ML20206K551

From kanterella
Jump to navigation Jump to search
Discusses Rept of Changes to Oregon State Univ Triga Reactor Emergency Response Plan Which Do Not Decrease Effectiveness of Plan,Per 10CFR50.54(q). Revs to Emergency Response Plan & Implementing Procedures Encl
ML20206K551
Person / Time
Site: Oregon State University
Issue date: 11/21/1988
From: Andrea Johnson
Oregon State University, CORVALLIS, OR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811290446
Download: ML20206K551 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

a r

3 E".

Radiation Center University conomi, oregon orm amm v

November 21. 1988

)

U.S. Nuclear Regulatory Comission Washington, DC 20555 Attention:

Document Control Desk

Reference:

Oregon State University TRIGA Reactor (OSTR). Docket No. 50-243 License No. R-106

Subject:

10 CFR 50.54(q) Report of Changes to the OSTR Emergency Response Plan Which Do Not Decrease the Effectiveness of the Plan Gentlemen:

It has come to my attention that you were sent the wrong letter of transmission with respect to recent changes in the OSTR Emergency Response

Plan, in our submission of these changes to you, you *. tere sent a copy of the cover letter intended for the local holders of the plan requesting them to update their copies of the plan instead of our letter t,ubmitting tk.e changes to the NRC under the provisions of 10 CFR 50.54(q).

The annual review of the OSU Radiation Center and TRIGA Reactor Emer-gency Response Plan was recently completed, and as a result of this a number of revisions were proposed.

These changes were reviewed and approved by the OSTR Reactor Operations Comittee, who concluded that the changes did not decrease the effectiveness of the plan and therefore could be made under the provisions of 10 CFR 50.54(q).

To enable you to easily review the changes they have been listed in Attachn.ent A.

You have already been sent the necessary pages to update your copies of the plan.

4 7

4 oregon Sts:e unHtsy is an Amtmasve Anon /Equs) Opportung Ereycyer

~

USNRC November 21, 1988 We would like to apologize for not sending you the correct cover letter in the first mailing.

If you have ary questions on this matter, please let me know, ours sincerely, I

A.

. J hnson Dir AGJ/ef/12-052 cc:

Standardization and Non-Power Reactor Project Directorate, Division of Reactor Projects !!!, IV, V, and Special Projects, Office of Nuclear Reactor Projects Washington, DC 20555, Attn. Mr. Al Adams Regional Administrator, USNRC Revion V Director. Oregon Departnent of Energy, Salem, Oregon Prof. S. E. Binney, Chat man, Feactor Operat ans Comittee Prof. B. Dodd, Reactor Actinistrator Prof. J. F. Higgi,1botham, Senior Health Physicist

.d O

o ATTACHENT A Revisions to the Emergency Response Plan and implementing Procedures Emergency Response Plan Page No.

Change Cover Upoite for latest revision number.

1-1 Delete reference to the 14 HeV neutron generator.

It is no longer operational.

2-2, 3 Change OSTR Reactor Administrator to Radiation Center Director in definition of Operation Boundary and Site Boundary.

This is needed because of a change in personnel titles.

3-6 to 10 Change the line of succession to accoccodate Radiation Center title and organizational changes.

3-7 Change the duties of the Emergency Director so that the individual now notifies and coordinates with the OSU Administration rather than reporting to the Radiation Center Director. This is needed because the Emergency Director is now the Radiation Center Director, if he is presenE 3-13 Replace the organizational diagram with the 7evised version given in the new Technical Specifications.

7-5 Add reference to ERIP 3.0 when OSTROP 1.0 is referenced.

These are the same document, but ERIP 3.0 is usually kept with the Einergency Plan, and therefore the easiest to check, 10-2 Change the titles of the Assistant Director for Radiation Protection and Regulatory Affairs and Assistant Reactur Administrator to Radiaticn Center Director and Reactor Administrator respectively.

This is consistent with l

the recent organizational and title changes, j

A-4 Replace the Radiation Center floor plan diagram with a more up-to-date version.

Emergency Responte implementing Procedures Cover

]

ERIP O Cover ERIP 1 Cover

> Update for latest revision number.

ERIP 2 Cover ERIP 5 Cover

.4

.g.

t i

t Change Page No._

?

I ED 0-3 7 Delete the requirement for the Emergency Director to l

ED-1-3 k

notify the Radiation Center Directir as they are now the same person.

E-5-10 Change the initial emergency response duties of J. Higgin-botham to be consistent with the line of succession changes in the plan, and to add his First Aid Responder role.

E-5-11 Add the First Aid Responder role to the initial duties of D. Pratt E-5-12 Clarify the wording in one part of T.V. Anderson's initial emergency duties.

E-7-1 Make a grammatical error correction.

Change active to activate.

E-7-4 Replace the Radiation Center Directory with the latest version.

E-7-5 Update the telephone numbers of several support agencies.

E-7-6 Revise the Emergency Mobilization Chart to be consistent with the line of succession changes.n the plan.

-