Forwards Rev 19 to TMI-2 Organization Plan. Rev Reflects Proposed Change Resulting from Incorporation of Decontamination Section Into Waste Mgt Section.Fee Paid
ML20206H892
Person / Time
Site: Crane 
Issue date: 11/16/1988
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
4410-88-L-0180, 4410-88-L-180, NUDOCS 8811230427
Download: ML20206H892 (3)


Text

-

e e

e, GPU Hwlear Corporation 5

Nuclear

=st, s=8o e

Mdsetcen. Penns yivans 170574191 717 044 7621 TELEX 84 2386 Wr;ter's Direct Dial Number (717) 948-8461 Nosember 16, 1988 AAID-88-L-0180/0437P i

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Dear Sirs:

Three Mile Island Nuclear Station, Unit 2 (THI-2)

Operating License No. OPR-73 Docket No. 50-320 THI-2 Organization Plan Revision 19 Attached for PC review and approval is Revision 19 to the THI-2 Organization Plan. The revision reflects a proposed charge tt, the TMI-2 Site Operations Department resulting from the incorpoIation of the Decontamir ition Section into the Waste Management Section. As a result of this chang, the Decontamination Section would not show on the Organization Plan.

This proposal reflects a reasssssment of tre current work scope of the TilI-2 Decontamination program. The majority of the remainirr; THI-2 decontamirution activity is not expected to occur until transition to facility Mode 2.

Additionally, since the activities peformed by the Decontamination Section are closely related t1 Waste Management activities, it is appropriate that this section f all under the cognizarre of the waste Maragement organization.

Thas, it is anticipated that this reorganization will result in a more efficient ard ef fective use of resources in stoport of the remaining waste maragement and cleanup activity at THI-2.

Per the reouirements of 10 CFR 170, an application fee of $150.00 is enclosed.

Sirrerely,

'dh M. B. Roche Director, THI-2

'd 4 l[0 RDW/ emf gwn! Mgo if

(#

F GPU Nurear CCTc'at en is 3 5Lts d ary cf the Gereraf Futa : Ut r,'es Cerperaten

y.

', r

.. j cument Coritrol' Desit November IC,1988

.s,

4410-88-L-0180 p-4

,.i.

Attachment Enclosed: GPU Nuclear Corp. Check No. 018276 cc:. R. J. Conte - Senior Resident Inspector, TMI 3.

W. T. Russell - Regional Administrator, Region 1 J. F. Stolz.- Director, Plant Directorate IV L. H. Thonus - Project Manager, TMI Site 43 4

Y

'it 4

i t

4

'e

ENCLOSUR5 1*

ORGANIZATION PLAN TMi-2 orriCt orgst, DIRECTOR tRECTOR FIGURE 1.2 I

DEPUTY DIRECTOR I

PROGRAW CONTROLS

____q I

l LfCENSING AND PROJECT PLANNING RADIOLOQCAL S:TE OPERATICN3 DEFUELNC l NUCLEAR SAFETY AND ANALYSIS CONTROLS (2)_ _ _ _ _ _J l

I I

OFFICF OF l DEFUEgRTlNG l r WCOVERY PLANT PLANT DEFUElfNC DEFUELING LICENS:NG E v.

PRE OENT SUPP l

GROUP CPU NUCLEAR pWGNEERNC OPERATONS MANTENANCE ENGNEERING OPER ATIONS CORPORATON

"~~ !

W ASTE

{

lWANAGEMENT l

l SHFT SUPERVfSORS/

SH!FT FOREMEN (SRO)

I______________

l c q "#" I run m 'ac S

l l

l AUY1LI A RY OPERATOR lil ADVtSORY TO THE OFFICE OF THE D! RECTOR TMI-2 WITH RESPONSIBtLITY AND AUTHORITY TO NOTIFY THE OFFICE OF THE PRESOENT OF INACEOUATE REVISION 19 CONSOER ATIONS OF NUCLEAR AND R ADIOLOGICAL SAFETY ISSUES.

(2) COORDIN ATION OF INPL A 4T LICENSED OPER ATOR ACTIVITIES.

TWI20RGN