ML20206M935
| ML20206M935 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/31/1987 |
| From: | Jones V, Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 87-220, NUDOCS 8704200278 | |
| Download: ML20206M935 (21) | |
Text
PAGE 1 OPERAftNC DATA REPORT DocxtT po. 50 - 790 DATE Aetil 6.1057 CXMPLETED BY V. H. Tener TtttPHONE 357-3184 OPERATINC STATUS Surry Unit 1 Note.
1.
Unit Name:
2.
Reporting Period: 03-01-87 to 03-31-87 3.
Licensed Thermal Power (Wt):
2441 4
Nameplate Rating (Cross MWe):
847.5 S.
Design Electrical Rating (Not MWe):
788 6.
Maatsus Dependable capacity (Cross MWe):
820 7.
Maalaus Dependable Capacity (Not MWe):
781
- s. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any This Month Yr.=to Date Cuculative a.
- 11. Mours In Reporting Period 7 d d. fi 2160.0 125112.0
- 12. Number of Hours Reactor Was Critical 7dd 1 973.0 79118.3 0
0 3774.5
- 13. Peactor Reserve shutdown Noura
- 14. Hours Cenerator On Line 744.0 867.6 777.11.9
- 15. Unit Reserve shutdown Hours 0
0 37'i6.2
- 16. Cross Thermal Energy Cenerated (MW) 1814731.0
,,,2008842.5 180081701.0
- 17. Cross tiectrical Enersy Generated (MWH) 614985.0 680605.0 58178523.0 1s. Met Electrical Enersy Centrated (MWH) 585502.0 646608.0 55168579.0 100.0 %
40.2%
62.1%
- 19. Unit service rector 100.0 %
40.2%
65.1%
- 20. Unit Ava11 stile rector
- 21. Unit Capacity Factor (Using MDC Net) 100.8%
- 38. 3%_
57.0 %
- 22. Unit Capacity factor (Using DER Net) 99.9 %
38.0 %
57.4 %
0 0
17.6%
- 23. Unit Forced Rate 24 Shutdowns Scheduled Over Neat 4 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End of Report Period Estimated Date of Startup
- 26. Units In Test Status (Prior to Coopersist Operatton):
Forecast Achieved INITIAL CRITICALITY
~
i 0704200270 070331 INITIAL tuCTatCITY 00 00PMERCIAL OPERAT10N q
PAGE 2 l
l l
i oft 1ATING DATA REPORT
[
DoextT No.
50-281 l
DATE A - O 6_1097 r
COMPLETED BY V. u T-ne TELEPHONE B N-3 57-119 4 i
OPERATINC STATUS 1.
Unit Names Surry Unit 2 Notes 2.
Reporting Period 03-01-87 to 03-31-87 3.
Licensed Thermal Power (MWt):
2441 4
Nameplate Ratins (Cross MWe):
847.5 5.
Destan Electrical Rating (Not MWe):
788 6.
Manimus Dependable Capacity (Cross We):
820 i
7.
Maalaus Dependable Capacity (Net MWe):
781 8.
If Changes occur in capacity Ratings (!tena Number 3 nrough 7) Since Last Report, Cive Reasons l
9.
Power Level To Which Restricted, If Any (Net MWe):
1
- 10. Reasons For Restrictions, If Any:
I i
1 I
This Month Yr..tn Dare Cumulative
- 11. Hours In poportins Period 744.0 2160.0 12!992.0 f
I
- 12. Number of Mours Reactor Was critical 300.5 300.5 78411.3 0
0 328.1 l
- 13. Reactor Reserve Shutdown Houre 276.5 276.5 77116.9 l
14 Hours Cenerator On*Line 0
0 0
- 15. Unit Reserve Shutdown Hours 556888.8 556888.8 180349362.0 t
- 16. Cross normat Enersy Generates (MWM) 181525.0 181525.0 585C9349.0
- 17. Cross Electrical toersy cen rated (MWH) 171390.0 171390.0 55456914.0 j
is. Net tiectrical energy Generated (MWH) 37.2 %
12.8 %
63.2 %
t
- 19. Unit Service Factor 1
37.2 %
12.8 %
63.2 %
j*
- 20. Unit Available Tector 29.5 %
10.2%
58.4 %
f
- 21. Unit Capacity Factor (Using MDC Net) 29.2 %
10.1 %
57.7 %
- 22. Unit Capacity Factor (Using DER Net) 62.8%
87.2%
13.5 %
- 23. Unit Forced Rate 24 Shutdowns Scheduled Over Heat 6 Honths (Type Date, and Duration of tech):
j I
I i
j
- 25. If 8 hut Down At End of Report Period retizated Date of Startupt j
f
- 26. Units In Test Status (Prior to C<eenercial Operation):
Forecast Athleted 1
1 i
IN!TIAL CRITICALiff INIT!AL ELECTRICITT f
CoenctAL ortRAT!0n j
i (9/7f)
PAGE 3 scottr uo, 50-280 a
tatt surraensus ase teamst assecricas i
untT maset Surry Unit I mare April 7.1987 cowtzrts sY V. H. Iones atroer restru MARCH 1987 TELEruone 804-357-3184
- . " =
- 7 "e
LIrs=*N e,
e
- j jj caust & -Itt acrton to 30.
