Text

1 Md$$N6$9(WG dWdddW9VthGhdWd'6ff%gy;VgypVgV&g(g(g(gygyggggggggigrgi Ms in M

Document Control Desk, 016 Phillips f

TRAt!SMITTAL TO:

f ADVANCED COPY TO:

The Public Document Room i

[

DATE:

4//4/99 1

I i

[

FROM:

SECY Correspondence & Records Branch

!i Attached are copies of a Commission meeting transcript and related meeting i

document (s). They are being forwarded for entry on the Daily Accession List and j

placement in the Public Document Room. No other distribution is requested or M

required.

2 l

I Meeting

Title:

hieJi S bkwt oE 7ed ~ikde

.o 1

i j

Meeting Date:

S l i olt '7 Open X

Closed E

)

Item Description *:

Copies Advanced DCS 5

's to PDR Copy f

I

1. TRANSCRIPT 1

1 E

j h

i d l (l t o i 3% Cads E

/

E E

2.Ordu ;A wa 11%) [47 l

/

3.

4.

k R

s.

6.

  • PDR is advanced one copy of each document, two of each SECY paper.

C&R Branch files the original transcript, with attachments, withcut SECY papers.

8704210049 870414 PDR 10CFR PT9.7 PDR h

h $l Ybl Yi fifbk ihkih J

BRIEFING ON STATUS OF PEACH BOTTOM COMMISSION MEETING 3

J APRIL 10, 1987

.g-t PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM CHAIRMAN OF THE BOARD AND CEO J. L. Everett I

PRESIDENT AND CHIEF OPERATING OFFICER (C00)

J. H. Austin, Jr.

SENIOR VICE PRESIDENT ENGINEERING & PRODUCTION J. S. Kemper 1

ELECTRIC PRODUCTION VP NUCLEAR OPERATIONS VP.

ENGINEERING & RESEARCH VP A. J. Weigand J. W.-Gallagher S. J. Kowalski E

l 5

l QA DIVISION NUCLEAR GENERATION NUCLEAR SUPPORT SUPERINTENDENT DEPARTMENT DEPARTMENT R. H. Moore G. M. Leitch M. J. Cooney I

PEACH BOTTOM MANAGER I

SUPERINTENDENT ADMINISTRATION SUPERINTENDENT OPERATIONS ENGINEER SERVICES I

OPERATIONS

)

ENGINEER I

Se1E1 SePeeim-1,

f PEACH BOTTOM HISTORY SINCE 1986 SALP

  • JUNE 6, 1986 NRC ISSUES SALP REPORT AND NOTES PLANT MANAGO S T WEAKNESSES JUNE 18-JULY 3, 1986 REGION-I DIAGNOSTIC TEAM INSPECTION.

REPORT ISSUED SEPTEFBER 2, 1986 JULY 12, 1986 SALP MANAGEENT MEETING AUGUST 1, 1986 ED0/PECO SENIOR MANAGBENT E ETING AUGUST 12,1986 PEC0 RESPONSE TO SALP REPORT

  • OCTOBER 20,1986 PEC0 RESPONSE TO DIAGNOSTIC TEAM INSPECTION DECEFEER 19,1986 PEACH BOTTOM BWEEENT PROGRAM -

INITIAL EETING AT SITE FEBRUARY 20, 1987 ENHANCB E T PROGRAM STATUS E ETING AT SITE MARCH 31, 1987 ORDER SUSPENDING POWER OPERATIONS 1

l l

)

l l

ll ll

's E

E C

C I

I F

F F

F O

0 i

g l

I 4

4 l

s K

sJ f

A

^

S C

CE r

o M

O r

s o

i l

O t

v R

fa t r er fe L

L ie i p A

O h

h u C

R c

T lC0 SS I

R N

S O

O T

O L

C C

E_

E a

I N

L M

A E

O S

T P

l L

T l

E O

N B

A P

H CA E

P S

C t8D C

E

' p*d g

5@

N i

4m

=

bia.

I i

I 1

tne dn E

e H

C t

C M I

n N O F

i tr U O F

i [p f

L R 0

huf A

SS s

g T

1 r

l

(

ENFORCEKNT HISTORY-PEACH BOTTOM ATOMIC POWER STATION 1.

MARCH 1983 CIVIL PENALTY, ON RADIATION PROTECTION AND PLANT OPERATIONS INSPECTION FINDINGS DURING OCTOBER AND MAY TO SEPTEMBER 1982 ($140,000).

2.

JUNE 1983 CIVIL PENALTY, 00NTAINENT INTEGRITY VIOLATION ($40,000).

3. JUNE 1984 CIVIL PENALTY (PLANT OPERATIONS ERRORS) UNPLA!WED PRESSURI-ZATION, EXCESSIVE HEATUP RATES, EXCESSIVE ROD SCRAM TIES.

(30,000).

4.

JUNE 1984 ORDER REGARDING ABOVE ACTION, 5.

JUNE 1985 CIVIL PENALTY, VIOLATIONS OF RADIATION PROTECTION PRACTICES DURING THE UNIT 2 PIPE REPLACEMEKf OIITAGE ($25,000).

6.

JUNE 1986 civil PENALTY, OUT OF SEQUENCE CONTROL ROD WITHDRAWAL DURING A UNIT 3 STARTUP ($200,000).

7.

FEBRUARY 1987 civil PENALTY, DISMISSAL OF EFPLOYEE EN3 AGED IN PROTECTED ACTIVITIES ($50,000) 8.

MARCH 1%7 AN ORDER WAS ISSUED ON MARCH 31,1987 SUSP84 DING POWER OPERATIONS

~