Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217A0001998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Haddam Neck Plant ML20217D7381998-02-28028 February 1998 Revised MOR for Feb 1998 Haddam Neck Plant ML20216D6531998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Haddam Neck Plant CY-98-012, Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant ML20198N6681997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Haddam Neck Plant ML20203K4271997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Haddam Neck Plant ML20199B1141997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Haddam Neck Plant ML20198J8811997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Haddam Neck Plant ML20210U9301997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Haddam Neck Plant ML20210L0521997-07-31031 July 1997 Monthly Operating Rept for July 1997 for HNP ML20149E4451997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Haddam Neck Plant ML20140H5241997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Haddam Neck Plant ML20141D4141997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Connecticut Yankee Haddam Neck ML20137W8051997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Haddam Neck Plant ML20137A0801997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Haddam Neck Plant ML20138K5721997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Haddam Neck Plant.W/ ML20133M6121996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Yankee Haddam Neck Plant ML20132B9861996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Connecticut Yankee Haddam Neck Plant ML20134K7331996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Haddam Neck Plant ML20128Q7661996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Connecticut Yankee Haddam Neck Plant ML20058P2691993-11-30030 November 1993 Monthly Operating Rept for Nov 1993 for Haddam Neck Plant ML20059M1881993-10-31031 October 1993 Monthly Operating Rept for Oct 1993 for Haddam Neck Plant.W/ ML20057G0561993-09-30030 September 1993 Monthly Operating Rept for Sept 1993 for Connecticut Yankee Haddam Neck Plant ML20057B3041993-08-31031 August 1993 Monthly Operating Rept for Aug 1993 for HNP ML20128H6131993-01-31031 January 1993 Monthly Operating Rept for Jan 1993 for Haddam Neck Plant.W/ ML20127E5711992-12-31031 December 1992 Monthly Operating Rept for Dec 1992 for HNP ML20126A5011992-11-30030 November 1992 Monthly Operating Rept for Nov 1992 for Haddam Neck Plant.W/ ML20217A1991990-10-31031 October 1990 Monthly Operating Rept for Oct 1990 for Haddam Neck Plant ML20058A0891990-09-30030 September 1990 Revised Monthly Operating Rept for Aug 1990 for Haddam Neck Plant Unit 1 ML20059J1301990-08-31031 August 1990 Monthly Operating Rept for Aug 1990 for Haddam Neck Plant.W/ ML20247F6141989-08-31031 August 1989 Monthly Operating Rept for Aug 1989 for Haddam Neck Plant ML20245L8191989-07-31031 July 1989 Monthly Operating Rept for Jul 1989 for Haddam Neck Plant ML20246K1831989-06-30030 June 1989 Monthly Operating Rept for June 1989 for Haddam Neck Plant ML20244E1511989-05-31031 May 1989 Monthly Operating Rept for May 1989 for Haddam Neck Plant ML20247A1291989-04-30030 April 1989 Monthly Operating Rept for Apr 1989 for Haddam Neck ML20244D0831989-03-31031 March 1989 Monthly Operating Rept for Mar 1989 for Connecticut Yankee Haddam Neck Plant ML20236C7591989-02-28028 February 1989 Monthly Operating Rept for Feb 1989 for Haddam Neck ML20206F6931988-10-31031 October 1988 Monthly Operating Rept for Oct 1988 for Haddam Neck Plant ML20207N6241988-09-30030 September 1988 Monthly Operating Rept for Sept 1988 for Haddam Neck.W/ ML20154H7701988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Haddam Neck Plant.W/ ML20151U8221988-07-31031 July 1988 Monthly Operating Rept for Jul 1988 for Haddam Neck Plant ML20151D4601988-06-30030 June 1988 Monthly Operating Rept for June 1988 