ML20206H656
| ML20206H656 | |
| Person / Time | |
|---|---|
| Site: | Wood River Junction |
| Issue date: | 06/24/1986 |
| From: | Crow W NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Gregg R UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.) |
| References | |
| NUDOCS 8606260248 | |
| Download: ML20206H656 (2) | |
Text
-
tW-JUN 2 41996 FCUP:GHB 70-820 UNC Recovery Systems ATTN: Mr. Robert J. Gregg
. Plant Manager One Narragansett Trail 4
Wood River Junction, RI 02894 Gentlemen:
In your May 2,1986, letter you requested a confirmatory survey of your property.
Because of former problems, we will a' wait your soil analysis results which hope-fully will show that UNC has removed the contaminated soil.
The attachment to your letter conveys impressions which need to be corrected.
The NRC has not changed its position on criteria for soil decontamination. We admit that our contractor did find an error in his analytical method which was conservative by 25 perceilt. The contractor discovered his error after UNC reported values which were nonconservative by about 2600 percent.
To facilitate license termination, please provide us with the analytical results for the soil and the dates when all licdnsed material will be removed from the site. With this information (assuming all remaining soil meets our decommissioning criteria) and continued favorable groundwater analyses, we can schedule our license termination actions.
Original signed bis W. T. Crow W. T. Crow, Acting Chief Uranium Fuel Licensing Branch Division of Fuel Cycle and Material Safety, NMSS DISTRIBUTION
- Docket NoL.70 820 2 NMSS R/F FCUP R/F VLTharpe GHBidinger(2)
LCobb, IE Region I e60626024sef024 goos 20 i
PDR LPDR PDR ADOCK PDR JRoth, RI c
0FC: FCUP
- FCUF
- FCUF
_________ g g________
______f_
NAME:GHBidinger/as:VLTharpe:WTCrow :
DATE:6/13/86
- 6/11#86 :6/>3/86:
OFFICIAL. RECORD COPY
,;,.