRIPT 1
1 E
j h
i d l (l t o i 3% Cads E
/
E E
2.Ordu ;A wa 11%) [47 l
/
3.
4.
k R
s.
6.
- PDR is advanced one copy of each document, two of each SECY paper.
C&R Branch files the original transcript, with attachments, withcut SECY papers.
8704210049 870414 PDR 10CFR PT9.7 PDR h
h $l Ybl Yi fifbk ihkih J
BRIEFING ON STATUS OF PEACH BOTTOM COMMISSION MEETING 3
J APRIL 10, 1987
.g-t PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM CHAIRMAN OF THE BOARD AND CEO J. L. Everett I
PRESIDENT AND CHIEF OPERATING OFFICER (C00)
J. H. Austin, Jr.
SENIOR VICE PRESIDENT ENGINEERING & PRODUCTION J. S. Kemper 1
ELECTRIC PRODUCTION VP NUCLEAR OPERATIONS VP.
ENGINEERING & RESEARCH VP A. J. Weigand J. W.-Gallagher S. J. Kowalski E
l 5
l QA DIVISION NUCLEAR GENERATION NUCLEAR SUPPORT SUPERINTENDENT DEPARTMENT DEPARTMENT R. H. Moore G. M. Leitch M. J. Cooney I
PEACH BOTTOM MANAGER I
SUPERINTENDENT ADMINISTRATION SUPERINTENDENT OPERATIONS ENGINEER SERVICES I
OPERATIONS
)
ENGINEER I
Se1E1 SePeeim-1,
f PEACH BOTTOM HISTORY SINCE 1986 SALP
- JUNE 6, 1986 NRC ISSUES SALP REPORT AND NOTES PLANT MANAGO S T WEAKNESSES JUNE 18-JULY 3, 1986 REGION-I DIAGNOSTIC TEAM INSPECTION.
REPORT ISSUED SEPTEFBER 2, 1986 JULY 12, 1986 SALP MANAGEENT MEETING AUGUST 1, 1986 ED0/PECO SENIOR MANAGBENT E ETING AUGUST 12,1986 PEC0 RESPONSE TO SALP REPORT
- OCTOBER 20,1986 PEC0 RESPONSE TO DIAGNOSTIC TEAM INSPECTION DECEFEER 19,1986 PEACH BOTTOM BWEEENT PROGRAM -
INITIAL EETING AT SITE FEBRUARY 20, 1987 ENHANCB E T PROGRAM STATUS E ETING AT SITE MARCH 31, 1987 ORDER SUSPENDING POWER OPERATIONS 1
l l
)
l l
ll ll
's E
E C
C I
I F
F F
F O
0 i
g l
I 4
4 l
s K
sJ f
A
^
S C
CE r
o M
O r
s o
i l
O t
v R
fa t r er fe L
L ie i p A
O h
h u C
R c
T lC0 SS I
R N
S O
O T
O L
C C
E_
E a
I N
L M
A E
O S
T P
l L
T l
E O
N B
A P
H CA E
P S
C t8D C
E
' p*d g
5@
N i
4m
=
bia.
I i
I 1
tne dn E
e H
C t
C M I
n N O F
i tr U O F
i [p f
L R 0
huf A
SS s
g T
1 r
l
(
ENFORCEKNT HISTORY-PEACH BOTTOM ATOMIC POWER STATION 1.
MARCH 1983 CIVIL PENALTY, ON RADIATION PROTECTION AND PLANT OPERATIONS INSPECTION FINDINGS DURING OCTOBER AND MAY TO SEPTEMBER 1982 ($140,000).
2.
JUNE 1983 CIVIL PENALTY, 00NTAINENT INTEGRITY VIOLATION ($40,000).
- 3. JUNE 1984 CIVIL PENALTY (PLANT OPERATIONS ERRORS) UNPLA!WED PRESSURI-ZATION, EXCESSIVE HEATUP RATES, EXCESSIVE ROD SCRAM TIES.
(30,000).
4.
JUNE 1984 ORDER REGARDING ABOVE ACTION, 5.
JUNE 1985 CIVIL PENALTY, VIOLATIONS OF RADIATION PROTECTION PRACTICES DURING THE UNIT 2 PIPE REPLACEMEKf OIITAGE ($25,000).
6.
JUNE 1986 civil PENALTY, OUT OF SEQUENCE CONTROL ROD WITHDRAWAL DURING A UNIT 3 STARTUP ($200,000).
7.
FEBRUARY 1987 civil PENALTY, DISMISSAL OF EFPLOYEE EN3 AGED IN PROTECTED ACTIVITIES ($50,000) 8.
MARCH 1%7 AN ORDER WAS ISSUED ON MARCH 31,1987 SUSP84 DING POWER OPERATIONS
~
l I
l