sart i
jj j
j j,*
Everr RErcKr e
.u o
yggygyr mornamenst f 1 J
jge o
NONEl )URING TIIIS P ERIOD b
I
~
4 3
Edibit C - Instructices 1
2 Itethed:
F: Forced seeses:
for preparettee of Bote 1 - Noemel 5: Scheested A - Egetpoemt Fetture (Enytein)
Entry Sheets for Licensee 2 - Mnemet Scree.
B - stolatemence er Test 3 - aatomette Scras.
Event Report (LER) File C - Befurtfog 4 - Other (Emplete)
(IIWSC 0161) 3 - Seestatory Seetriction E - Gyerator Tretatog & License Enesteetten Ed ibit 1 - Seen Seerce T - Adateistrativ.
C - Operettemet Error (Emplete)
(9/78 m - Other (Emplete) i I
.m
PAGE 4 ts1T sacreces Ase renet stacTians nnerre uo, 50-281 m1T sue:
Surry Unit II paTE April 7,1987 COMPLETED BY V. H. Jones REroar nearru AfARCH 1987 TE12rnout 804-357-3184 1:
LICDISEE e
c
- c t 7 c
5,j jj causE 6 cnnercrivE AcT1cu TO
(
up.
Dart i
j j
{
jgj Everr gi
- g,,*
sErear,
yu gu rarvEur meness=r 3
u i
1 86-07 12-09-EE r
467.5 A
3 e6-020 Unit 2 was shutdown <or piping replaeament.
l I
l l
l l
l l
l Ezhibit C - feetructione parthods F: Forced Beesons 5: Scheduled A - Equignent Fe11ere (Emplete) 1 - Moamet for properettes et Date B Metatemence or Test 2 - Menuel Scree.
Entry sheets for Licensee 3 - Automatic serem.
Event Report (12R) File C - Befuelles 3 - Beestatory meetriction 4 - Other (Emplete)
(uUREG 0161)
~
E - Operator Treintas & License Eneminetton 5
Eshtbit 1 - Sese Source F - Administrettwe C - Cyerettomet Error (Empleta)
(9/77)
R - Other (Emplais)
PAGE 5 AVERACE DAILY LHIT POVER LEVEL 00cxET NO.
K0-9A0 UNIT Kiirrv I DATE Anril 6' IQR7 COMPLETED BY V M Tnnan TELEPHONE MONrH March 1987 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Ne t)
(MWe-Net) 1 795 17 788 2
793 18 789 1
786 19 782 4
785 20 7sg 5
786 21 790 6
786 22 790 7
779 21 790 8
785 24 790 9
776 25 789 10 787 26 7sg 11 785 27 787 12 785 28 786 11 784 29 789 14 784 10 789 15 788 11 791 789 16 INSTRUCTIONS On this format, list the average daily unit power level in We-Net for each day in the reporting month. Compute to the nearest whole negawatt.
(9/77) k
^
PAGE 6 l
e t.
AVERACE DAILY LWII POWER LEVEL DOCKET No.
50-281 f
UNIT Surry 2 i
DATE Aoril 6.1987 i
COMPLErED BY V. H. Tenos
- I TELEPHONE 804-357-3184 I
MogrH March 1987 j
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL j
(MWe-Net)
(MWe-Net) 1 0
17 0
V j
2 0
18 0
3 0
19 0
4 0
20 98 j.
l 5
0 21 214 j
j 6
0 22 295 l
7 0
23 452 4
1 8
0 24 707 l
9 0
25 769 i
10 0
26 772 1
l 11 0
27 771 12 0
28 764 l
13 0
29 765 i.
