ML20206F522
| ML20206F522 | |
| Person / Time | |
|---|---|
| Site: | Perry (NPF-58-A-017, NPF-58-A-17) |
| Issue date: | 11/16/1988 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20206F528 | List: |
| References | |
| NUDOCS 8811210185 | |
| Download: ML20206F522 (2) | |
Text
-
e TABLE 3.8.4.1-1 CONTAINMENT PENETRATION CONOUCTO'.
OVERCURRENT PROTECTIVE DEVICES 13.8 KV LOAD OVERCURRENT PROTECTION Primary Secondary 1833-C001A L1106 1R22-5012 1833-C001B L1205 1R22-5013 120V LOAD OR CIRCUIT 1B33-B1X Spaca Heater 1R25-5093-CB7 NA*
IB33-B3X Space Heater 1R25-5093-CB8 NA*
IB33-85X Space Heater 1R25-5097-Cd5 NA*
1833-B7X Space dester 1R25-5097-CBS NA*
1833-89X Space Heater 1R25-5093-CB9 NA*
1833-B11X Space Heater 1R25-5093-CB10 NA*
1833-B13X(SpaceHeater) 1R25-5097-CB7 NA*
1833-B15X (Space Heater) 1R25-5097-CB8 NA*
1Cll-C1X NA*
1H13-P653-CB1 1C41-88xB (Space Heater) 1R25-5043-CB21 NA*
I I
1F42-B4X (SpaceHeater) 1R25-5097-CB4 NA*
l
- Protected by fuse.
h$k k'tlb!! $$bb 40 p
FDL PERRY-UNIT 1 3/4 8-23 Amendment No.
17
TABLE 3.8.4.1-1 (Centinued) 120V LOAD OR CIRCUIT OVERCURRENT PROTECTION Primary Secondary 1R25-8516X OR25-5054-CB7 M*
1R25 8517X OR25-5054-CC13 M*
1R25-8245X 1R25-5057-CB12 NA*
IP56-B1060X 1R25-5053-CB34 NA*
1R25-8522X OR25-$153-CB13 M*
1R25-8515X 1R25-5053-CB25 M*
l l
- Protected by fuse.
PERRY - UNIT 1 3/4 8-24 Amendment No. 8, 17
_ _ _ _ _ _ _ _ _ _ _