ML20206M127

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Pump & Valve Inservice Testing Program, First 10 Yr Interval
ML20206M127
Person / Time
Site: Limerick  
Issue date: 11/23/1988
From: Fogarty E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20206M131 List:
References
NUDOCS 8811300432
Download: ML20206M127 (2)


Text

,

10 CFR 50.55c(g)(4)

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 4699 PHILADELPHIA PA 19101 (ats) est somo

.. 6.... w..$." T *

    • "*[?*

November 23, 1988

..r em i Docket N<s. 50-352 9

50-353 License flo. NPP-39 Permit Fo. CPPR-107 U.S. Musiear Regulatory Commission.

Attn Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station Units 1 and 2 First 10-Year Interval Pamp and Valve Inservice Testing (IST) Program Revision

REFERENCE:

(1) Letter J. S. Kemper (PEco), to A. Schwencer (NRC), dated June 15, 1984 (2) Letter, R. J. Clark (NRC), to E. G. Bauer, Jr.,

(PECo), dated November 6, 1987 Dear Sirst Enclosed for your review is the revised Pump and Valve Inservice Testing (IST) Program for Limerick Generating Station Unit i for the 10-year interval which commenced on February 1, 1986.

This revision also serves as the initial submittal of the IST Program for Limerick Unit 2 when it begins it first 10-year interval.

The initial submittal of the first 10-year interval IST n

Program was made by Reference 1.

NRC questions and comments h.,pg concerning a subsequent proposed revision to the Program were provided 4

in Reference 2.

These questions aad comments were discussed on February 24 and 25, 1988 at a meeting with representatives from the gO NRC staff, Idaho National Engineering Laboratory and Philadelphia Electric Company.

The enclosed revised IST Program incorporates the Q'd guidance provided at this February meeting, wf 8e In accordance with 10 CPR 50.55a(g)(4), the first 10-year M

interval IST Program complies with Section XI of the ASME Boiler and U

Pressure Vessel Code, 1986 Edition.

This Program will be updated and

@gge maintained in accordance with Nuclear Group Administrative Procedures to reflect the as-built condition of the plant.

The enclosed document is not a controlled copy.

Controlled copies will be available for NRC review at both corporate headquarters and the station.

Please note h in

i U. S. Nuclear Regulatory Cc'nmission Novembst 23, 1988 Page 2 d

that this document has been designated as PEco Specification ML-008, Rev. O.

The Pump and Valve Inservice Testing (IST) Program for LGS Unit I was formerly designated as NES Document No. 80A2972 Rev. 6 and Bechtel Vendor Print No. 8031-M-246A-257.

If you have any questions or require additional information, please do not hesitate to contact us.

i I

a l

Very truly yours, o

~

C

%A 4

i Enclosure l

i j

cca W. T. Russell, Administrator, Region I, USNRC j

T. J. Kenny, USNRC Senior Resident Inspector, LGS-1 R. A. Gramm, USNRC Senior Resident Inspector, LGS-2 i

J l

U

}

1 i-1 I

h t

I i

4 I

l i

1 I

I t

i l

i l

5 l

i i

_