ML20206K795
| ML20206K795 | |
| Person / Time | |
|---|---|
| Site: | Purdue University |
| Issue date: | 05/06/1999 |
| From: | Marsh L NRC (Affiliation Not Assigned) |
| To: | Bean R PURDUE UNIV., WEST LAFAYETTE, IN |
| Shared Package | |
| ML20206K798 | List: |
| References | |
| 50-182-99-201, NUDOCS 9905140004 | |
| Download: ML20206K795 (3) | |
See also: IR 05000182/1999201
Text
C
[
.
May 6, 1999
Mr. Robert B:an, Laboratory Director
1290 Nuclear Engineering Building
Department of Nuclear Engineering
Purdue University
West Lafayette,' IN 47907
SUBJECT:
NRC ROUTINE, ANNOUNCED INSPECTION REPORT NO. 50-182/99-201
Dear Mr. Bean:
This refers to the inspection conducted on April 12-15,1999 at the Purdue University
PUR-1 research reactor. The enclosed report presents the results of that inspection.
Areas examined during the inspection are identified in the report. Within these areas, the
inspection consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations of activities in progress.
Easad on the results of this inspection, no noncompliance of NRC requirements was
identified. No response to this letter is required. Material conditions have improved
'significantly since the last inspection.
In accordance with 10 CFR 2.790 of the NRC's ". Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Fublic Document Room.
Should you have any questions concerning this inspection, please contact Mr. Thomas
Burdick at (630) 829-9864.
Sincerely,
-
,
ORIGINAL SIGNED BY:
Ledyard B. Marsh, Chief
Events Assessment, Generic Communications and
Non-Power Reactors Branch
< Division of Regulatory Improvement Programs
Office of Nuclear Reactor Regulation
Docket No. 50-182
I
License No. R-87
Enclosure: NRC Inspection Report No. 50-182/99-201
cc w/enclocure: See next page
i
\\
DISTRIBUTION: w/ enclosure -
//0
liARD COPY
g\\
TDragoun
. CBassett
gDocket File 50-1823
DMatthews
PDoyle
TMichaels
PUBLIC
LMarsh
WEresian
- Pisaac
EHylton _
REXB r/f
' AAdams .
SHolmes
GTracy, OEDO (016-E15) TBurdick
9905140004 990506
MMendonca
.
ADOCK 05000182
G
REXB:RI ' ^ 0 0 41EXB:PM }fpp[
REXB:BC h'y
R
LMarch
TBurdick
MMendonca
ton
5/f /99 '
5/ f/99
5/ /99
5/h/99
OFFICIAL RECORD COPY
DOCUMENT NAME: G:\\SECY\\BURDICK\\lR-99201
P
.
[ja%q
'
t
UNITED STATES
s
j
NUCLEAR REGULATORY COMMISSION
WASHINGTON, D.C. 20566 4001
k.....,/
May 6, 1999
Mr. Robert Bean, Laboratory Director
1290 Nuclear Engineering Building
Department of Nuclear Engineering
Purdue University
West La'ayette, IN 47907
l
SUBJECT:
NRC ROUTINE, ANNOUNCED INSPECTION REPORT NO. 50-182/99-201
Dear Mr. Bean:
This refers to the inspection conducted on April 12-15,1999 at the Purdue University
PUR-1 research reactor. The enclosed report presents the results of that inspection.
Areas examined during the inspection are identified in the report. Within these areas, the
inspection consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations of activities in progress.
Based on the results of this inspection, no noncompliance of NRC requirements was
identified. No response to this letter is required. Material conditions have improved
significantly since the last inspection.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
Should you have any quections concerning this inspection, please contact Mr. Thomas
Burdick at (630) 829-9864.
Sincerely,
Ledyard B. Marsh, Chief
Events Assessment, Generic Communications and
Non-Power Reactors Branch
Division of Regulatory improvement Programs
Office of Nuclear Reactor Regulation
Docket No. 50-182
License No. R-87
Enclosure: NRC Inspection Report No. 50-182/99-201
cc w/ enclosure: See next page
-
- - -
7; .
.
t
-O
Purdue University
Docket No. 50-182
cc:
Mayor
City of West Lafayette
- 609 W. Novajo.
West Lafayette, IN 47906
State Board of Heilth
ATTN:. Director, Bureau of Engineering
1330 West Michigan Street
Indianapolis, IN 46206
Ed Merritt
Reactor Supervisor
l
Department of Nuclear Engineering
Purdue University
West Lafayette, IN 47907
.
I
1
i
i
J