ML20206K795

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-182/99-201 on 990412-15.No Violations Identified
ML20206K795
Person / Time
Site: Purdue University
Issue date: 05/06/1999
From: Marsh L
NRC (Affiliation Not Assigned)
To: Bean R
PURDUE UNIV., WEST LAFAYETTE, IN
Shared Package
ML20206K798 List:
References
50-182-99-201, NUDOCS 9905140004
Download: ML20206K795 (3)


See also: IR 05000182/1999201

Text

C

[

.

May 6, 1999

Mr. Robert B:an, Laboratory Director

1290 Nuclear Engineering Building

Department of Nuclear Engineering

Purdue University

West Lafayette,' IN 47907

SUBJECT:

NRC ROUTINE, ANNOUNCED INSPECTION REPORT NO. 50-182/99-201

Dear Mr. Bean:

This refers to the inspection conducted on April 12-15,1999 at the Purdue University

PUR-1 research reactor. The enclosed report presents the results of that inspection.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations of activities in progress.

Easad on the results of this inspection, no noncompliance of NRC requirements was

identified. No response to this letter is required. Material conditions have improved

'significantly since the last inspection.

In accordance with 10 CFR 2.790 of the NRC's ". Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Fublic Document Room.

Should you have any questions concerning this inspection, please contact Mr. Thomas

Burdick at (630) 829-9864.

Sincerely,

-

,

ORIGINAL SIGNED BY:

Ledyard B. Marsh, Chief

Events Assessment, Generic Communications and

Non-Power Reactors Branch

< Division of Regulatory Improvement Programs

Office of Nuclear Reactor Regulation

Docket No. 50-182

I

License No. R-87

Enclosure: NRC Inspection Report No. 50-182/99-201

cc w/enclocure: See next page

i

\\

DISTRIBUTION: w/ enclosure -

//0

E-MAIL

liARD COPY

g\\

TDragoun

. CBassett

gDocket File 50-1823

DMatthews

PDoyle

TMichaels

PUBLIC

LMarsh

WEresian

- Pisaac

EHylton _

REXB r/f

' AAdams .

SHolmes

GTracy, OEDO (016-E15) TBurdick

9905140004 990506

MMendonca

.

PDR

ADOCK 05000182

G

PDR

REXB:RI ' ^ 0 0 41EXB:PM }fpp[

REXB:BC h'y

R

LMarch

TBurdick

MMendonca

ton

5/f /99 '

5/ f/99

5/ /99

5/h/99

OFFICIAL RECORD COPY

DOCUMENT NAME: G:\\SECY\\BURDICK\\lR-99201

P

.

[ja%q

'

t

UNITED STATES

s

j

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D.C. 20566 4001

k.....,/

May 6, 1999

Mr. Robert Bean, Laboratory Director

1290 Nuclear Engineering Building

Department of Nuclear Engineering

Purdue University

West La'ayette, IN 47907

l

SUBJECT:

NRC ROUTINE, ANNOUNCED INSPECTION REPORT NO. 50-182/99-201

Dear Mr. Bean:

This refers to the inspection conducted on April 12-15,1999 at the Purdue University

PUR-1 research reactor. The enclosed report presents the results of that inspection.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations of activities in progress.

Based on the results of this inspection, no noncompliance of NRC requirements was

identified. No response to this letter is required. Material conditions have improved

significantly since the last inspection.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

Should you have any quections concerning this inspection, please contact Mr. Thomas

Burdick at (630) 829-9864.

Sincerely,

Ledyard B. Marsh, Chief

Events Assessment, Generic Communications and

Non-Power Reactors Branch

Division of Regulatory improvement Programs

Office of Nuclear Reactor Regulation

Docket No. 50-182

License No. R-87

Enclosure: NRC Inspection Report No. 50-182/99-201

cc w/ enclosure: See next page

-

- - -

7; .

.

t

-O

Purdue University

Docket No. 50-182

cc:

Mayor

City of West Lafayette

- 609 W. Novajo.

West Lafayette, IN 47906

State Board of Heilth

ATTN:. Director, Bureau of Engineering

1330 West Michigan Street

Indianapolis, IN 46206

Ed Merritt

Reactor Supervisor

l

Department of Nuclear Engineering

Purdue University

West Lafayette, IN 47907

.

I

1

i

i

J