14 0
10 764 l
15 0
11 769 0
16 INSTRUCTIONS i
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l (9/77)
}
4 I
]
1 4
l l
PAGE 7 J
SUMMARY
OF OPERATING EXPERIENCE MONTH / YEAR MARCH 1987 1
Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT ONE i
03-01-87 0000 This reporting perkod begins with the Unit at 100?6,835 MW's.
03-09-87 1154 Started rarnp due t'o ES-RV-101 A lifting.
1218 Holding power at 93%,760 MW's.
1641 Commenced power increase.
i 1751 Unit at 100?6,830 MW's.
03-31-87 2400 This reporting period ends with the Unit at 100?6 power,830 MW's.
1 l
i i
6 e
I
's s
_ _.. ~.. _, _ _ _ _ _. _. _, _ _ _ _ _ _ - -
PAGE 8 i
SUMMARY
OF OPERATING EXPERIENCE MONTH / YEAR MARCH 1987 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT TWO 03-01-87 0000 This reporting period begins with the unit at CSD on RHR; 03-02-87 0312 RCS filled and vented, bubble in pressurizer; 03-16-87 1544 RCS > 200 oF.
03-17-87 0600 RCS > 350 oF,450 psig.
03-19-87 1131 Rx critical.
03-20-87 1135 Generator on line.
1230 Holding power at 180 MW's,30% power.
j 1434 Slowly increasing power to FRV's in automatic; 1450 Holding power at 240 MW's,35 % power for chemistry; 03-22-87 1243 Commenced power increase at 75 MW's/hr.
1430 Holding power at 50%,385 MW's.
1445 Commenced power increase at 4%/hr.
1736 Holding power at 60%,485 MW's, for Main Feed pump repairs.
03-23-87 1925 Commenced power increase at 4 %/hr.
2026 Holding power at 72 %,555 MW's for CP a P.
2215 Commenced power increase at 4%/hr.
03-24-87 0724 Holding power at 94%,740 MW's for chemistry.
1305 Commenced slow power increase.
2020 Unit at 100% power,805 MW's.
03-31-87 2400 This reporting period ends with the unit at 100% power,810 MW's.
PAGE 9 j
i l
FACILITY CHANGES REQUIRING NRC APPROVAL MONTH / YEAR MARCH 1987 NONE DURING THIS PERIOD
)
e O
f 1
~
s l
m sm
-ye
- P A G E ~2 0 e
~
FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH / YEAR MARCH 1987 NONE DURING THIS PERIOD 4
k
f PAGE 11 e
TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL MONTH / YEAR MARCH 1987 NONE DURING THIS PERIOD m
- k e
~
\\
PAGE 12 e
e G
,o TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH / YEAR MARCH 1987 NONE DURING THIS PERIOD 1
en f
l i
6
PAGE 7.3 4
I OTHER CHANGES, TEST AND EXPERIMENTS ARCH M7 MONTH / YEAR I
NONE DURING THIS PERIOD i
s a
4 d
h 2
e o
h i
n l
)
5 l
.3 e
i 1
i 1
a 6
.1 4
l I
i s
c
..,._.,....,...,,r.m m.
.,,...._,._,,.,._.._,,._.,.-._,.,-,,_,.m,_._.-
PAGE 14 VIRGINIA PO*,.ER SURRY PO',.T.R SIATION CHEv.ISTRY REPORT March 19 87 00N UNIT No. 1 UNIT NO. 2 ANALYSIS MAX.
MIN.
AVG.
MAX.
MIN.
AVG.
E-2 E
E-1 E-1 E-1 1.21 +0 5.04 7,44 2.40 1.59 4.80 Gross Radioact., uCi/ml 0.0 0.0 0.0 0.0 0.6 0.23 Suspended Solids, ppm E-1 E-2 E-2 E-2.
E-2 E-2 1.00 5.40 7.70 3.98 3.61 3.80 Gross Tritium, uC1/cl E-2 E-3 E-3 E-4 E-5 E-5 1.07 2.98
, 4.54 1.33 1.58 7.61 IodineI3I, uCi/ml I31 131 0.26 0.08 0.12 0.12 0.06 0.09 I
/1 38.P 26.0 32 3 34.0 5.6 (1) 17.8(1)
Hydrogen, cc/kg 1.57 1.22 1.39 2.82 0.43 1.85 Lithium, ppm 163.9 145.8 154.6 409.6 209.3 308.5 Boron-10, ppm
- f0.005 10'.005 40.005 1.3(2) 0.005 0.123f2) 0xygen, (DO), ppm 0.014 0.006 0.008 0.019 0.007 0.012 Chloride, ppm 6.58 6.03 6.51 6.49 4.30 5.87 l
pH @ 25 degree Celsius
- Boron-10 = Total Boron I 0.196 q_77_p7 @ 1115 RDiARKS:
0-1 LiOH additions: 200c on 3-19-87 e 1970. 7nne en 70tal LiOH added = 400g. CAT bed was inservice on 3-2-87.