for Haddam Neck Plant ML20155D2141988-05-31031 May 1988 Monthly Operating Rept for May 1988 for Haddam Neck Plant ML20154C5771988-04-30030 April 1988 Monthly Operating Rept for Apr 1988 ML20151F9941988-03-31031 March 1988 Monthly Operating Rept for Mar 1988 ML20150B9331988-02-29029 February 1988 Monthly Operating Rept for Feb 1988 ML20148G7771988-02-29029 February 1988 Reactor Coolant Data for Feb 1988 ML20149H3401988-01-31031 January 1988 Monthly Operating Rept for Jan 1988 ML20147D8761987-12-31031 December 1987 Monthly Operating Rept for Dec 1987 ML20237B9861987-11-30030 November 1987 Monthly Operating Rept for Nov 1987 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K3301999-10-19019 October 1999 Safety Evaluation Supporting Amend 195 to License DPR-61 ML20206C8761999-04-28028 April 1999 Safety Evaluation Supporting Amend 194 to License DPR-61 CY-99-047, Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use1999-03-23023 March 1999 Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use ML20206F1971998-12-31031 December 1998 Annual Rept for 1998 for Cyap. with CY-99-027, Annual Rept for 10CFR50.59, for Jan-Dec 1998.With1998-12-31031 December 1998 Annual Rept for 10CFR50.59, for Jan-Dec 1998.With ML20198G9101998-12-22022 December 1998 Proposed Rev 2 of Cyap QAP for Haddam Neck Plant. Marked Up Rev 1 Included ML20238F2131998-08-28028 August 1998 SER Accepting Defueled Emergency Plan for Emergency Planning for Connecticut Yankee Atomic Power Co CY-98-136, Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line1998-08-12012 August 1998 Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line ML20237B7461998-07-22022 July 1998 1998 Defueled Emergency Plan Exercise Scenario Manual, Conducted on 980722 ML20202D1621998-06-30030 June 1998 Safety Evaluation Supporting Amend 193 to License DPR-61 CY-98-068, Follow-up to Verbal Notification on 980413 of Film on Discharge Canal.Investigation Continuing.Samples Collected for Petroleum Analyses & Biological Characterization at Intake Structure & Discharge Canal.Replaced Sorbent Booms1998-04-15015 April 1998 Follow-up to Verbal Notification on 980413 of Film on Discharge Canal.Investigation Continuing.Samples Collected for Petroleum Analyses & Biological Characterization at Intake Structure & Discharge Canal.Replaced Sorbent Booms CY-98-045, Ro:On 980212,0219,0225 & 0312,separate Sheens of Approx One Cup of oil-like Substance Was Observed at Discharge Canal. Cause Has Not Been Clearly Identified.Called in Vendor Spill to Install Sorbent Booms to Absorb Sheen.W/One Drawing1998-04-13013 April 1998 Ro:On 980212,0219,0225 & 0312,separate Sheens of Approx One Cup of oil-like Substance Was Observed at Discharge Canal. Cause Has Not Been Clearly Identified.Called in Vendor Spill to Install Sorbent Booms to Absorb Sheen.W/One Drawing ML20217F0611998-03-31031 March 1998 Historical Review Team Rept ML20217A0001998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Haddam Neck Plant ML20217K2101998-03-27027 March 1998 Safety Evaluation Supporting Amend 192 to License DPR-61 CY-98-046, Follow-up to 980311 Verbal Notification of Film on Discharge Canal.Cause Not Yet Determined.Film Is Contained & Will Be Absorbed by Containment & Sorbent Booms That Were in Place in Discharge Canal1998-03-12012 March 1998 Follow-up to 980311 Verbal Notification of Film on Discharge Canal.Cause Not Yet Determined.Film Is Contained & Will Be Absorbed by Containment & Sorbent Booms That Were in Place in Discharge Canal ML20216D6531998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Haddam Neck Plant ML20217D7381998-02-28028 February 1998 Revised MOR for Feb 1998 Haddam Neck Plant CY-98-012, Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant CY-98-010, Annual Rept for 10CFR50.59,Jan-Dec,19971997-12-31031 December 1997 Annual Rept for 10CFR50.59,Jan-Dec,1997 ML20198N6681997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Haddam