ML20206L720

From kanterella
Jump to navigation Jump to search
Forwards Draft Ltr & Insp Rept 50-424/86-42 on 860505-07. Rept Documents S&W Depth of Review Associated W/Independent Design Review & Completes Initial Technical Review of Module 13C,per 851204 Request
ML20206L720
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/26/1986
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20206L726 List:
References
NUDOCS 8606300412
Download: ML20206L720 (3)


See also: IR 05000424/1986042

Text

,

!

.

~%,

UNITED STATES

[

g

NUCLEAR REGULATORY COMMISSION

l;

l

WASHINGTON, D. C. 20555

%, . . . . . p#

33126 1986

Docket No. 50-424

MEMORANDUM FOR:

Roger D. Walker, Director

Division of Reactor Safety

Region II

FROM:

Brian K. Grimes, Director

Division of Quality Assurance, Vendor,

and Technical Training Center Programs

Office of Inspection and Enforcement

SUBJECT:

IE DRAFT LETTER TO GEORGIA POWER COMPANY (GPC)

~

FORWARDING INSPECTION REPORT FOR MODULE 13C

READINESS REVIEW

.

.This memorandum forwards IE's draft letter and the inspection report

for module 13C to you for subsequent transmittal to GPC, since Region II

,

'

is the coordinating office for the Vogtle Readiness Review.

The inspection

report documents IE's inspection of the Stone and Webster Engineering

Corporation's (SWEC) depth of review associated with the Independent Design

Review (IDR) chapter. This inspection report completes IE's initial technical

review of Module'13C as requested in Roger D. Walker's memorandum dated

December 4,1985.

,

,

pT <t ,L

,AM

Brian K. Grimes, Director

Division of Quality Assurance, Vendor,

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosures:

As stated

8606300412 860626

PDR

ADOCK 05000424

G

PDR

L

.

I

Docket No. 50-424

Georgia Power Company

ATTN: Mr. R.J. Kelly

Executive Vice President

P.O. Box 4545

Atlanta, Georgia 30302

Dear Mr. Kelly:

On May 5, 1986 through May 7, 1986, the NRC performed an inspection

at the Vogtle job site of Readiness Review Module 13C - Chapter 7.C

" Independent Design Review." The objective of the inspection was to

ensure that Stone and Webster Engineering Corporation (SWEC), the

Independent Design Review (IDR) contractor, had performed a thorough

review of the Readiness Review module chapter, as well as to ensure

that appropriate corrective action had been implemented by GPC, where

necessary. The results of this inspection are documented in the enclosed

inspection report and have been discussed with your staff during our

, inspection exit briefing.

Based on this inspection, we believe that the 1DR for Module 13C was

-

performed competently and effectively.

Minor comments are presented

in the enclosed inspection report.

Your resolution of IDR Findings

-

1, 2 and 7 will be examined during the next inspection of the IDR

portion of your Readiness Review Program.

. . -

.

'

Sincerely,

J. Nelson Grace

Regional Administrator

a

Enclosure:

Inspection Report

7,

.

,

'I/

Mr. R. J. Kelly

-2-

Distribution:

DC5

NRC PDR

Local POR

QA8 Reading

DQAVT Reading

JMTaylor, IE

RHVollmer, IE

BKGrimes, IE

HJMiller, IE

GTAnkrum,

IE

EVImbro, IE

HBWang,

IE

RWParkhill, IE

WMHill, IE

-

HTThompson, NRR

TMNovak, NRR

MAMiller, NRR

._

RDWalker, RII

~

JRHarris, RII

MVSinkule, RII

<

JJLenahan, RII

GHarstead, HEA

.-.

.

I

$

!

,