ML20206K762
| ML20206K762 | |
| Person / Time | |
|---|---|
| Issue date: | 05/08/1999 |
| From: | Carpenter C NRC (Affiliation Not Assigned) |
| To: | Rickard I ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| Shared Package | |
| ML20206K759 | List: |
| References | |
| NUDOCS 9905130277 | |
| Download: ML20206K762 (2) | |
Text
.
p
.. +g UNITED STATES s
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30086 4 001
%g May 8, 1999
\\
-Mr. Ian C. Rickard, Director, Nuclear Licensing Combustion Engineering, Inc.
2000 Day Hill Road Post Office Box 500 Windsor, CT 06095-0500
SUBJECT:
ACCEPTANCE FOR REFERENCING OF LICENSING TOPICAL REPORT CENPD-389-P, "10x10 SVEA FUEL CRITICAL POWER EXPERIMENTS AND CPR CORRELATIONS: SVEA-96+"
Dear Mr. Rickard:
We have completed our review of the subject topical report that was submitted by the ABB-CE Corporation by letter dated June 9,1998. The report is acceptable for referencing in licensing applications to the extent specified and under the limitations delineated in the report and in the associated NRC safety evaluation, which is enclosed. The safety evaluation defines the basis for acceptance of the report.
We do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the reports.
In accordance with procedures established in NUREG-0390, it is requested that the ABB-CE Corporation publish accepted versions of this report, proprietary and non-proprietary, within 3 months of receipt of this letter. The accepted version shallincorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identific. tion symbol.
Should our criteria or regulations change so that our conclusions about the acceptability of the report is invalidated, ABB-CE and the licensees reforencing the topical report will be expected to revise and resubmit their respective documentation, or to submit justification for the continued effective applicability of the topical report without revision of the respective documentation.
Sincerely, C asd C
hia A. Carpenter, Chief Generic lasues, Environmental, Financial &
99 51 9
)f Rulemaking Branch Division of Regulatory improvement Branch C
PDR Office of Nuclear Reactor Regulation i
Enclosure:
As stated
)
u
,y_
eu,m.e-t-
^.* -
- Wue* * * " '
ABB-Combustion Engineering, Inc.
cc:
Mr. Charles B. Brinkman, Director Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. lan C. Rickard, Director Nuclear Licensing ABB-Combustion Engineering, Inc.
Post Office Box 500 2000 Day Hill Road Windsor, Connecticut 06095-0500 l
l-L t
96
.1
-==^ *