Neck Plant ML20217P4861997-12-31031 December 1997 1997 Annual Financial Rept, for Cyap ML20199L5891997-12-24024 December 1997 Independent Analysis & Evaluation of AM-241 & Transuranics & Subsequent Dose to Two Male Workers at Connecticut Yankee Atomic Power Plant ML20203K4271997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Haddam Neck Plant ML20199B1141997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Haddam Neck Plant ML20198M8101997-10-14014 October 1997 SER Accepting Proposed Revs to Util Quality Assurance Program at Facility ML20198J8811997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Haddam Neck Plant ML20210P8721997-08-31031 August 1997 Post Decommissioning Activities Rept, for Aug 1997 ML20217Q3171997-08-31031 August 1997 Addl Changes to Proposed Rev 1 to QA Program ML20210U9301997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Haddam Neck Plant CY-97-082, Special Rept:On 970708,routine Surveillance Testing of Seismic Monitoring Sys Instrumentation Revealed,Data Was Not Being Reproduced by Portion of Playback Sys.Station Presently Pursuing Replacement of Seismic Monitoring Sys1997-08-14014 August 1997 Special Rept:On 970708,routine Surveillance Testing of Seismic Monitoring Sys Instrumentation Revealed,Data Was Not Being Reproduced by Portion of Playback Sys.Station Presently Pursuing Replacement of Seismic Monitoring Sys ML20210L0521997-07-31031 July 1997 Monthly Operating Rept for July 1997 for HNP ML20149E4451997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Haddam Neck Plant ML20141A0041997-05-31031 May 1997 Independent Assessment of Radiological Controls Program at Cyap Haddam Neck Plant Final Rept May 1997 ML20140H5241997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Haddam Neck Plant ML20141K4201997-05-22022 May 1997 Safety Evaluation Supporting Amend 191 to License DPR-61 ML20141D4141997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Connecticut Yankee Haddam Neck ML20138G5901997-04-25025 April 1997 Proposed Rev 1 to Cyap QA Program for Haddam Neck Plant ML20137W8051997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Haddam Neck Plant ML20137H3031997-03-31031 March 1997 Rev 2 to Nuclear Training Loit/Lout Audit Reviews ML20137C6281997-03-14014 March 1997 Redacted Version of Rev 1 to Nuclear Training Loit/Lout Audit Reviews ML20137A0801997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Haddam Neck Plant ML20135C5101997-02-26026 February 1997 1996 Refuel Outage ISI Summary Rept for CT Yankee Atomic Power Co B16268, Special Rept:On 970205,declared Main Stack-Wide Range Noble Gas Monitor Inoperable.Caused by Inadequate Calibr Methods. Will Revise Calibr Procedure to Technique to Demonstrate Accuracy & Linearity Over Intended Range of Monitor1997-02-19019 February 1997 Special Rept:On 970205,declared Main Stack-Wide Range Noble Gas Monitor Inoperable.Caused by Inadequate Calibr Methods. Will Revise Calibr Procedure to Technique to Demonstrate Accuracy & Linearity Over Intended Range of Monitor ML20135E3221997-02-13013 February 1997 Independent Review Team Rept 1996 MP -1 Lout NRC Exam Failures ML20134L2751997-02-0303 February 1997 Draft Rev to GPRI-30, Spent Fuel Storage Facility Licensing Basis/Design Basis ML20138K5721997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Haddam Neck Plant.W/ ML20134L2791997-01-10010 January 1997 Rev 0 to QA Program Grpi ML20134L2911997-01-0808 January 1997 Rev 0 to UFSAR Rev Grpi ML20134L2721996-12-31031 December 1996 Commitment Mgt Grpi 1999-04-28
[Table view] |
Text
. _ _ _ _ _ _ _ _ _ _
Connecticut Yankee Atomic Pcwer Comp:ny IIaddam Neck Plant IIaddam, Connecticut I
i l
l l
Monthly Operating Report No. 8810 l
For The Month of October 1988 l
l i i
8311210272 981031 I6 PDR ADGCK 05000213 \j I R PDC
Plant Operations Summarv - November 1988 The following is a summary of plant operations for October 1988.