U-2 LiOH additions: 1625g on 3-7-87 @ 1945, 2527c on 3-18-87 @ 1715, 246c on Ubtal LiOH 3-19-87 @ 0340, 4500 on 3-19-87 @ 1720, 250c on 3-22-87 at 1715.
added=Sb98g. Hydrazine additions: 2 gallons on 3-1-87 @ 1745, 0.5 callons
)
on 3-1-87 @ 2200. ':btal Hydrazine added = 2.5 callons. CAT bed was in service on 3-21-87, 3-25-87, 3228-87, and 3-21-87.
(1) Im Hvdrocen due to establishnent of crimarv chem.iserv an+c n,it-et e n,.
Cbcygen was eliminated before j
(2)!Hich oxvoen due to unit being at shutdown.
RCS te=rerature exceeded 180*F.
PAGE 15 o.
UNIT I
FUEL HANDLING DATE March 1987 -'
NEW OR DATE NUMBER OF NEW OR SPENT SPENT FUEL SHIPPED OR ASSEMBLIES ASSEMBLY ANSI INITIAL FUEL SHIPPING SHIPMENT #
RECEIVED PER SHIPMENT ENRICHMENT CASK ACTIVITY LEVEL l
NONE DURING THIS PERIOD 3
I 6
W
-S I
i-1 l
4 t
I i
L
?- - -
PAG le 1
UNIT 2
FUEL HANDLING DATE March '987. '
4
\\
\\
NEW OR DATE NUMBER OF NEW OR SPENT SPEhT FUEL SHIPPED OR ASSEMBLIES ASSEMBLY ANSI INITIAL FUEL SHIPPING 1
SHIPMENT #
RECEIVED PER SHIPMEhT ENRICHMEhT CASK ACTIVITY LEVEL i
i NONE DUfNG THIS I'ERIOD i
i
.9 '
1 i
i i
i s
/
PAGE 17 4
PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR MONTH / YEAR MARCH 1987 PROCEDURE NO.
UNIT TITLE DATE TMOP-3006 2
Removal of 2-CH-P-1 A and 2-CH-P-1B 3/11/87 from service for maintenance of 2-SW-168 l
1 4
6 e-a i
e r-y_
g
.,y--
PAGE 18 DESCRIPTION OF PERIODIC TEST WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH / YEAR MARCH 1987 NONE DURING THIS PERIOD l
l l
l l
~
r VIRGINIA 13LECTRIC AND POWER COMPANY Ricuxoxn,VinoixrA 20061 April 15, 1987 y,g,3,,
VICE i' BEN 1DRMT Ncca. nan OrERATIONN U. S. Nuclear Regulatory Commission Serial No.87-220 Attn: Document Control Desk N0/JDH:vlh Washington, D. C.
20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 j
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 i
MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of March 1987.
Very truly yours, W. L. Stewart Enclosure cc:
U. S. Nuclear Regulatory Commission 101 Marietta Street, N. W.
Suite 2900 Atlanta, GA 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station 1
)
J P
'y y
I
POW 34-04 u
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT i
REPORT 87-03 i
APPROVED:
hd STATION MANAGER I
e O
I
I s
SECTION PAGE Operating Data Report - Unit No. I 1
Operating Data Report - Unit No. 2 2
Unit Shutdowns and Power Reductions - Unit No.1 3
Unit Shutdowns and Power Reductions - Unit No. 2 4
Average Daily Unit Power Level-Unit No.1 5
Average Daily Unit Power Level-Unit No. 2 6
Summary of Operating Experience - Unit No. I 7
Summary of Operating Experience - Unit No. 2 8
Facility Charges Requiring NRC Approval 9
Facility Changes That Did Not Require NRC Approval 10 1
Tests and Experiments Requiring NRC Approval 11 Tests and Experiments That Did Not Require NRC Approval 12 i
Other Changes, Test and Experiments 13 l
Chemistry Report 14 i
15 Fuel Handling - Unit No.1 i
Fuel Handling - Unit No. 2 16 Procedure Revisions That Changed the Operating Mode Described in the FSAR 17 i
Description of Periodic Test Which Were Not Completed Within j,
the Time Limits Specified in Technical Specifications 18 t
f 4
4 4
1-. -
~
... i
,. _