Responds to Violations Noted in Insp Rept 50-425/88-49 Re Failure to Protect Installed Equipment.Corrective Actions: Broken Flexible Conduit & Bent Instrument Line Condition Listed for Repair on Room Turnover Punchlist
ML20206H588
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/07/1988
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GN-1506, NUDOCS 8811230244
Download: ML20206H588 (2)


Text

T.

Georga Pv$c Compaw 1

Post Oftrce Box 282 W ymstora Georg4 30830 Te4ereon,404 554 9M1. EstensW 3413 404 724 8114. Exters on 3413

~

L

,. m.

3 "g

P 1: 37 Georgia Power v

s

,,, g, y,,,,,,c g., c, i

t November 7, 1988 United States Nuclear Regulatory Commission ATTN: Document Control Desk File:

X7BG10 Washington, D. C.

20555 Log: GN-1506

Reference:

Vogtle Electric Generating Plant - Unit 2 USNRC Inspection Report 50-425/88-49 Georgia Power Company wishes to submit the following infonnation i

concerning the violation identified in the referenced inspection report.

[

Violation 50-425/88-49-01 Failure to Protect Installed Equipment.

Georgia Power Company (GPC) acknowledges the violation as identified in the USNRC report.

This violation has been attributed to failure to follow guidelines established in Procedure GN-T-17. Housekeeping.

The broken flexible conduit and bent instrument line condition have been listed for repair on the room turnover punchlist.

A walkdown of the area revealed no further problems.

The water leak causing the corroded conduit and instrument tubing has been repaired and the corrosion removed.

The trash in the junction box has been removed and a box cover installed as a normal part of room / area turnover.

Re-inspections of rooms / areas that have been released fcr testing were done.

No additional problems were identified.

Additionally, Procedure GD-A-50, Area Turnover, requires all components to be inspected prior to turnover to Nuclear Operations at which time these type conditions are reported and corrected.

Full compliance was achieved November 3, 1988.

8811230244 001107 PDR ADOCK 05000425 O

PNU i)

.TEc /

r:

'o File:

X7BG10 Log:

GN-1506 November 7,1988 Page two These responses contain no preprietary information and may be placed in the USNRC Public Document Room.

?

n >N~

P. D. Rice b

FDR/wk1 xc:

USNRC - Region !!

Suite 2900 101 Marietta Street, N.W.

Atlanta, GA 30323 H. G. Baker, Jr.

D. R. Altman J. P. Kane R. P. Mcdonald J. A. Bailey C. W. Hayes i

R. H. Pinson G. Bockhold, Jr.

R. W. McManus C. X. McCoy G. R. Frederick Sr. Resident NRC)

E. D. Groover J. E. Swartzwelder C. F. Wreath OPC)

A. B. Gallant R. A. Thomas J. E. Joiner TSLA)

NORMS i