ML20206G785

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Repts 50-266/88-22 & 50-301/88-20.Discussion of Issue & Corrective Actions Re Violation Provided in Util
ML20206G785
Person / Time
Site: Point Beach  
Issue date: 11/17/1988
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CON-NRC-88-112 VPNPD-88-559, NUDOCS 8811220448
Download: ML20206G785 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

y io.

l wisconsin Electnc m ca.msr 131 W MICHIGAN.P O BOX 2046. MILWAUKEE.W153201 (414)221 2345 VPNPD-88-559 10 CFR 2.201 NRC-88-ll2 thvember 17, 1988 U.

S. Ni' LEAR REGULATORY COMMISSION Document Control Desk Mat.1 Station Pl-137 Wanhington, D. C.

20555 Geni,lcment DOC 1',fTS 50-266 AND 50-301 REPIT TO NOTICE OF VIOLATICN 50-2 5/88022-01 AND 50-301/88020-01 POIrq BEACH NUCLEAR PLANT, UNITS 1 AND 2 By 1Mter dated October 21, 1988, Region III transmitted the report of a routine safety inspection at Point Beach Nuclear Plant.

The letter stated that certain activities appeared to i

be in violation'of NRC requirements and enclosed a Notice of Violatinn identifying the matter.

Pursuant to 10 CFR 2.201, this 17ttar is in response to the Notice of Violation.

WiscontAn Electric agrees that the violation occurring during a Healtn Physics training session was properly classified as Severity Level IV.

Our discussion of the issue and correctiva actions t!or this item were provided in our letter to Mr. Nore.lius dated October 20, 1988.

If you hive any questions concerning our response, please Contact Mil.

Very truly yours, 4 ;.l /

dw f(

C. W. Fay Vice Presid9nt Nuclear pow r Copics to NKC Regional Ariministrator, Region III NP.C Resident Inspector IEol 881122C448 881117 PDR ADCCK 03000266 0

PDC l D

--