On October I at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, the unit was at a 65% power hold to replace the "C" Circulating Water Pump coupling. At 0652 hours0.00755 days <br />0.181 hours <br />0.00108 weeks <br />2.48086e-4 months <br />, repairs were completed and the plant commenced loading. At 0914 4
hours, the unit stopped the load increase at 81% power in order to realign the control rod positiening indicator. At 1117 hours0.0129 days <br />0.31 hours <br />0.00185 weeks <br />4.250185e-4 months <br />, with
! conditions stabilized, the plant resumed the load increase. Ily 1406 hours0.0163 days <br />0.391 hours <br />0.00232 weeks <br />5.34983e-4 months <br />, the unit was operating at 100% power.
On October 5 at 1343 hours0.0155 days <br />0.373 hours <br />0.00222 weeks <br />5.110115e-4 months <br />, the plant started a load reduction to evaluate a steam line set point deviation. At 1412 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.37266e-4 months <br />, with the unit at 99% power, normal conditions had been restored and a load increase was started. 13y 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, the load was restored to 100%
power.
j On October 25 at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />, the plant reduced load to investigate a problem with the "D" Traveling Water Streen. At 1605 hours0.0186 days <br />0.446 hours <br />0.00265 weeks <br />6.107025e-4 months <br />, the unit reached 56% load and held there to conduct repairs. Ily 2105 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.009525e-4 months <br /> repairs had been completed, and a routine Turbine Valve Test had been executed and the plant commenced loading.
On October 26 at 0135 hours0.00156 days <br />0.0375 hours <br />2.232143e-4 weeks <br />5.13675e-5 months <br />, the plant returned to 100% power.
On October 28 at 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br />, the Connecticut Yankee Atomic Power Company passed the 82 billion KW hours production mark.
The plant continued to operate at 100% power for the remainder of the month.
)
i i
r l
l I
to 8
-W b-
yuu<
O 4-me U
W
~0 Qas en e yq
~ E tt ,
O U t*
5 8 g w s:
- e. ~
W O w
32 d a
g b
a E
r d
a W
e u 5 irl e e: 5E t:
a "s Ew z e2
= n u 5 2 e
l 5
$$hO
>- 8.$0$
, uw e
M V - L ow .
l j
b to W O
?-
Maintenance Octeher SYSTEM 1988 EFFECT dN CORRECTIVE ACTION SPECIAL PRFCAUTIONS OR MALFUNCTION SAFE TAKEN TO PREVENT TAKD4 TO PROVIDE COMPONENT CAUSE RESULT CPERATION REPETITION FOR REACTOR SAFETT
, DURING REPAIR There are no reportable itemn f or the cannth of October 1988 O
AVERAGE DM*,Y UNIT POWER LEVEL DOCKET NO. 50-213 Conn. Yankee UNIT Haddam Neck DATEj l/1/88 COMPLETED BYJ. C. Wall TELEPHONE (203) 267-2556 _
MONTH: October 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PORER LEVEL (MWe-Net) (MWe-Net) 1 476 17 586 2 574 18 586 3 576 19 586 4 577 20 586 5 579 21 586 6 580 22 se6 7 581 23 588 8 ss? 24 588 9 584 25 512 10 584 26 _
586 11 585 _
27 587 12 sgs 28 587 13 587 29 588 14 ss7 30 588 15 587 31 588 16 587 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting conth. Complete the nearest whole megawatt.
