Safeguards Evaluation Rept Supporting Amend 13 to License NPF-68
ML20206J247
Person / Time
Site: Vogtle 
Issue date: 11/21/1988
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20206J240 List:
References
NUDOCS 8811280113
Download: ML20206J247 (4)


Text

- _ _ _

ENCLOSURE _2 Docket Nos.

50-424 50-425 SAFEGUARDS EVALUATION REPORT MISCELLANE0US AMENDMENTS AND SEARCH FEQUIREMENTS GEORGIA POWER COMPANY ALVih W. V0GTLE EL ECTF.!C GENERATING PLANT l

1.0 Introduction The Georgia Power Company (GPC) has filed with the Nuclear Regulatory Commission revisions to their Physical Security Plan for the Alvin W.

Yogtle Electric Generating Plant.

~

This Safeguards Evaluation Report (SGEP) summarizes how the licensee proposes to meet the Miscellaneous Arendments and Search Requirements revisions of 10 CFR Part 73.55.

Based on a review of the Physical Security Plan, the staff has concluded that the proposed changes satisfy Kiscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and accompanying 10 CFR 73.70 record reporting requirements. Accordingly, the protection provided will ensure that the public health and safety will not be endangerad.

2.0 Personnel Search The licensee has provided commitments in the Physical Security Plan to provide a search of all individuals entering the protected area except bona fide Federal, State and local law enforcement personnel on of'icial duty, through the use of equipment designed for the detection of firearms, explosives, and incendiary devices.

In addition, the licensee has provided commitments to conduct a phytical pat-down search of an individual whenever the licensee has cause to suspect that the individual is attempting to introduce firearms, explosives, or incendiary devices into the p.*otecteo areas; or whenever firearms or explosives detection equipnent is out c' service or not operating satisfactorily.

3.0 Vital Area Access GPC has modified their Alvin W. Yogtle Electric Generating Plant, Physical Security Plan to limit unesco.*ted access to vital areas during non-emergency conditions to individuals who require access in order to perform their duties. They have ^stablished current authorization access lists for each I

SS11280113 391121

~

PDR ADOCK 05000424 P

FDC

EhCLOSURE 2 2

Vital area which are updated and approved by th'e cognizant r.anager or supervisor at least once every 31 days.

GPC has assured that only individuals whose specific duties require access to vital areas during nonemergency conditions are included on their site access list. GPC has provided further assurance by revoking access and retrieving badges and other entry devices prior, to or simultaneously with notification of termination of an individual's unescorted facility i

access.

Based upon comitments made by the licensee in revisions to their Physical Security Plan, the staff has concluded that GPC meets the vital area access requirencntsof10CFR73.55(d)(7)(1)(A)(B)and(C).

4.0 Locks and Keys The licensee has comitted to providing methods to reduce the probability of ecmpromise of keys, locks, combinations, and related access control devices used to control access to their protected areas and vital areas. These methods include the rotation of keys, locks, combinations, and related access control devices every 12 months or the changing of these devices whenever tDere is evidence or suspicion that any key, lock, combination or related access control device may have been compromised or when an individual who has had access to any of these devices has had their access terminated due to a lack of trustworthiness, reliability or inadequate work performance.

Only persons granted unescorted facility access are issued such entry devices.

Based upon comitments rade by the licensee in revisions to their Physical Security Plan, the staff has concluded that GFC reets the requirements of 10 CFR 73.55(d)(9) to reduce the probability of ompromise of keys, locks, combinations, and related access control devices.

5.0 Emeroency Access The licensee has provided comitments to provide for the rapid ingress and egress of individuals during ervrgency conditions or situations that could lead to emergency conditions by assurios prompt access to vital equipment. An annual review of their physical security plans and contingency plans and procedures will be conducted to evaluate their potential impact on plant and personnel safety.

Emergency access is granted by a licensed senior operator.

Baste opon comitrents made by the licensee in revisions to their Physical Security Plan, the staff has concluded that CFC meets the requirements of 10 CFk 73.55 (o)(7)(ii)(B) to assure access to vital equipent during emergencies or to situatiers that may lead to an emergency.

ChCLOSURE 2 3

6.0 Protection of Secondary Power Supplies The licensee has provided conmitments to protect the on-site secondary power supply syster for alarm annunciator equipment and ren-portable communications equipment by including such equiprent within a vital area boundary.

Based upon comniitments made by the licensee in revisions to the'ir Physical Security Plan, the staff has ccncluded that GPC meets the requirerents of 10 CFR 73.55(e) in protecting the secondary power supplies of alarm annunciator equiprent and non-portable ccmrunications equipment.

7.0 Vital Area Entry / Exit Loccino The licersee has committed to maintaining a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.

Based upon commitrents made by the licensee in revisions to their Physical Security Plan, the staff has concluded that GPC meets the requirements of 10 CFR 73.70(d) by reintaining entry / exit log of individuals accessing vital areas (except the reactor control room).

8.0 Conclusien Based upon the above evaluation, we find that the licensee has met the requirements of the Miscellaneous Arendments and Search Pequirements revision to 10 CFR Part 73.55 and the record keeping requirements of 10 CFR Part 73.70.

j l

i

. 2.

Accordingly, paragraph 2.E. of Facility Operating License No.~ NPF-68 is hereby amended to read as follows:

Georgia Power Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of tne Miscellaneous Amendments and Search Requirer.ents revisions to 10 CFR 73.55 (51 FR 27817 and 27822).and to the authority of 10 CFR 50.90 and 10 CFA 50.54(p).

The plans, which contain Safeguards Infonnation protected under 10 CFR 73.21, are entitled: "Alvin W. Vogtle Nuclear Plant Physical Security Plan," with revisions submitted through January 6,1988; "Alvin W. Vogtle Nuclear Plant Guard Training and Qualification Plan," with revisions submitted through June 2, 1986; and "Alvin W. Vogtle Nuclear Plant Safeguards Contingency Plan," with revisions submitted through January 6,1988.

Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/s David B. Matthews, Director Project Directorate II-3 Division of Reactor Projects Date of Issuance:

November 21, 1988 I