(9/77)
. ~ - . _ - ~ _ _ , . _ - - - - _ . _ _ . _ _ _ - - _ ~ . _ , . . . _ - _
1 i
CONNECTICUT YANKEE REACTOR COOLANT DATA MONTH: 10-80 i
REACTOR COOLANT ANALYSIS MINIMUM AVERADE MAXIMUM f PH e 25 DEGREES C ! 6 94E+00 t 6.27E+00 1 6.54E+00 t CONDUCTIVITY (UNHOS/CM) i 1.30E+01 1.86E+01 1 2.40E+01 ! I CHLORIDES (PPM) I <5.00E-02 i <5 00E-02 8 <5.00E-02 i i DISSOLVED OXYGEN (PPD) t <5.00E+00 t <5.00E+00 t <5.00E+00 t [
BORON (PPM) ! 7.43E+02 i 7.94E+02 2 9.55E+02 ! 1 LITHIUM (PPM) i 1 18E+00 1 1.57E+00 t 2.30E+00 t !
TOTAL GAMMA ACT. (UC/ML) ! 2.32E-01 ! 5.84E-01 ! 1.17E+00 t
- IODINE-131 ACT. (UC/ML) 1.78E-02 i 2.17E-02 2 4.09E-02 ! (
I-131/I-133 RATIO i 1 47E+00 2 2.72E+00 1 5.46E+00 i !
CRUD (NG/ LITER) 1 <1.00E-02 3 <1.00E-02 ! <1.00E-02 i TRITIUM (UC/ML) ! 4.13E+00 t 4.28E+00 t 4.48E+00 t !
HYDROGEN (CC/KG) ! 2 33E+01 ! 2.52E+01 ! 2.62E+01 ! !
..................................................................... j r
AERATED LIQUID WASTE PROCESSED (GA8.LGWu,8 1.02E-05 WASTE LIQUID PROCESSED THROUGH PORON RECOVERY (GALLONS)! 0.00E-01 i AVERAGE PRIMARY LEAK RATE (GALLONS FER MINUTE)! 2.42E-01 PRIMARY TO SECONDARY LEAK RATE (GALLONS PER MINUTE)! 6.30E-04 l t
I i
[
t I
t
?
5 k
i I
l l
JRC OPttAflWG STATUS atPott Ned$am teck
- 1. Docket > 50 213
- 2. Reportlne Period 10'88 Outage + on Lirw mours: 0.0 + 745.e = 745.0
- 3. Utility contact: J. Stanford (203) 267 2556 est. 452
- 4. Licensed thernet Power (Wt): 1825
- . Nameplete Rating (Gross We): 667 a 0.9 m 600.3
- 6. Desten s'tectricot Rating (met we): 582
- 7. Maatsue Depecdebte cepecity (Gross we : 591.P
- 8. Maatsue Deperdoble Cepecity (Net we): 565
- 9. If changes occur above since Last report, reasono ere Wont
- 10. Power levet to which restricted, if any (het W e): N/A
- 11. Reasons for restriction, if any N/A I43NTN ttAR TO 0 Aft CLMA4flW
- 12. Report period hours 74*.0 7,320.0 182,640.0
- 13. Nowre reactor critl u t 745.0 4,713.0 150,902.0
- 14. Reactor reserve shutdown hours: 0.0 0.0 1,285.0
- 15. pours gererator on lines 745.0 4,576.8 144,764.6
- 16. Unit reserve shutd wt hours: 0.0 0.0 393.0
- 17. Cross ther**l energy ge wroted (Wtu): 1,346,916.0 7,9fe,648.0 250,736,652.0 *
- 18. Cross eiectrical energy generated ( Weu): 451,417.0 2,588,276.0 82,069,083.0 '
- 19. set electrical energy generated ( Wem): 431,167.2 2.445,638.8 T8,034,333.4 *
- 20. Unit service f actor 100.0 62.$ 79.3
- 21. Unit evettability factor 100.0 62.5 79.5 22.1.> tit cepecity f actor using eCC nett 102.4 55.9 77.9
- 23. Unit coposity f acter using cta net 99.4 57.4 ?),4
- 24. Unit forced owtage rate: 0.0 0.0 5.8
- 25. forced Atese hours: 0.0 0.0 8,9 75. 6
- 26. skutdewns sche &ted over neat 6 wths (tnw.cate, daration): nobt
- 27. If currently shutdw'., estimated starte dates h/A
- C:mlatine values f ren the first criticality (07/24/67). (The ree.alning cautative vatwes are f rom the first date of ccoviercist coeration. 01/01/68).
UNIT SHUTD0'4iS AND PWER REDUCIIONS DOCKET N0 0 50-213 UNIT NAME Connect icut Yankee DATE 11/15/S5 COMPLETED BY r_ c_ 5,sii REPORT MONTil October 1988 T.FP110NE 203-267-2556 w n oa n "
No. Date ,
e4 ., a g LER e Cause & Corrective e u a o j" " RPT. u oo Action to h $ o Prevent Recurrence E8-05 9-27-88 F 0 A n/a n/a NN P/CPLC Continuation of power reduction to repair coupling on "C" circulating water pin::p.
38-06 10-25-88 F 0 A n/a n/a NN SCN Reduced power to 56%
due to problems with "D" traveling water screen.
l 1 2 3 4
, F Forced Reason: Method: Exhibit G-Instructions S .cc heduled A-Equipment Failure (Explain) 11-Othe r(Explain 1-Manual for Preparation of Data B-Maintenance cr Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Othcr(Explain) (NUREC-0161)
E-Operater Training & License Examination
. F-Administrative 5 G-operational Error (l'.xplain) Exhibit 1 Same Source
r _ - _ _ _ _ _ _ __ _. . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
. I Refueling Inforation Request i y 1. Name of facility l
%ticut Yankee Atomic Power Company j
- 2. Scheduled date for next refueling shutdown. ;
September 9,1989
- 3. Scheduled date for restart following refueling. .
Octobee 31,1989 f
- 4. (a) Will refueling or resumption of operation thereafter require a technical j specification change or other license amendment?
r No (b) If answer is yes, what, in general, will these be? !
(c) If answer is no, has the reload fuel design and core configuration been i reviewed by your Phnt Safety P.eview Committee to detennine whethu any l unreviewed safety questions are associated with the core reload [
(Ref.10 CFR section 50.59)? ;
i No !
(d) If no such re,iew has taken pla e, when is it scheduled?
f July,1989
- 5. Schedsded date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations associated with refueling, e.g., new or different [
fuel design or supplier, unreviewed design or performance analysis methods, i significant changes in fuel design, new operstmg procedures. [
No !
t
- 7. The nmaber of fuel assemblies (a)in the core and (b) in the spent fuel storage pool, (a) 157 (b) 653 l r
S. 'Ihe present licensed spent fuel pool storage capacity ard the sire of any increate in !
licensed storage car city that has beca requested or is planned,in numbe of fuel t assemblies, i
'r 1168
)
9 The projected date of the last refueling that can be discharged to the spent fuel px>l assummg the present licensed capacity. [
- I
, 1996 i a !
I
! [
1 I
s CONNECTICUT YANKEE ATOMIC POWER COMPANY
- HADDAM NECK P3. ANT I RRs1
Dear Sir:
In accordance with reporting requirements of Technical Specification 6.9.ld, the Connecticut Yankee IIaddam Neck Plant Monthly Operating Report 88-10, covering operations for the period October ' 1988 to October 3;,1988, is hereby forwarded.
Very Truly yours, f
~
dtP Donald B. Miller, Jr.
A Station Superintendent D B M/mdw cc: (1) Regional Administrator, Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 (2) John T. Shediosky Sr. Resident inspector Connecticut Yankee [M2
'\
1968 Twenty Yeara of Servico
- 80 Billion Kilowatt Hours Generated 19 8 un av p-
. . _